Get complete information related to latest Material Handling Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Material Handling Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Material Handling Tenders.
Tender For biennial rate contract for annual maintenance of 100 mt and 32 mt weighbridge installed in front of ecr and near 120 mw old track hopper respectively at atps chachai
Tender For corrigendum : biennial contract for deployment of service engineer for repairing servicing of tractel tirfor make hoist at chp mm ntpc darlipali
Tender For conveyor pulleys rubber lagging work by cold vulcanizing at chipper house at tnpl unit - ii - conveyor pulley's rubber lagging work by cold vulcanizing at chipper house at tnpl unit - ii, trichy.
Tender For tender for supply of different type of lifting equipments : : 5 =5 =--chain pulley block capacity 10 t , chain pulley block capacity 5 t , chain pulley block capacity 2 t , tirfor hand winch capacity 8 t , tirfor hand winch capacity 5 t , flange 260 mm od x 170 mm id x 16 mm thickness with 8 holes 230 mm pcd moc ms
Tender For annual maintenance service contract for weighing equipments at wagon tippler and track hopper of m/s avery india pvt ltd., make for the year 2026 in chp at ktps-v and vi stages
Tender For repairing, servicing and overhauling of five numbers chain pulley block at sse ps, keorapukur mps, kudghat and buroshibtala dps under kudghat unit/s and d department.
Tender For corrigendum : scope of work:1. insertion of log gate & screen removal & cleaning.2. preparation and fabrication of necessary arrangement for maintenance of back-up acw, fire hydrant /spray and raw water pumps.3. decoupling of pump and motor, removal of motor skirt and shifting of motor from skirt.4. dismantling of thrust bearing and bearing housing.5. dismantling of complete column pipes, enclosure pipe, shafts, impellers etc.6. complete dismantling of back-up acw, fire hydrant /spray and raw water pumps.7. issue and shifting of spares from store to the site.8. repairing and replacement of worn out parts and d.p. test of spare parts, impellers, shaft and sleeves, bearing housing etc.9. cleaning of all column pipes and enclosure pipe and painting with black paint.10. painting of top column pipe, motor skirt & motor with blue/smoke gray colors. painting of bearing cooling water line and discharge pipe of back-up acw, fire hydrant /spray and raw water pumps with green paints.11. assembly of pump as per oem guideline and shifting of motor on its skirt.12. alignment checking of pump and motor coupling.13. coupling of the pump after motor trial.14. removal of log gate after screen fixing. 15. commissioning of the pump & trail. terms and conditions: 1. the contractor shall have to arrange all men, machine, t&p, consumable, dp test kit including entire qty. of blue/green/ black bituminous paints of shalimar/berger/asian brand at their cost. 2. completion period: within 8 days for each pump from the date of handling over.3. payment terms: 100% payment shall be released after successful overhauling and commissioning of each pump, within 45 days.4. penalty terms: penalty shall be imposed @ rs. 1000/- per day or part thereof due to delay in work but limited to 10% of order value if delay in completing the work.5. mobilization period: firm has to mobilize his team & t&p for start of work within 7days after intimation from engineer-in-charge otherwise penalty @ rs. 500/- per day shall be imposed till start of work.6. guarantee: complete overhauling work is to be guaranteed for minimum 06 months against spurious paints and poor workmanship.7. the contractor will have to provide all necessary safety appliances to his workers engaged and he will be fully responsible for safety of his workers.8. contract period one year. scope of supply(a) cspgcl scope:1. spares of above pumps, fasteners will be provided by cspgcl kw.2. eot crane, compressed air, electricity, water will be provided by cspgcl free of charge.3. workshop facility shall be provided by cspgcl kw.(b) contractors scope:1. all men power, tools tackles, chain pulley block, measuring instrument, welding machine, cutting set, grinders consumable material rustolene, welding electrode, grinding stone, teflon tap, paints etc. shall be arranged by contractor.2. crane operator will be arranged by contractor. executive engineer (tmd-ii, bop) 1x500 mw, cspgcl, htps, kwb
Tender For providing of repair and overhauling service - built up trucks; ashok leyland mrs; yes; buyer premises,repair and overhauling service - forklifts (v2) as per is 6765:2003 and is 10517; godrej fork lift; yes; buyer premises