Get complete information related to latest Actuator Diaphragm Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Actuator Diaphragm Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Actuator Diaphragm Tenders.
Tender For c2 relay valve rubber part kit consisting of 9 items. s. no. description wabco no. rdso drg. n o. qty/set .1) diaphragm 536300 skdp.3053 alt.1 - 1 no. 2) o ring 11/16" od 532257" sk.dp-3031 - 1no. 3) o ring 15/16"od 524614 sk dp 3031 - 1no. 4) 'o' ring 17/16" od 526329 skdp-3031 - 1no. 5) o ring 15/8" od 532282 skdp-3031 - 1no. 6) seal exhaust valve 557396 skdp-3044 -1 no. 7) gasket 9/16" 527717 skdp-3033 - 1no. 8) gasket pipe bracket 580565 skdp-3047 - 1no. 9) seal supply valve 850047 sk dp-3664 - 1 no.
Tender For corrigendum : supply of description of item :- rubber kit for r6 relay air valve as per annexure sl.no. descript ion quantity (1 ) diaphragm 01 no (2 ) o'ring 01 no. (3 ) gasket 01 no (4 ) o'ring 01 no (5 ) 'o'ring 01 no (6) g asket 01 no specification :- drawing - kpa drg. no.er/kpa/el/gk.3g5.1988b [ warranty period: 30 month s after the date of delivery ]
Tender For corrigendum : supply of description:- rubber kit for c2w relay comprising of 9 items specification:- as per sl.no. item m/s wabco similar to qty/ set pt.no. rdso drg.no. (1 ) gasket 580565 skdp--3047 1 (2) gasket ring 527717 s kdp-3033 1 (3) diaphragm 536300 skdp-3053 1 (4) 'o' ring 532282 skdp-3031 1 (5) seal valve 557396 skd p-3044 1 (6) 'o' ring 524614 skdp-3031 1 (7) 'o' ring 532257/523842 skdp-3031 1 (8) seal 850047 skdp-366 4 1 (9) 'o' ring 536239 skdp-3031 1 [ warranty period: 30 months after the date of delivery ]
Tender For supply of rubber kit for lsd/vta valve [faiveley make] consisting of ten items. 1.diap hragm-- part no.531710100-qty-02 nos.per kit. 2.damper diaphragm--part no.531709100-qt y.-01 no.per kit. 3. o-ring part no.515702000-qty.-04 nos.per kit.4.valve shutter -part no. 531412100-qty.01 no.per kit. 5.gasket-klingerit-part no.780274700-qty.01 no.per kit. 6.o-ri ng part no.780275100aqty. 01 no.per kit . 7.o-ring part no.-780275000a-qty.01 no. per kit. 8 .o-ring part no.-531712000- qty-01 no.per kit. 9.guide bush part no.-531609000-qty.01 no. p er kit. 10.valve shutter part no.- 531273400-qty.-01 no.per kit. spec: ftrtipl part no 7905312 08 [ warranty period: 30 months after the date of delivery ]
Tender For spare parts for scania vehs - safety valve part no 562626, diaphgram part no 151476, hose part no 188283, rubber element part no 182342, sealing ring part no 203920, diaphragm part no 141813, drain cock part no 228491, hose part no 395911, hose part no 811179, nut 1/2" d part no 140530, o ring part no 182930, clamp part no 796364, connector part no 562653, gasket part no 139030, gasket part no 389453, gasket part no 235634, hose clamp d part no 796354, nylon strip part no 229249, o ring part no 804720, o ring part no 232396, o ring part no 562078, o-ring 9.2 x 3.5 part no 145526, plug part no 562539, ring part no 562548, switch part no 235944, washer part no 803006, solenoid vickers part no 562627
Tender For supply of diaphragm for diaphragm valve - neoprene rubber diaphragm size one and half inch 40mm , neoprene rubber diaphragm size two inch 50mm , neoprene rubber diaphragm size two and half inch 65mm , neoprene rubber diaphragm size three inch 80mm , spare neoprene body diaphragm size 150 mm
Tender For providing of custom bid for services - 200134226 maintenance contract of ci systems and equipments for fgd area at ntpcunchahar stage4 for one year- 10) maintenance contract of c&i systems and equipments for fgd area at ntpc-unchahar stage-4. 10.10 item service code no.: cipna00gn400 desc:- removal & remounting of pneumatic actuator(diaphragm type or power cylinder type) will consists of any combination of following activities: 1. removal of pneumatic connections and required instruments like solenoid valve, limit switch, afr, positioner, pft etc from actuator and decoupling from valve after ensuring proper isolation from process side. 2. removal of actuator from its position. 3. transportation of actuator from its location to a safe place. 4. remounting the actuator after clearance from mechanical maintenance. 5. re-fixing /replacing the related accessories removed earlier as per point no-1 above and restoring pneumatic connections including cable dressing, copper tubing, tagging etc. 6. final operation checking from local & control room (fgd ddcmis system) after calibration and feedback adjustment. defect liability period: 01 week 10.20 item service code: - cipna00gn106 des:- checking/pm of pneumatic control system pneumatic actuator (diaphragm type or power cylinder type) and its mounted accessories, will consists of any combination of following activities: a) checking/pm of solenoid valves mounted on pneu. act. i. check solenoid coil physical and electrical healthiness and tightness of terminals if required ii. clean its external parts. iii. check & adjust air supply pressure as per requirement iv. check tightness checking of all parts. v. energize with correct voltage and see solenoid valve operation if required as per instruction of area in charge. vi. if solenoid valve is not working or coil resistance is not adequate replace solenoid valve or coil and check operation. vii. tighten checking of wires at terminals & at junction boxes. b) checking/pm of positioner and position feedback transmitter mounted on pneu. act. i. check & adjust supply pressure as per requirement. ii. clean its external parts of positioner and check its operation, if necessary, as per instruction of area in charge. iii. if required, connect pneumatic test signal at i/p, 0.2 kg/cm2. adjust positioner zero adjustment spring, till actuator comes to zero position. adjust 4ma o/p of pft with zero pot. iv. raise pneumatic test signal to 1.0 kg/cm2 and adjust span of positioner, till actuator reaches 100% position. adjust 20ma o/p of pft with span pot. v. repeat steps ii to iv till the required repeatability is achieved. vi. tighten terminals at junction boxes. c) removal and restoration of c&i connections as per requirement during unit shutdown or as per requirement. i. removal of accessories like solenoid valves, positioner, i/p converter, air lock relay, air filter, air filter regulator, limit switch, position feedback transmitter, volume booster, pneumatic lines, etc. ii. keeping all accessories safely at suitable location. iii. restoration of all accessories removed and connection of air lines as per original scheme. iv. checking of functioning of actuator after restoration of connection. v. calibration / adjustment of complete system if required. d) checking/pm of i/p converter/smart positioners if any i. adjust supply pressure as per requirement. ii. check ma input to i/p converter/smart positioner. iii. check i/p converter/smart positioner o/p with portable gauge. it should correspond to its characteristic, if not, remove it and send to c&i lab for calibration/repair. iv. bring i/p converter/smart positioner from c&i lab and fit it in line. v. connect ma signal and normalize the system. vi. tighten terminals at junction box. e) checking/pm of regulating type actuator operation. i. check and adjust supply air pressure as per requirement of respective actuator. ii. set demand to 0% from control room after taking p