Web Analytics Made Easy - StatCounter

Air Preheater Tube Tenders

Get complete information related to latest Air Preheater Tube Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Preheater Tube Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Preheater Tube Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government And Public Sector

CTN :36194046 Due date: 30 May, 202430 May, 2024 NA
Tender For supply, transportation, loading, unloading, dismantling, fabrication and refitting of air preheater tubes on turnkey basis of 110 tph boiler in cogen plant at sugauli

Central Government/Public Sector

CTN :35872319 Due date: 21 May, 202421 May, 2024 NA
Tender For corrigendum : rate contract for spares of abb make analysers and actuators for ntpcstations - valve manifold ssy,aw630074,abb, maintenance kit,aw630072,abb, valve diaphragm pack,aw630088,abb, filter wheel assy,768618,abb, constant head assy,aw600740,abb, constant head assy,aw501 061,abb, connct tubing,aw501066,abb, entrainmnt piece assy,aw501065,abb, cable assy,aw501081,abb, cal&rgt sol tube kit,aw501076,abb, pt1000 assy,aw501 058,abb, filter assy,aw60049,abb, tube replacement kit,aw601102,abb, cable assy,9437033,abb, constant head assy,aw600700,abb, pump motor assy,aw600047,abb, filter pack,aw600087,abb, extender board,758108 & 769229,abb, sample gas cell unit,768605,abb, input module,7958510,abb, input module,7958511,abb, input module,7958512,abb, replace tubing kit,aw601 100,abb, app board assy,aw600065,abb, conductivity sensor,ac22.1,abb, cond electrode,ac221/211231,abb, cond electrode,ac221/231131,abb, pwr supp brd,aw600051,abb, tubing kit,aw602100,abb, conduct sensor,ac221/231201,abb, conc analyzer,elec unit,tb84tc2000100, elect module,awt540a1a1b1y0y0y0,analyzer, sodium ion elec,aw501030,abb, calibratin cartridge,awrk5000114, reference electrode,aw501035,abb, sensor input board,aw501050,abb, reagent kit,awrk5000111,abb, cal sol btl kit assy,aw501 070,abb, current o/p board,4500 0255,abb,analyzer, pressure switch assy,aw501062,abb, tubing kit,aw501075,abb,analyzer, cation column,se-cc-14,f/swas, tube repl kit,aw601102,abb, power supply board,aw600056,abb, reburshing kit,8241020,abb, solenoid valve,aw600034,abb, reaction blk heater,aw600045,abb, filter assy,aw600049,abb, primary debubbler,aw600025,abb, optical unit,aw60110,abb, flow meter,19916008,abb, feedback card,7959128,abb, spare kit,7959198,abb, pr gauge blk,7959360,abb, pr gauge blk,7959361,abb, input module,7958513,abb, cond sensor,tb270101110052,abb, conduct trans,awt420a1a1c2y0e5,abb, cond cell,ac221/211141/std,abb, dissolved o2 sensor,9435300,abb, connection brd pcb,aw600048,abb, connector set,abb,analyzer, detector,768603,abb, bistable flow sensor,8018475,abb, o-ring cond monitor,651775,abb, display unit,ax400/0295,abb, pre amp circuit board,758003,caldos-17, sec debubbler assy,aw600061,abb, o-ring,211068,abb, pwr supp,3kxg758003u0400,abb, display h2 anal,769149,abb, flame arrestor,19516574,abb, sensor cable,7670004,abb, thermal trip,745836,abb, five way ball valve, 19917027,analyser, analog o/p card,990055,abb, power supply board,ax400/0248,abb, ph input board,ax400/0285,abb, cpu board,4600/0248,abb, p/p spare tube kit,aw601108,abb, sodium electrode,1048-836, reaction block,aw601 112,abb, conductivity sensor , abb, ac21.2, analyzer kit,aw602155,abb,analyzer, cell assy,az200 700,abb,analyzer, probe heater assy,az200-713,abb,analyzer, tc electrode assy,az200 704,abb,analyzer, beam splitter,768602,abb,analyzer,ao2000, ed lamp,746931,abb,analyzer,ao 2000, sensor cpu 2 board,abb,analyzer, peristaltic pump,1p1310,abb,analyzer, temp controller,8328907l,abb, temp controller,01b8360,abb, membrane pump,907016,abb,analyzer, heat exchanger,97k0100,abb,analyzer, condensate monitor,730688,abb,analyzer, heater circuit board,746741,abb, stepper motor,746740,abb,analyzer,ao2000, barr circuit board,746702,abb,analyzer, low level sod. electrode,1048 837,abb, sodium electrode,abb,1048/837, sodium ref electrode,1436-836,abb,8037, sodium ref electrode,1436/837,abb, controller,process,slc 220,abb, reac blk temp sensor,aw600046,abb, ph cell,ap30111020121,abb, concentration analyser sensor, abb, conductivity sensor,tb27.001.1.1.1.0.0c2, cond transmtr,tb82.te.2.1.1.0.3.3.1,abb, multstrem disply brd,8240245,8241, transmitter for do analyser, abb,4641800, flow through,ap302/1001001,abb, heater board assy,1020150,thermo fisher, hotwell condu sensor,2085-405,abb, pre-heater assy,aw601720,abb,analyzer, conductivity sensor,ac21.2/2.4.1.2.5.1, conductivity sensor,ac221/211201,abb, filter element,730682,ceramic,abb, zirconia probe,abb,analyzer,zfg2, o-ring,20650424,abb,analyzer,caldos

State Government

CTN :36133773 Due date: 22 May, 202422 May, 2024 NA
Tender For corrigendum : cleaning of heat exchanger in pulp mill area at tnpl unit - ii, trichy

CTN :35338942 Due date: 13 May, 202413 May, 2024 1.33 Crore
Tender For bid to ras corrigendum : supply of chemical technology lab - ball mill 1 , ball mill 2 , ball mill 3 , ball mill 4 , reynolds apparatus recirculation 1 , reynolds apparatus recirculation 2 , reynolds apparatus recirculation 3 , laboratory refrigerator 1 , laboratory refrigerator 2 , laboratory refrigerator 3 , laboratory refrigerator 4 , dead weight tester 1 , dead weight tester 2 , dead weight tester 3 , high volume dust sampler 1 , high volume dust sampler 2 , high volume dust sampler 3 , redwood viscometer 1 , redwood viscometer 2 , redwood viscometer 3 , redwood viscometer 4 , cod analyzer 1 , cod analyzer 2 , cod analyzer 3 , cod analyzer 4 , laboratory drying oven 1 , laboratory drying oven 2 , laboratory drying oven 3 , laboratory drying oven 4 , muffle furnace 1 , muffle furnace 2 , muffle furnace 3 , muffle furnace 4 , analytical balance 1 , analytical balance 2 , analytical balance 3 , analytical balance 4 , high precision analytical balance 1 , high precision analytical balance 2 , electronic weighing scale 1 , electronic weighing scale 2 , electronic weighing scale 3 , electronic weighing scale 4 , electronic weighing scale 5 , sonicator system bath 1 , sonicator system -bath 2 , ultrasonic probe sonicator 1 , ultrasonic probe sonicator 2 , membrane bioreactor lab scale set up 1 , turbine flow meter 1 , calibration of thermocouple 1 , calibration of thermocouple 2 , calibration of thermocouple 3 , level measurement by capacitance method 1 , level measurement by capacitance method 2 , level measurement by capacitance method 3 , level measurement by capacitance method 4 , water bath 1 , water bath 2 , water bath 3 , water bath 4 , water bath 5 , pelton turbine test rig 1kw 1 , pelton turbine test rig 1kw 2 , uv spectrophotometer split beam 1 , uv spectrophotometer split beam 2 , uv spectrophotometer split beam 3 , uv spectrophotometer split beam 4 , uv spectrophotometer split beam 5 , tray dryer 1 , tray dryer 2 , multipurpose membrane pilot plant 1 , multipurpose membrane pilot plant 2 , orbital incubator shaker 1 , orbital incubator shaker 2 , bod incubator 1 , bod incubator 2 , bod incubator 3 , bod incubator 4 , bod incubator 5 , do meter 1 , do meter 2 , do meter 3 , double distillation unit 1 , double distillation unit 2 , double distillation unit 3 , double distillation unit 4 , simple batch distillation assembly 1 , simple batch distillation assembly 2 , simple batch distillation assembly 3 , simple batch distillation assembly 4 , simple batch distillation assembly 5 , finned tube heat exchanger 1 , finned tube heat exchanger 2 , absorption in packed bed 1 , absorption in packed bed 2 , rotary dryer 1 , rotary dryer 2 , rotary dryer 3 , shell tube heat exchanger water water 1 , shell tube heat exchanger waterwater 2 , shell tube heat exchanger waterwater 3 , reciprocating pump test rig 1 , reciprocating pump test rig 2 , reciprocating pump test rig 3 , plate and frame filter press 1 , plate and frame filter press 2 , hammer mill 1 , hammer mill 2 , cyclone seprator 1 , cyclone seprator 2 , magnetic seprator 1 , magnetic seprator 2 , magnetic seprator 3 , sieve shaker with suitable standard screens 1 , sieve shaker with suitable standard screens 2 , hot plate with pid temp controller 1 , hot plate with pid temp controller 2 , pensky martin flash point appratus 1 , pensky martin flash point appratus 2 , control valve characteristics , belt conveyor 1 , belt conveyor 2 , belt conveyor 3 , losses in pipe fittings appratus 1 , losses in pipe fittings appratus 2 , losses in pipe fittings appratus 3 , aniline point appratus 1

CTN :35846049 Due date: 15 May, 202415 May, 2024 NA
Tender For corrigendum : supply of operations and maintenance contract for hpcl 2g ethanol bio refinery at bhatinda - fixed part o m cost for 2g ethanol plant mapower , variable part o m cost for 2g ethanol plant manpower , hiring of 3t forklifts grabbers payloaders lifting equipment on per hour rental basis , dismantling of equipment excluding heavy equipment charges or lifting equipment , 3t forklift grabbers payloaders lifting equipment hiring on rental basis for 24 hrs basis , instn of rotating equipment upto 10 mt pump mixer compressor turbine etc excl heavy equipment charges or lifting equipment , vessels columns drums filters instn upto 10 mt excl heavy eqpmnt or lifting eqpmnt charges , static eqpmt heat exchngrs, coolers, condensrs upto 10 mt excl heavy eqmnt charges lifting eqpmt instn , vessels, columns,drums, filters installation more than 10 mt and upto 20 mt excluding heavy equipment charges ,lifting equipment , static equipment such as heat exchangers coolers condensers etc. installation more than 10 mt and upto 20 mt excluding heavy equipment charges lifting equipment , strip lining ss lining of column, vessel , monel of column, vessel, strip lining , foam cleaning of exterior fin fan cooler foam cleaning of cooler , mobilization charges per visit foam cleaning of exterior fin fan cooler , heat exchanger revisioning testing single unit having upto 150 tubes for pipes , upto 150 tubes for rtj flange , up to 150 tubes for channel box opening box up , for bundle pulling and insertion upto 150 tubes , upto 150 tubes bundle cleaning from inside outside shell cleaning for heat exchanger revisioning and testing , up to 150 tubes for ring test , tubes floating head test single unit having upto 150 , 150 tubes cover test , 150 tubes repeated ring test , individual tube testing 150 tubes , 151 to 300 tubes pipes heat exchanger revisioning and testing , single unit having 151 to 300 tubes rtj flange , 151 to 300 tubes channel box opening box up , bundle pulling and insertion single unit having 151 to 300 tubes , bundle cleaning from inside, outside and shell cleaning for 151 to 300 tubes , heat exchanger revisioning testing single unit having 151 to 300 tubes ring test. , 151 to 300 tubes floating head test. , cover test 151 to 300 tubes , repeated ring test 151 to 300 tubes , individual tube testing 151 to 300 tubes , 301 to 600 tubes for pipes heat exchanger revisioning and testing , rtj flange 301 to 600 tubes , for channel box opening and box up 301 to 600 tubes , bundle pulling and insertion 301 to 600 tubes , bundle cleaning from inside, outside shell cleaning 301 to 600 tubes , 301 to 600 tubes ring test. , floating head test for 301 to 600 tubes , cover test for 301 to 600 tubes , repeated ring test for 301 to 600 tubes , individual tube testing for 301 to 600 tubes , heat exchanger revisioning testing single unit having 601 to 900 tubes for pipes , rtj flange for 601 to 900 tubes , channel box opening box up for 601 to 900 tubes , removal installation fixing of temperature transmitter , removal of temp. gauge temp. switch thermocouple rtd with out thermowell , receiving shifting of thermowell with its accessories fromstore any other place inside refinery transport to work site , installation of i p, p i, e i, f i convertor , removal of i p, p i, e i, f i convertor , installation of air filter regulator , fabrication installation of yoke support , termination of wire size above 2.5 sq. mm and up to 4 sq.mm , termin. of wire size up to 2.5 sq. mm , all work up to plinth level 1 is to 2 is to 4 , work up to plinth level 1 is to 1.5 is to 3 , centering and shuttering , 4 inch gi pipe 100 mm nominal bore dia supply installation of gi pipes , 3 inch gi pipe 80 mm nominal bore dia supply installation of gi pipes , gi pipes 2 .5 inch gi pipe 65 mm nominal bore dia , s i of 2 inch gi pipe 50 mm nominal bore dia , gi pipes 1.5 inch gi pipe 40 mm nominal bore dia supply installation , 1 inch gi pipe 25 mm nominal bore dia supply insta
 Loading, Please wait...

Connect us via What's Up