Tender For corrigendum : upgradation to four lane with paved shoulder of kalavad-jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat on hybrid annuity mode.
Tender For corrigendum : rehabilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharashtra on epc mode. length 32.47 km tpc
Tender For corrigendum : construction of bypass road to rayagada town and jk pur town on nh-326 in the state of odisha. (bid ref no. 10 ce nh of 2024-25)
Tender For corrigendum : short term maintenance contract stmc in section soni to gadchiroli from km. 55.800 to 113.650 length 57.850 km. on sakoli lakhandur wadsa armori gadchiroli chamorshi ashti allapalli sironcha road nh353c in the state of maharashtra.
Tender For corrigendum : stmc on approach of existing old wainganga bridge on nh 353b from km 290.550 to km 290.900 km in gadchiroli district in the state of maharashtra.
Tender For corrigendum : upgradation to four lane with paved shoulder configuration of the nashik to peth section of nh848 from km 11.600 to 53.600 excluding 4 lane sections length 36.371 km in the state of maharashtra on epc mode.
Tender For corrigendum : short term maintenance of mul city km 229.692 to 232.489 length 2.797 km section of jhalamal balod manpur cg border sawargaon murumgaon dhanora gadchiroli mul chandrapur road nh 930 in chandrapur district in the state of maharas
Tender For corrigendum : stmc of nh 63 section from a km 0.500 to 22.500 b 3.14km km approach road of major bridge on pranhita river in telangana state, 0.855 bridge proper length and 0.500 km approach road of major bridge on pranhita river in maharashtra state in gadchiroli
Tender For corrigendum : performance based maintenance contracts (05 years) from km. 76.000 to km. 99.971 of nh-42 in the state of andhra pradesh for the year 2024-25 under pbmc mode (2nd call)