Web Analytics Made Easy - StatCounter

Air Conditioner System Tenders

Get complete information related to latest Air Conditioner System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Conditioner System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Conditioner System Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :38082738 Due date: 19 Nov, 202419 Nov, 2024 3.73 Lacs
Tender For corrigendum : annual maintenance contract for repair and maintenance of plant type air conditioner system fitted in 02 numbers idm70e model drill and 04 numbers idm30d model drill working at nigahi project, ncl

Central Government/Public Sector

CTN :38082742 Due date: 19 Nov, 202419 Nov, 2024 1.86 Lacs
Tender For corrigendum : annual maintenance contract for repair and maintenance of air conditioner system fitted in 03 numbers electrical dmh311 drill working at nigahi project, ncl at site

CTN :38227329 Due date: 22 Nov, 202422 Nov, 2024 1.90 Lacs
Tender For providing vrv vrf system air conditioners systems like hvac vrv vrf at academic building no 1 and 2 providing fixing false ceiling at academic building 1 2 and 3 in plot no 20 of nift kharghar navi mumbai sh providing service of computer operator 1 no in o o executive engineer c cpwd navi mumbai-i

Central Government/Public Sector

CTN :37959942 Due date: 16 Nov, 202416 Nov, 2024 NA
Tender For bid to ras providing of custom bid for services - custom bid for services - hrm assisting in preventive maintenance-1.0 assisting in preventive maintenance in hrm mechanical , the following works are to be carried out through-out the contract period , 2) preventive maintenance jobs based on daily monitoring basis: , a) daily monitoring of all hydraulic pipelines and attending the leakage (fitting changing, damaged , "o" ring changing, pipeline crack welding, etc.). , b) dally monitoring of sm top housing servo valve stand to identify moog & servo valve block , seating 'o' ring damage to avoid oil leakage. , c) daily monitoring of sm equipment like side guide, pinch roll hydraulic cylinder, feed/table roll , rotation, non-rotating rolls for jamming / bearing damage, air leakage identification and arresting. d). daily monitoring of internal cooling valve system condition, removal of steam locking in pipeline , and damaged hose (water) changing. , 2) assisting in mill equipment downtime / delays: , during equipment downtime/delays in hrm mechanical area, proposed man power shall be utilized to restore the mill at the earliest possible time. they will also be utilized for carry out observation / inspection points noted during rolling time to ensure equipment availability. , 3) area jobs (re-heating furnace, roughing mill, steckel mill, down coiler) a) re-heating furnace jobs , 1) rhf charging/discharging gear box connecting drive shaft flange bolts checking/changing. 2) rhf charging/discharging door chain guide roll greasing & chain greasing. , 3) rhf charging/discharging arm gearbox oil level checking & coupling bolts checking. , 4) rhf charging/discharging arm liner bolts tightness checking & replacement. , 5) rhf zone valves (gas & air) servicing & greasing. , 6) any other jobs assigned by qa/ea. , b) roughing mill jobs , 1) rm approach roller table rolls, front and rear mill table rolls, gear coupling welding. , 2) rm edger lower & upper fixed beam fixations changing. , 3) rm edger upper and lower fixed beam worn out portions build up by welding & grinding. , 4) rm main drive spindle balancing guide block fixation checking. , 5) rm main screw down screw clutch spring tension adjusting, cleaning & lubrication. , 6) rm uj joint cover bolts & flange bolts checking & changing. , 7) rm work roll cooling nozzle flushing and changing. , 8) rm work roll wiper pad changing. , 9) cobble pusher arms alignment., 10) cobble pusher extended platform repair work like uprooted support beam, web welding in case of , break down along plate pushing. , 11) crop shear gap/overlap adjusting locks servicing. , 12) crop shear side guide line plate groove welding. , 13) crop shear side guide repositioning during t bar hitting. , 14) any other jobs assigned by oa/ea , c) steckel mill jobs , 1) sm dust removal apron position / welding , 2) sm entry & exit retractable roller table roll cooling pipe checking, damaged pipe changing, both , side vertical apron groove welding, coupling welding. , 3) sm entry/exit side guide cross spray damaged nozzle changing and damaged/uprooted nozzle , block changing/welding. , 4) sm entry/exit cross spray diaphragm valve servicing/changing. , 5) sm entry/exit deflector rolls bearing housing fixation tightening and shim addition. , 6) sm entry/exit flap and bottom plate assembly fixation tightening and elongated bolts changing. 7) sm guide synchronizing shaft fixations checking / changing. , 8) sm main drive shaft cooper bearing fixation tie rod fixation, gulding block bolts tightening , 9) sm pinch roll de-scaler roll to hydraulic cylinder lock checking and welding/changing. , 10) sm pinch roll split apron repositioning & base stool welding. , 11) sm roll cooling flushing by removing all nozzles from zone i & ii & fixing back. , 12) sm wobbler liner plate bolts, wobbler to uj bolts tightening and uj to drive spindle flange bolts , tightening.. , 13) sm work roll

CTN :37969364 Due date: 15 Nov, 202415 Nov, 2024 NA
Tender For bid to ras supply of as per boq - air condition system , two way oil filter wrench , 3 jaw universal oil filter , open spanner set taparia , wall drill bit 8mm

CTN :37998624 Due date: 20 Nov, 202420 Nov, 2024 NA
Tender For corrigendum : supply installation and commissioning of lab. equipment for mechanical engg dept - separating & throttling calorimeter with mini boilerfeatures: determining the vapour content usingo a separating calorimeter with cyclone water separatoro a throttling calorimeter with vapour depressurization using an h-s diagramspecifications:supplied vapour temperature: 240 c pressure: 10barsafety valve: 10barmeasuring ranges temperature: 0 400 c pressure (inlet): 0 16bar pressure (outlet): -150 100mbar230v, 50hz, 1 phase230v, 60hz, 1 phase120v, 60hz, 1 phasedimensions and weight: l x w x h: 800x 800 x 1700 mm weight (approx.): 110 kg, steam turbine power plant setupfeatures steam power plant and its components start-up, operation and shut down of a steam power plant closed steam-water circuit with feed water treatment among others, determining:o boiler efficiencyo mechanical/thermal efficiency of the turbineo condenser efficiencyo specific fuel consumption of the plantspecificationsteam generator steam output: 200kg/h at 11bar fuel consumption: 12l/h heat-up time: 8min pressure: 13barsuper heater power: 7kwsingle-stage axial turbine with curtis wheel and hydraulic speed regulator power: max. 1,5kw at 3000min-1water-cooled condenser cooling capacity: 98kw transfer surface: 2,5m2measuring ranges temperature: 9x 0 400 c, 2x 0 100 c flow rate: 0 167l/min (cooling water) pressure: 3x 0 16bar, 1x 1bar torque: 0 20nm speed: 0 4000min-1400v, 50hz, 3 phases400v, 60hz, 3 phases, 230v, 60hz, 3 phasesdimensions and weight l x w x h: 3500x 2500 x 2250 mmweight (approx.): 2250 kg, rotary air compressor test benchfeatures: to study all components/accessories used in rotary air compressor. to study & determine isentropic work, actual work volumetric efficiency, isentropic efficiency & free air delivery at different delivery pressure. to plot volumetric efficiency/isentropic efficiency against delivery pressure & comment on the nature of the plot.observations can be taken by air compressed in storage& free condition. instrumentation: sensors with digital displays software for data acquisition via usbspecifications: vane compressor rotary compressor, driven by 3 hp motor. calibrated orifice meter with water manometer to measure air intake. energy meter to measure input of the meter. pressure gauge to measure discharge pressure. control valve at delivery side. stop clock.dimensions and weight: l x w x h: 1500x 1500 x 1250 mmweight (approx.): 320kg, marcet boiler test apparatusfeatures: recording the vapour pressure curve of water presentation of the relationship between pressure and temperature in a closed system temperature and pressure measurementspecification:bourdon tube pressure gauge: -1 24bartemperature limiter: 200 csafety valve: 20barheater: 2kwboiler, stainless steel: 2lmeasuring ranges temperature: 0 200 c pressure: 0 20bar230v, 50hz, 1 phase230v, 60hz, 1 phase120v, 60hz, 1 phasedimensions and weight: l x w x h: 800x 600 x 600 mmweight (approx.): 45 kg, rope brake dynamometerpower 0.5 kwvoltage 220 vphase single phasefrequency 50 hzmaterial stainless steelwheel size 45 cm, cam analysis apparatus capacity 7. 5 hpphase 3 phasespeed 1500 rpmfrequency 50 hzmaterial stainless steel 304color blue, slip gauge set steel sets with high wear resistance.47 & nabl calibrationslip gauge set steel sets with high wear resistance. high level accuracy and reliability of measuring results are guaranteed by precise calibration. provided with nabl traceability if required. sets of m46, m87, m112. metric/imperial., bevel protectorblade length 150mm w/60, 40degree edges, required stand and type, sine bar range 200mm for checking concentricity, run out of sharpness taken & degree checking, digital outside micrometerspecification range 0-25mm, digital vernier caliperspecification range 0-150mm/6 , radius gaugeradius gauge 1-7mm, surface plate granite a grade 24 x 36 inch in a class granite, mechanical comparator analog type with dia

Central Government/Public Sector

CTN :38082657 Due date: 18 Nov, 202418 Nov, 2024 64.9 Thousand
Tender For annual maintenance contract for repair and maintenance of air conditioner system fitted in 01 number rel850e drill working at nigahi project, ncl.

CTN :38121124 Due date: 13 Nov, 202413 Nov, 2024 1.99 Lacs
Tender For 8968-72 air condition unit vrf system ahu

State Government

CTN :38151293 Due date: 21 Nov, 202421 Nov, 2024 3.28 Lacs
Tender For comprehensive annual maintenance contract of total 13nos. of split type ac and 2 units duct ac installed at control room, turbine floor and generator hall at lph and chief office, hospital and guest houses located at talakalale and kargal 577421, sagar talluk, shimoga dist,karnataka.the scope of contract shall be to keep the air conditioners in normal working condition. attending to all breakdown and preventive maintenance of acs at lph, talakalale, kargal office,ib & hospital without any delay.the contractor shall supply and install the parts found defective for satisfactory maintenance of acs without any delay during the contract period as per the schedule list of spares. the contractor shall note down the equipment & accessories that are in service in present system.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract.compressors shall be replaced only when the existing compressor is found irreparable.spares to be provided for maintaining continuity of work.the successful service provider has to maintain ready stock of requisite spares in good condition throughout the comprehensive annual maintenance contract period to facilitate immediate replacement of defective parts.preventive maintenance for air conditioners.preventive maintenance shall be provided at least once in 3 months during prime shift hours of coverage at no extra cost. the firm shall monitor the performance of the systems, monitoring and cleaning, topping up of refrigerant gas, greasing of moving and running equipment, cleaning of filters etc., and give a report to the executive engineer(o&m)lph division head, kpc ltd.,breakdown maintenance for air conditioners-the agency should attend to all the breakdown call promptly & immediately.however in extreme case, if the spares not available immediately, repair shall be carried out within 2 weeks. efforts shall be made to rectify the system within 2 weeks. during the contract period the firm shall supply and install all parts found defective for satisfactory maintenance of air conditioners at no extra cost. it is the responsibility of the firm to bring all components to working condition. any leakage of gas in the piping/system shall be attended by the agency. filling up of refrigerant gas is also included in the scope of work. all repairs/rewinding/services related to the air conditioning system, electrical circuits, stabilizers, compressors or motors and all the accessories connected to ac system etc., are covered under comprehensive annual maintenance contract. all the spares and compressors are under the responsibility of the firm during contract period.replacement of defective parts-the firm shall supply and install all parts found defective during the comprehensive annual maintenance contract period in respect of acs at their own cost. original spares and compressors shall be used during contract period. in case of suitable replacement not available for defective components of air condition plant the firm shall undertake to provide a higher version components at no extra cost and the defective parts and components shall be handed over to kpcl.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract. compressors shall be replaced only when the existing compressor is found irreparable.

CTN :38082596 Due date: 13 Nov, 202413 Nov, 2024 NA
Tender For repairing of air condition system of dumper sl. no. d-90021, cil no.11863, and d-90025,cil no. 11864, model bh-100 tonne at kathara colliery.
 Loading, Please wait...

Connect us via What's Up