Description :
Tenders for Shell Kit For Memu Tc1 Jk 941 A. Roof Assembly 94516001 000 01, Alt 'nil' - 1 No. Location Of Sidewall94514001 000 01, Alt 'nil' - 1 No. End Construction Alarm End 94515001 000 01, Alt 'a' - 1 No. End Construction Non Alarm End 94515002 000 01, Alt Nil' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-200, Issue Status 01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-315, Issue Status.01,rev.00 With Amendment No 01. B.supply Of One Coach Set Of Body Shell Items And Partition Frames For Memu/tc/jk 941 To Drawing Nos: 1. 94410076 000 01 Alt Nil -2 Nos. 2. 94510007 000 01 Alt 'b' - 1 No. 3. 94510002 000 01 Alt 'a' - 1 No. 4. 94410072 000 01 Alt Nil - 2 Nos. 5. 94410054 000 01 Alt Nil - 4 Nos. C. Underframe Arrangement 94111001 000 01, Alt 'nil' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status.01 Rev.02 With Amendment No.02. Special Condition : Packing As Per Icf/j&t/misc-2201,alt 'f'. Packing As Per Icf/j&t/sk-1809,alt 'a'. Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Underframes Hould Be Supplied As Normal Side Up & Side Bearer Side Down. Packing Condition As Per Icf/j&t/sk-1865, Alt 'a'. Stage Inspection. (a) Raw Materialstage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ]