Tender For corrigendum : :dpr for design and construction of 20 mld x 2.5 peak factor = 50 mld main sewage pumping station, 20 mld sewage treatment plant based on sequential batch reactor (sbr) technology, tertiary treatment plant. boundary wall, roads, platforms, d.g. set, transformers, cctv camera, street light with pole and any other contingent work including operation maintenance for 3 months trail run and 5 years defect liability period complete in all respect at industrial area phase- i at panchkula, (haryana)
Tender For corrigendum : design, upgradation, construction, erection, testing and commissioning of existing 67.5 mld capacity main pumping station including renovation and upgradation of existing 15mld capacity sewage treatment plant based on extended aeration process to 30m
Tender For corrigendum : construction of sewage treatment plant of 10.00 mld based on sbr (sequential batch reactor) technology in sector-29, pinjore kalka urban comple
Tender For corrigendum : designing, constructing, testing, commissioning, operation and maintenance for 5 years after 12 months defect liability period for providing, testing and commissioning of raw water pipeline of 1800 mm i/d ms pipe, silt removal clarifiers 2 nos., raw water channel from silt removal chambers to 2 no. sedimentation cum storage tanks each of 308887.5 kl storage capacity, raw water rcc- m30 duct from storage tanks outlet to common raw water sump, lowering of sub-soil water table and construction of one unit of 100 mld automated wtp, cwr for 100 mld capacity common clear water sump suitable for 2 units of 100 mld each, common clear water and raw water pump house suitable for 2 units of 100 mld, clear water and raw water pumping machinery, mechanical dewatering of sludge, permanent dewatering system, ht and lt electrical works, scada and all other works contingent there to complete in all respects on turnkey basis for gmda at village basai water works - ii, gurugram, haryana
Tender For corrigendum : design and construction of 400 mld main pumping station (mps) and 100 mld stp along with power generation and oandm for 10 years after completion of 1 year defect liability period at behrampur, gurugram