Get complete information related to latest Air Blaster Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Blaster Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Blaster Spares Tenders.
Tender For providing of custom bid for services - supply and laying of cables from mcc to filling shed for new auto o ring inserter cum remover machine at madurai lpg bottling plant
Tender For corrigendum : construction of rcc road from gatishakti multi model cargo terminal (gct) to btpp plant boundary, earth filling work for gatishakti wharf phase-2 and rcc road along the wharf at gatishakti at chausa, buxar, bihar
Tender For replacement of transformer oil of capacity 6.3mva 66/11kv, 3phase power transformer with new oil (supply in kpcl scope), including removal of old oil, arranging spare barrel/tank for unloading existing transformer oil and creating vacuum upto12 hours to completely dry out the transformer before filling new oil. replacement of gaskets of radiator, bucholz relay, hv & lv bushing, valves and mog.arranging mobile type oil filtration plant along with supervision staff for shiva hes.carrying out oil filtration of 6.3mva 66/11kv, 3phase power transformer including transportation of filtration machine and performing bdv test of oil before and after filtration and submission of test reports as per standards.supply and labour charges for smoke grey colour painting of 6.3mva 66/11kv, 3phase power transformer as per standards.
Tender For corrigendum : bid document for augmentation of w/s scheme sheikhowal (7 no.) group of villages in block garhshankar distt. hoshiarpur. providing and installing a new tubewell of size 200 mm i/d upto 160 mtr. depth b.g.l. with direct rotary rig. rising main 100 mm i/d tw to ct & replace 200 mm i/d ms rising main ct to ohsr , distribution system with g.i. pipe including sand filling, house servise connection on gi pipe chlorination plant, & installing 2 nos pumping machinery 330 lpm with 55 mtr head & 650 lpm with 256 mtr head and all other works contingent thereto complete in all respect. (under kandi area development board). zone-b
Tender For construction of c.c. road from main road to pani tanker filling point, e-riksha charging point, filter plant and pump house at shyama prasad mukharji ward no - 01
Tender For earth filling work in the proposed site for mrf and waste to compost plant at karimganj (chandsrikuna dumping yard) under 15th fc (tied grant)
Tender For provision of lpg cylinder filling facilities along with in-line allied equipment along with accessories and conveyor system at indane bottling plant, jamshedpur
Tender For comprehensive annual maintenance contract of total 13nos. of split type ac and 2 units duct ac installed at control room, turbine floor and generator hall at lph and chief office, hospital and guest houses located at talakalale and kargal 577421, sagar talluk, shimoga dist,karnataka.the scope of contract shall be to keep the air conditioners in normal working condition. attending to all breakdown and preventive maintenance of acs at lph, talakalale, kargal office,ib & hospital without any delay.the contractor shall supply and install the parts found defective for satisfactory maintenance of acs without any delay during the contract period as per the schedule list of spares. the contractor shall note down the equipment & accessories that are in service in present system.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract.compressors shall be replaced only when the existing compressor is found irreparable.spares to be provided for maintaining continuity of work.the successful service provider has to maintain ready stock of requisite spares in good condition throughout the comprehensive annual maintenance contract period to facilitate immediate replacement of defective parts.preventive maintenance for air conditioners.preventive maintenance shall be provided at least once in 3 months during prime shift hours of coverage at no extra cost. the firm shall monitor the performance of the systems, monitoring and cleaning, topping up of refrigerant gas, greasing of moving and running equipment, cleaning of filters etc., and give a report to the executive engineer(o&m)lph division head, kpc ltd.,breakdown maintenance for air conditioners-the agency should attend to all the breakdown call promptly & immediately.however in extreme case, if the spares not available immediately, repair shall be carried out within 2 weeks. efforts shall be made to rectify the system within 2 weeks. during the contract period the firm shall supply and install all parts found defective for satisfactory maintenance of air conditioners at no extra cost. it is the responsibility of the firm to bring all components to working condition. any leakage of gas in the piping/system shall be attended by the agency. filling up of refrigerant gas is also included in the scope of work. all repairs/rewinding/services related to the air conditioning system, electrical circuits, stabilizers, compressors or motors and all the accessories connected to ac system etc., are covered under comprehensive annual maintenance contract. all the spares and compressors are under the responsibility of the firm during contract period.replacement of defective parts-the firm shall supply and install all parts found defective during the comprehensive annual maintenance contract period in respect of acs at their own cost. original spares and compressors shall be used during contract period. in case of suitable replacement not available for defective components of air condition plant the firm shall undertake to provide a higher version components at no extra cost and the defective parts and components shall be handed over to kpcl.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract. compressors shall be replaced only when the existing compressor is found irreparable.