Web Analytics Made Easy - StatCounter

Abutment Tenders

Get complete information related to latest Abutment Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Abutment Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Abutment Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44790001 Due date: 29 Apr, 202629 Apr, 2026 NA
Tender For assembling,linking by hsfg bolting,providing h-beam sleeper and launching of steel girder on abutment of bridge no. 100 (1x76.20m)by using calender-hamilton span as a launching nose to facilitate the end launching over shah canal at km22/758.9 in between patial-hazipur in mex-talwarasection i/c with nangaldam-talwara new bg lineand taking over siding mukerian-talwara in jurisdiction of bridge line jat

State Government

CTN :44779089 Due date: 17 Apr, 202617 Apr, 2026 4.76 Lacs
Tender For sh construction of protection work of approaches on riyali bridge kodu bela side abutment on upstream at km.0.920 in length 5.00mtr

State Government

CTN :44789181 Due date: 16 Apr, 202616 Apr, 2026 33.44 Lacs
Tender For earth work excavation pccm10 for foundation m25 concrete for abutment girder retains tmt fe 550 steel reinforcement and approach road etc.only for catogary-ii(a) communities only

Corporations And Associations And Others

CTN :44788010 Due date: 13 Apr, 202613 Apr, 2026 NA
Tender For cleaning and removal of the legacy waste and msw lying along railway tracks by hiring of manual labour and machineries on the stretches falling under the jurisdiction of shahdara south zone i.e old iron bridge to shahdara railway station and anand vi

Central Government And Public Sector

CTN :44773040 Due date: 20 Apr, 202620 Apr, 2026 NA
Tender For supply of abutment ring as per clw drg.no.1209-01-311-013 alt-1 (abb drg. no. 1b 016 00465) for wag-9/wap-7 loco. [ warranty period: 30 months after the date of delivery ]

Corporations And Associations And Others

CTN :44742018 Due date: 10 Apr, 202610 Apr, 2026 NA
Tender For cleaning and removal of the mixed waste an msw being dumped regularly along railway tracks and upkeep the tracks garbage free by deploying manual labour and machineries on the stretches falling under the jurisdiction of shahdara south zone i.e old ir - cleaning and removal of the mixed waste & msw being dumped regularly along railway tracks and upkeep the tracks garbage free by deploying manual labour and machineries on the stretches falling under the jurisdiction of shahdara south zone i.e old iron bridge to shahdara railway station and anand vihar railway station to mandawli railway station for a period of 03 years

corporations/Associations/Others

CTN :44759508 Due date: 09 Apr, 202609 Apr, 2026 NA
Tender For construction of abutment to culvert near park near h/o sh. udyan ukhal at purani mandi w. no. 2 mandi

Central Government/Public Sector

CTN :44717053 Due date: 09 Apr, 202609 Apr, 2026 29.75 Lacs
Tender For construction of wing wall and strengthening of bridge abutment and piers for pbnw

State Government

CTN :44761306 Due date: 13 Apr, 202613 Apr, 2026 3.54 Lacs
Tender For invited under earmarked works - scs/sts/ waddera/sagara (uppara) societies and individuals belonging to such communities as the case may be are only eligible to participaterepairs and restoration of weir and abutment of devuni cheru, rajampet (v) and (m), kamareddy dist.

CTN :44757118 Due date: 23 Apr, 202623 Apr, 2026 9.00 Lacs
Tender For fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur furnace , makin
 Loading, Please wait...

Connect us via What's Up