Tender For tender for supply of procurement of chemical reagents for analyzers of swas n dm plant n spectrophotometer at rtps dvc d d -standard 1 for the 5500sc silica analyzer , 0.5 mg/l sio2 , 2l , reagent 1 for the 5500sc silica analyzer , 2l , reagent 2 for the 5500sc silica analyzer , 2l , reagent 3 package for the 5500sc silica analyzer , contains 2l bottle of di water and powder to be mixed together. , standard 1 hr for the 5500sc phosphate high range analyzer , 30 ppm po4 , 2l , reagent 1 for the 5500sc phosphate high range analyzer , 2l , reagent 2 for the 5500sc phosphate high range analyzer , 2l , reagent 3 for the 5500sc phosphate high range analyzer , 2l , amino acid f reagent powder pillows (600 mw) , citric acid powder pillows (600 mw) , molybdovanadate reagent (600 mw) , tptz iron reagent powder pillows (600 mw) , ferric ion solution (600 mw) , mercuric thiocyanate solution (600 mw) , copper reagent set , amino acid f reagent , citric acid/surfactant reagent , molybdate 3 reagent , di-isopropylamine (dipa) , sodium standard , 10 ppm , 1 l (600 mw) , sodium nitrate , 0.5 m 500 ml , (600 mw) , reference electrolyte , kcl , 3 m , 500 ml , (600 mw)
Tender For corrigendum : providing of custom bid for services - annual rate contract for unloading of domestic, imported coal rakes and oil rakes at mtps dvc
Tender For corrigendum : supply of 300 nb tail pipe ( reducer type) of collector tank, reducer from 300 nb to 150 nb, length: - 4630 mm , only conical set portion of collector tank with 5 mm ss liner for fae tower to be supplied. , water trap silencer for vaccum pump, pipe od- 450 mm, thick -8. 5 to 9. 2 mm length 1500 mm approx. , complete set of flushing apparatus below economiser hopper.
Tender For corrigendum : engagement of consultant to assess techno-commercial feasibility of green hydrogen and carbon capture project within the damodar valley in west bengal and jharkhand
Tender For corrigendum : providing of custom bid for services - custom bid for services - centralized rate contract for condition monitoring activities in thermal power plants of dvc for a period of two years