Tender For corrigendum : providing street light phase at ashok nagar havambaavi karimaremma colony siddarh nagar kolagal road and other areas so 6 and 9 and bisilahalli jnatha nagar and gonal areas rsd so 2 in ballari city
Tender For tender for road construction work of platform , construction of ayodhyawasi vaishya samaj building, extension work of slrm center filter plant, chlorination unit installation work and automatic water chlorination system installation work at various locations
Tender For supply of secondary lateral damper for fiat bogie with air spring to rdso drg.no.rdso/cg/drg/21 049 alt. '2' and rsdo specification no. rdso/cg-18005 rev. 01. [ warranty period: 72 months after the date of delivery ]
Tender For supply of portable emergency lighting equipment box ( peleb) suitable for 110 v dc tl syst em as per rdso spec. no. rdso/pe/spec/tl/0012-2000 rev 0 june 2000 with ammendment no. 1 add itional requirement over and above specification is the length of 02 no. ,flat twin core-fle xible copper cable at slr no-4 in drg.no-skel 2356 will be 20 meters each and size of the com parment provide led lamp & holder at slr no. 3 , drg no.-skel 2356 will be more then 230mm. [ warranty period: 30 months after the date of delivery ]
Tender For supply of funnel for slr coaches, as per drawing: lb64140 (colour shade ral-9006, md4 6271 dt 18.01.2021), packing instruction: pi042 ver 1.0: as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed wi th adequate strength. transit damage , if any , shall be at the cost of supplier. [ warra nty period: 30 months after the date of delivery ]
Tender For supply of set of lavatory floor complete for disabled person's lavatory in lhb slr h og coaches (31-seater), as per drawing: mplssilwslrd version 1 [ warranty period: 30 month s after the date of delivery ]
Tender For supply of partition frame set of slrd for shell, as per drawing: mppfwslrds version 10 [ warranty period: 30 months after the date of delivery ]
Tender For supply of hand hold complete for the disabled compartment as per drg.no.icf/slr2-6-4-205 alt e. [ w arranty period: 30 months after the date of delivery ]