Tender For corrigendum : providing of repair and overhauling service - repair and overhauling service - repairing of rotary vaccum filter; labline mo160; yes; buyer premises , repair and overhauling service - repairing of verticle tube evaporator; labline hto45; yes; buyer premises , repair and overhauling service - repairing of distillation column; labline mto110; yes; buyer premises , repair and overhauling service - repairing of plate and frame filter press; kce; yes; buyer premises , repair and overhauling service - repairing of multi stage compressor; na; yes; buyer premises , repair and overhauling service - repairing of packed tower for flooding velocity; labline mto115; yes; buyer premises , repair and overhauling service - repairing of shell and tube heat exchanger; labline hto40; yes; buyer premises , repair and overhauling service - repairing of centrifugal pump; vinayak; yes; buyer premises , repair and overhauling service - repairing of water cooler storage capacity 80 l; voltas ltd 4080 pss water cooler; yes; buyer premises , repair and overhauling service - repairing of p and pi controller trainer; labline pi1003 2007112; yes; buyer premises , repair and overhauling service - repairing of pneumatic flow control trainer; labline lpft9248 20080722; yes; buyer premises , repair and overhauling service - repairing of pneumatic level control trainer; labline pl278 200303208; yes; buyer premises , repair and overhauling service - repairing of pneumatic temperature control trainer; labline gd286 2k08371; yes; buyer premises , repair and overhauling service - repairing of pneumatic pressure control trainer; labline gd9821 2k80377; yes; buyer premises , repair and overhauling service - repairing of flow control trainer; labline 2k 743; yes; buyer premises , repair and overhauling service - repairing of flow control trainer; labline pc04 200509119; yes; buyer premises , repair and overhauling service - repairing of temperature control trainer; labline pc07 200509107; yes; buyer premises , repair and overhauling service - repairing of level control trainer; labline pc05 200509114; yes; buyer premises , repair and overhauling service - repairing of level control trainer; labline lm2002 2007239; yes; buyer premises , repair and overhauling service - repairing of pressure control trainer; labline pc08 200509128; yes; buyer premises , repair and overhauling service - repairing of conductivity trainer; tex tex503 201802742; yes; buyer premises , repair and overhauling service - repairing of magnetic flow meter; labline f25 20050525; yes; buyer premises , repair and overhauling service - repairing of air compressor; airmex te15; yes; buyer premises , repair and overhauling service - electronic weighing scale; surplus; yes; buyer premises
Tender For corrigendum : supply of operations and maintenance contract for hpcl 2g ethanol bio refinery at bhatinda - fixed part o m cost for 2g ethanol plant mapower , variable part o m cost for 2g ethanol plant manpower , hiring of 3t forklifts grabbers payloaders lifting equipment on per hour rental basis , dismantling of equipment excluding heavy equipment charges or lifting equipment , 3t forklift grabbers payloaders lifting equipment hiring on rental basis for 24 hrs basis , instn of rotating equipment upto 10 mt pump mixer compressor turbine etc excl heavy equipment charges or lifting equipment , vessels columns drums filters instn upto 10 mt excl heavy eqpmnt or lifting eqpmnt charges , static eqpmt heat exchngrs, coolers, condensrs upto 10 mt excl heavy eqmnt charges lifting eqpmt instn , vessels, columns,drums, filters installation more than 10 mt and upto 20 mt excluding heavy equipment charges ,lifting equipment , static equipment such as heat exchangers coolers condensers etc. installation more than 10 mt and upto 20 mt excluding heavy equipment charges lifting equipment , strip lining ss lining of column, vessel , monel of column, vessel, strip lining , foam cleaning of exterior fin fan cooler foam cleaning of cooler , mobilization charges per visit foam cleaning of exterior fin fan cooler , heat exchanger revisioning testing single unit having upto 150 tubes for pipes , upto 150 tubes for rtj flange , up to 150 tubes for channel box opening box up , for bundle pulling and insertion upto 150 tubes , upto 150 tubes bundle cleaning from inside outside shell cleaning for heat exchanger revisioning and testing , up to 150 tubes for ring test , tubes floating head test single unit having upto 150 , 150 tubes cover test , 150 tubes repeated ring test , individual tube testing 150 tubes , 151 to 300 tubes pipes heat exchanger revisioning and testing , single unit having 151 to 300 tubes rtj flange , 151 to 300 tubes channel box opening box up , bundle pulling and insertion single unit having 151 to 300 tubes , bundle cleaning from inside, outside and shell cleaning for 151 to 300 tubes , heat exchanger revisioning testing single unit having 151 to 300 tubes ring test. , 151 to 300 tubes floating head test. , cover test 151 to 300 tubes , repeated ring test 151 to 300 tubes , individual tube testing 151 to 300 tubes , 301 to 600 tubes for pipes heat exchanger revisioning and testing , rtj flange 301 to 600 tubes , for channel box opening and box up 301 to 600 tubes , bundle pulling and insertion 301 to 600 tubes , bundle cleaning from inside, outside shell cleaning 301 to 600 tubes , 301 to 600 tubes ring test. , floating head test for 301 to 600 tubes , cover test for 301 to 600 tubes , repeated ring test for 301 to 600 tubes , individual tube testing for 301 to 600 tubes , heat exchanger revisioning testing single unit having 601 to 900 tubes for pipes , rtj flange for 601 to 900 tubes , channel box opening box up for 601 to 900 tubes , removal installation fixing of temperature transmitter , removal of temp. gauge temp. switch thermocouple rtd with out thermowell , receiving shifting of thermowell with its accessories fromstore any other place inside refinery transport to work site , installation of i p, p i, e i, f i convertor , removal of i p, p i, e i, f i convertor , installation of air filter regulator , fabrication installation of yoke support , termination of wire size above 2.5 sq. mm and up to 4 sq.mm , termin. of wire size up to 2.5 sq. mm , all work up to plinth level 1 is to 2 is to 4 , work up to plinth level 1 is to 1.5 is to 3 , centering and shuttering , 4 inch gi pipe 100 mm nominal bore dia supply installation of gi pipes , 3 inch gi pipe 80 mm nominal bore dia supply installation of gi pipes , gi pipes 2 .5 inch gi pipe 65 mm nominal bore dia , s i of 2 inch gi pipe 50 mm nominal bore dia , gi pipes 1.5 inch gi pipe 40 mm nominal bore dia supply installation , 1 inch gi pipe 25 mm nominal bore dia supply insta
Tender For supply, installation, commissioning and testing of shell and tube type heat exchanger for 12.5m va areva make transformers located at electric arc furnace (eaf) transformer room. required specification: capacity - 250kw, type - single tube/wall, mounting - horizontal, tube material - cu ni 90 10, other moc - cs of is 2062, design pressure (kg/cm2) shell/tube - 5/5, test pressure (kg/cm2) shell/tube - 7.5/7.5, design te mperature degree celsius shell/tube - 100/100, oil flow - 800 lpm, water flow - 600 lpm of thermo engi neers private limited make or equivalent in all respects. note: - (1) two coat epoxy paint will be applied on outer shell. (2) supplied heat-exchanger should be 1:1 replacement of existing heat-exchanger. so, no modific ation should be required in the existing system for the installation of the supplied heat-exchanger. however, if any minor changes are required in existing foundation and flange fitment during installation it will be under firm's scop e. (3) the drawing attached is for general guidance only. manufacturer/supplier should study the site con ditions before supply for the fitment and efficient working of the product. rwp approved drawing number rwp/m ms/elec./01 attached for reference. 4) all additional parameters which are not mentioned in description or in att ached drawing should be as per is 6088:1988 standards or latest. no. of stage inspection:1 (excluding final lot i nspection). description of stage-1 inspection: as per approved qap (as 100% of po qty.) [ warranty period: 2 4 months after the date of delivery ]
Tender For supply of sitc of laboratory instruments - determination of dynamic viscosity of liquids ,combined venturimeter, orifice meter and pitottube set up , reynolds number apparatus , packed bedreactor , fluidized bed reactor , thermalconductivity of solids , heat transfer through naturalconvection , heat transfer though forcedconvection , parallel flow and counter flow heat exchanger , shell and tube heat exchanger steamto water , estimation of thermal setting velocityto design a thickener , separation of liquids bybatch distillation , extraction mass transferoperation solid liquid extraction , extraction masstransfer operation liquid liquid extraction inpacked bed , rotary dryer drying characteristicsof biomass
Tender For bid to ras supply of common chiller and heat exchanger - chiller 15 tr-45,000 kca per hr , shell and tube heatexchanger-1kw , shell and tube heat exchanger-3kw , shell and tube heat exchanger-5kw , shell and tube heatexchanger-13kw , shell and tube heat exchanger-11kw ,shell and tube heat exchanger-25kw , three way valve
Tender For supply of vapour in air diffusion apparatus , solid in air diffusion apparatus , absorption packed bed , adsorption study in packed bed solid liquid system , liquid liquid extraction in packed bed , determination of viscocity in laminar and turbulant flow , reynolds apparatus , bernoullis theorem verification apparatus , determination of velocity profile using pitot tube , heat transfer through composite walls apparatus , heat transfer from pin fin apparatus , heat transfer through natural convection , shell and tube heat exchanger steam to water