Get complete information related to latest Food Grains Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Food Grains Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Food Grains Tenders.
Tender For corrigendum : supply of scotch danger caution tape as per specn. no. clw/es/3/0161/a or latest (set details attached in doc. tab) [ warranty period: 30 months after the date of delivery ]
Tender For supply of heavy duty 2-legged chain sling attached with "o" type main ring at top and crab hook at bottom connected with connecting link. detailed specification as per annexure-a. [ warranty period: 30 months after the date of delivery ]
Tender For supply of auto darkening welding helmet for mig/mag welding as per specification attached as annexure -i [ warranty period: 30 months after the date of delivery ]
Tender For supply of petrol engine water pump 4 inch , 7hp detailed make sthil, honda, yamaha, husqvarna or similar (specification attached ) rates inclusive with gst [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of set of items consists of (1). tamper check paste (30ml) highly visible viscous and fluorescentin nature. colour: orange, tip size: 2.9mm, extra single nozzle of 1 mm and 2 mm qty-2000 nos. (2). metal marker tube type (60ml) of nozzle 5mm, extra nozzle of 2,3,4 mm qty-250 nos. colour white (3). metal marker fine tip (30ml) of nozzle 1.2mm, colour: yellow, qty-250 nos, as per attached annexure 'a', material required for vb rakes and demu rakes [ warranty period: 30 months after the date of delivery ]
Tender For tyre defect gauge for bg wagons as per drawing plate no.52 rule 3.3.5 & s 4.19.1 of irca part iii enclosed at annexure. condemning thin flange 16 mm and flatness 60 mm. to be supplied with calibration certificate must be submitted at the time of supply of item. specifications and drawing are attached in documents. [ warranty period: 30 months after the date of delivery ]