Tender For supply of ss tubes & double ferrule fittings for lhb hot buffet coaches, as per drawing: mp23fitdf version 00, packing instruction: double ferrule pipe, fittings,hw,cla mps & brackets :- 1.s.s tubes/pipes:- pack 10 c/sets of material in a bundle wrapped wit h water proof jute fabric/biodegradble material and tied with steel wire . further pack such 10/20 bundles in steel cage (sq.tube.cage) which should have provision of liftinging by fork lifter . order no ,pl no, description of the item, drg.no/spec.no ,q ty, firm's name & address and date of despatch have marked by paint/ink on this case . 2.pipe fittings:-pack 10 c/sets of all type of pipe fittings in water proof jute fabric bag rapped in suitable environme nt friendly material. packing slip to be taged with showing qty & varriety of fittings. 3.hardwares:-pack 20 c/sets of all type of hard w are items in water proof jute fabric bag rapped in suitable environment friendly m aterial. packing slip to be taged with, showing qty . 4. other brake related items:-pa ck 10 c/sets of all brackets , clamps , slack, lever, fork head etc in seperate jute ba gs and pack all these bags in small steel cage /box having materil packing slip tage d with , showing qty of each varriety. 5 pack all bags/cage mentioned at 2,3 &4 in a bi g steel cage (sq.tube.cage) which should have provision of liftinging by fork lifter . packing slip taged with , showing qty of each varriety, order no ,pl no, descriptio n of the item, drg.no/ spec.no ,qty, firm's name & address and date of despatch shou ld be taged with this case. note: alternate bio-degradable material may also be use d . [ warranty period: 30 months after the date of delivery ]
Tender For supply of aluminium profile l=2350 mm, as per drawing: la10129 alt nil, packing instructio n no. pi140 ver1.0 or pi193 ver1.0 [ warranty period: 30 months after the date of delivery ]
Tender For supply of the cost of the basic machine i.e.cnc press brake hydraulic 800t as per specification no. mec h/m&p/3700/11 revision:-nil. [ warranty period: 30 months after the date of delivery ]
Tender For supply, installation , testing & commissioning of 800 kva transformer level 2 or above, as per spec . no. rcf/el/mrs/800 kva/tr/level ii dated 31.03.2023 , with all accessories such as terminations of ht cabl es , earthing connections etc and all necessary modifications in mounting arrangements/cable trench etc. includi ng any petty engg. work required for installation, alongwith removing of existing old transformer. [ warranty peri od: 30 months after the date of delivery ]
Tender For supply of the cost of the basic machine i.e.shot blasting plant for bogie as per spec no. mech/m&p/3700/7 rev.- nil. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of skirtings for lhb coaches, as per drawing: mpllhbskirting version 1, pa cking instruction: pi042 ver 1.0,as per standard packing. it should be ensured that item sh ould not rub during transportation. the item should be packed with adequate stre ngth. transit damage , if any , shall be at the cost of supplier. [ warranty period: 30 mont hs after the date of delivery ]
Tender For supply of sealing ring a 105/130/12, as per drawing: din 3760/a, packing instruction: as per stand ard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ]