Web Analytics Made Easy - StatCounter

Tender for Supply Of - Fabricated Side Stanchion Bracket (rh). Drawing No.:- Irs's Drg. No.w/lg-1845, Alt. 2. Material And Specification :- Is: 2062:2011 (rev. 7), Amend.no. 1 Of Nov. 2012 , Grade: E250 A.2. Item Detailss.no.pl Code(group)itemtypegst(y/n)stock /nonstockorderingconsiderfor Evalapprovingagencyinspectionagencycurrencyallowedestimatedrate1 37521962goods (y)stock --- Yestpi Agencyinr Description :description :- Fabricated Side Stanchion Bracket (rh). Drawing No.:- Irs's Drg. No. W/lg-1845, Alt. 2. Material And Specification :- Is: 2062:2011 (rev. 7), Amend. No. 1 Of Nov. 2012 , Grade: E250 A. [ Warranty Period: 30 Months After The Date Of Delivery ] in Kharagpur - West Bengal

Tender Details
Reference # :
45026705
Description :
Tenders for Supply Of - Fabricated Side Stanchion Bracket (rh). Drawing No.:- Irs's Drg. No.w/lg-1845, Alt. 2. Material And Specification :- Is: 2062:2011 (rev. 7), Amend.no. 1 Of Nov. 2012 , Grade: E250 A.2. Item Detailss.no.pl Code(group)itemtypegst(y/n)stock /nonstockorderingconsiderfor Evalapprovingagencyinspectionagencycurrencyallowedestimatedrate1 37521962goods (y)stock --- Yestpi Agencyinr Description :description :- Fabricated Side Stanchion Bracket (rh). Drawing No.:- Irs's Drg. No. W/lg-1845, Alt. 2. Material And Specification :- Is: 2062:2011 (rev. 7), Amend. No. 1 Of Nov. 2012 , Grade: E250 A. [ Warranty Period: 30 Months After The Date Of Delivery ]
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
08 Jun, 2026
Open date :
08 Jun, 2026
Publish date :
28 Apr, 2026
Location
Location :
Kharagpur - West Bengal ( IN )
Connect us via What's Up