Description :
Tenders for Supply Of Paint, Air Drying, Red Oxide Zinc Chrome Priming. Matl.& Specn : Is: 2074 / 2023 With Additional Requirements Of Icf/md/spec-045, (issue Status 02, Rev. 03), Dated 14.06.2007 With Rdso Amend. No. 1a (rev. 1.0). [ Warranty Period: 12 Months After The Date Of Delivery ]