Web Analytics Made Easy - StatCounter

Aluminium Alloy Conductor Tenders

Get complete information related to latest Aluminium Alloy Conductor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Aluminium Alloy Conductor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Aluminium Alloy Conductor Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45427475 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment material, design, erection, testing commissioning for sop to pump house constructed at jakhota-i bohal khalsa under hpshiva project w.r.t. horticulture development block dehra in electrical section bharoli under esd 1 - supply part of lt line with aaac 7/3.15 (0.323 km), steel tubular poles 8 mtr. long with base plate, steel tubular poles 9 mtr. long with base plate, muff for steel tubular pole with concrete filling, aaac conductor 7/3.15, 55 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), lt ab cable [size 4x70+1x70+1x16 sq. mm] x 2 cable, pvc (1.1 kv, ai, un-armour 3.5 x 35 sq. mm, single continuous earth wire (g.i wire 8 swg), channel iron (75x40x4.8 mm), length 1.50 mtr + 0.2 mtr}, shackle insulator, d-iron, stay set complete, stay wire, earthing set lt complete in all respect, earth knob, half clamp, full clamp, nuts & bolts off sizes, spiral pvc spacer, aluminium paint, red oxide point, supply part of aug. of 63 kva to 100 kva distribution sub-station, aluminium thimble 120 sq mm, lt cable 3.5 core 120 sq. mm, chain link fencing, angle iron, gate etc. for transformer fencing, 3-ph, 4-wire trivector meter 200/5 a, erection part of lt line, erection charges & transportation charges complete in all respect of lt line, erection part of aug. of 63 kva to 100 kva dtr, erection charges & transportation charges complete in all respect of aug. of 11/0.4 kv, 63 to 100 kva dtr

State Government

CTN :45427476 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment / material , design, erection, testing & commissioning for sop to civil hospital jawalamukhi by providing 11/0.4 kv, 400 kva dtr a/w 11 kv ht line in electrical section amb under esd hpsebl no-i jawalamukhi, ed jawalamukhi. - supply part of 11 kv ht line with aaac 7/3.81 (0.065 km), steel tubular poles 11 mtr. long with base plate, muff for steel tubular pole with concrete filling, aaac conductor 7/3.81, 80 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), single continuous earth wire (g.i wire 8 swg), cross-arm {channel iron (100x50x6 mm), length 1270 mm}, 11 kv pin insulators ( porcelain, 12 kv, 10 kn): 3 no. per pole structure, ai (50x50x6 mm), length 750 mm x2 no., x-bracing set -ms angle iron 50x50x6, length {2125 mmx2 no }, pole top bracket (100x50x6 mm), length 100 mm, ht stay set complete, stay wire, earthing set ht complete in all respect, eye hook for earth wire, barbed wire (rec sp f 3-1981), half clamp, full clamp, danger plate (250x200x1.6 mm), nuts & bolts off sizes, 11 kv g.o. switch, d.o fuse unit, aluminium paint, red oxide point, supply part of 11/0.4 kv 400 kva distribution sub-station, steel tubular poles 9 mtr. long, muffs with concerete filling, x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos], ms angle iron (50x50x6 mm), length: 2800 mm x(1 nos for las), x-arm: [channel iron (75x40x6 mm), length : 2800 mm x 4 nos] for supporting do fuse unit & go switch, x-arm [channel iron (100x50x6 mm), length : 2800 mm x 2 nos for transformer bed, x-arm [channel iron (100x50x6 mm), length : 460 mm x 2 nos for supporting main channel of transformer, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos, ms angle iron 35x35x5 mm), length : 460 mm x 2 nos, ms angle iron 50x50x6 mm), length : 950 mm x 2 nos for bed knee bracing, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos for lt distribution box and go switch assembly, ms angle iron (50x50x6 mm), length : 450 mm x 1 nos for lt distribution box and go switch assembly, go switch handle supporting : [ channel iron (75x40x6 mm), length:460 mm, go ab switch unit (11kv, 400a, 25 ka ) triple pole o/d type, d.o fuse unit, surge arrester, 9 kv station class (porcelain type), discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), stay set complete, stay wire, pipe earthing set, gi wire (6 swg) earth wire, half clamp (m.s. flat 50x6 mm), full clamp ( m.s flat 50x6 mm), nuts and bolts of various sizes (galvanised / coated), aluminium thimble 300 sq mm, copper thimble 95 sq mm, danger plate, barbed wire, lt cable 3.5 core 400 sq. mm, lt cable 3.5 core 70 sq. mm, aluminium paint., red oxide, transformer bed (civil work), chain link fencing, angle iron, gate etc. for transformer fencing, ct pt combined unit, energy meter (3-ph, 4-wire) dlms compliant 1000/5 a ct type for 400 kva dtr, pvc multistrand 2.5 sq mm copper wire, ms angle iron (50x50x6 mm) length 2800 mm x 4 nos., ms angle iron (50x50x6 mm) length 450 mm x 2 nos., erection part of 11 kv ht line, erection charges & transportation charges complete in all respect of 11 kv ht line, erection part of 400 kva dtr, erection charges & transportation charges complete in all respect of 11/0.4 kv, 400 kva dtr

State Government

CTN :45427477 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment / material , design, erection, testing & commissioning for sop to pump house constructed at jakhota (sasan) & dhanot under hpshiva project w.r.t. horticulture development block dehra in electrical section adhwani under esd hpsebl no-ii jawalamukhi, ed jawalamukhi. - supply part of lt line with aaac 7/3.15 (0.070 km) sasan, steel tubular poles 8 mtr. long with base plate, muff for steel tubular pole with concrete filling, aaac conductor 7/3.15, 55 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), pvc (1.1 kv, ai, un-armour 3.5 x 35 sq. mm, single continuous earth wire (g.i wire 8 swg), shackle insulator, d-iron, stay set complete, stay wire, earth knob, nuts & bolts off sizes, aluminium paint, red oxide point, supply part of lt line with aaac 7/3.15 (0.325 km) dhanot, steel tubular poles 8 mtr. long with base plate, muff for steel tubular pole with concrete filling, aaac conductor 7/3.15, 55 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), pvc (1.1 kv, ai, un-armour 3.5 x 35 sq. mm, single continuous earth wire (g.i wire 8 swg), shackle insulator, d-iron, stay set complete, stay wire, earth knob, nuts & bolts off sizes, aluminium paint, red oxide point, supply part of aug. of 63 kva to 100 kva distribution sub-station sasan, aluminium thimble 120 sq mm, lt cable 3.5 core 120 sq. mm, surge arrestor 9 kv station, nuts & bolts off sizes, pipe earthing set, 8 swg gi wire for earthing, 3-ph, 4-wire trivector meter 100/5 a, supply part of aug. of 25 kva to 100 kva distribution sub-station dhanot, aluminium thimble 120 sq mm, lt cable 3.5 core 120 sq. mm, surge arrestor 9 kv station, nuts & bolts off sizes, pipe earthing set, 8 swg gi wire for earthing, 3-ph, 4-wire trivector meter 100/5 a, erection part of lt line sasan, erection charges & transportation charges complete in all respect of lt line, erection part of lt line dhanot, erection charges & transportation charges complete in all respect of lt line, erection part of aug. of 63 kva to 100 kva dtr sasan, erection charges & transportation charges complete in all respect of aug. of 11/0.4 kv, 63 to 100 kva dtr, erection part of aug. of 25 kva to 100 kva dtr dhanot, erection charges & transportation charges complete in all respect of aug. of 11/0.4 kv, 63 to 100 kva dtr

State Government

CTN :45427480 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment/material, design, erection, testing commissioning for sop to jsv by prov. 11/0.4 kv, 25 kva dtr at bohal khalsa a/w 11 kv ht line in electrical section bharoli under esd hpsebl no-i jawalamukhi ed jawalamukhi - supply part of 11 kv ht line with aaac 7/3.81 (0.692 km), steel tubular poles 10 mtr. long, steel tubular poles 9 mtr. long, muff for steel tubular pole with concrete filling, aaac conductor 7/3.81, 80 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), single continuous earth wire (g.i wire 8 swg), cross-arm {channel iron (100x50x6 mm), length 1270 mm}, 11 kv pin insulators ( porcelain, 12 kv, 10 kn): 3 no. per pole structure, ai (50x50x6 mm), length 750 mm, x-bracing set -ms angle iron 50x50x6, length {2125 mmx2 no }, pole top bracket (100x50x6 mm), length 100 mm, ht stay set complete, stay wire, earthing set ht complete in all respect, barbed wire (rec sp f 3-1981), half clamp, full clamp, danger plate (250x200x1.6 mm), nuts & bolts off sizes, discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), safety & maintenance equipment for line maintenance, ci 100x50x5 mm length 2340 mm, belt ai 50x50x6 mm length 1800 mm, aluminium paint, supply part of 11/0.4 kv 25 kva distribution sub-station, steel tubular poles 9 mtr. long, muffs with concerete filling, distribution transformer 11/0.4 kv, 25 kva, x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos], ms angle iron (50x50x6 mm), length: 2800 mm x(1 nos for las), x-arm: [channel iron (75x40x6 mm), length : 2800 mm x 4 nos] for supporting do fuse unit & go switch, x-arm [channel iron (100x50x6 mm), length : 2800 mm x 2 nos for transformer bed, x-arm [channel iron (100x50x6 mm), length : 460 mm x 2 nos for supporting main channel of transformer, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos, ms angle iron 35x35x5 mm), length : 460 mm x 2 nos, ms angle iron 50x50x6 mm), length : 950 mm x 2 nos for bed knee bracing, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos for lt distribution box and go switch assembly, ms angle iron (50x50x6 mm), length : 450 mm x 1 nos for lt distribution box and go switch assembly, go switch handle supporting : [ channel iron (75x40x6 mm), length:460 mm, go ab switch unit (11kv, 400a, 25 ka ) triple pole o/d type, d.o fuse unit, surge arrester, 9 kv station class (porcelain type), discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), stay set complete, stay wire, pipe earthing set, gi wire (6 swg) earth wire, lt distribution panel box for 25 kva dtr, half clamp (m.s. flat 50x6 mm), full clamp ( m.s flat 50x6 mm), nuts and bolts of various sizes (galvanised / coated), aluminium thimble, copper thimble, danger plate, barbed wire, lt cable 3.5 core 70 sq. mm, aluminium paint., red oxide, energy meter (3-ph, 4-wire) dlms compliant 50/5 a ct type for 25 kva dtr, lt switched capacitor 9 kvar for 25 kva dtr, erection part of 11 kv ht line, erection charges & transportation charges complete in all respect of 11 kv ht line, erection part of 25 kva dtr, erection charges & transportation charges complete in all respect of 11/0.4 kv, 25 kva dtr

State Government

CTN :45427482 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment/material, design, erection, testing commissioning for sop to improvement and augmentation of lis bharoli phase-ii 1 no. tube well of 15 hp at village pant in electrical section bharoli under esd hpsebl no-i jawalamukhi. - supply part of 11 kv ht line with aaac 7/3.81 (0.080 km), steel tubular poles 10 mtr. long, muff for steel tubular pole with concrete filling, aaac conductor 7/3.81, 80 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), single continuous earth wire (g.i wire 8 swg), x-arm ci 100x50x6 mm, length 2800 mm x 2 nos for incommer line, x-arm ci 75x40x6 mm, length 2800 mm x 4 nos for supporting do fuse unit & go switch, go switch handle supporting ci 75x40x5 mm, length 460 mm, go ab switch unit (11kv, 400a, 25 ka) tripple pole o/d type, do fuse unit, cross-arm {channel iron (100x50x6 mm), length 1270 mm}, 11 kv pin insulators ( porcelain, 12 kv, 10 kn): 3 no. per pole structure, ai (50x50x6 mm), length 750 mm, x-bracing set -ms angle iron 50x50x6, length {2125 mmx2 no }, pole top bracket (100x50x6 mm), length 100 mm, ht stay set complete, stay wire, earthing set ht complete in all respect, barbed wire (rec sp f 3-1981), half clamp, full clamp, danger plate (250x200x1.6 mm), nuts & bolts off sizes, discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), forntech inverter with 2 battries (ups), ci 100x50x5 mm length 2340 mm, belt ai 50x50x6 mm length 1800 mm, universal optical cable (for mri), aluminium paint, supply part of 11/0.4 kv 25 kva distribution sub-station, steel tubular poles 9 mtr. long, muffs with concerete filling, distribution transformer 11/0.4 kv, 25 kva, x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos], ms angle iron (50x50x6 mm), length: 2800 mm x(1 nos for las), x-arm: [channel iron (75x40x6 mm), length : 2800 mm x 4 nos] for supporting do fuse unit & go switch, x-arm [channel iron (100x50x6 mm), length : 2800 mm x 2 nos for transformer bed, x-arm [channel iron (100x50x6 mm), length : 460 mm x 2 nos for supporting main channel of transformer, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos, ms angle iron 35x35x5 mm), length : 460 mm x 2 nos, ms angle iron 50x50x6 mm), length : 950 mm x 2 nos for bed knee bracing, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos for lt distribution box and go switch assembly, ms angle iron (50x50x6 mm), length : 450 mm x 1 nos for lt distribution box and go switch assembly, go switch handle supporting : [ channel iron (75x40x6 mm), length:460 mm, go ab switch unit (11kv, 400a, 25 ka ) triple pole o/d type, d.o fuse unit, surge arrester, 9 kv station class (porcelain type), discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), stay set complete, stay wire, pipe earthing set, gi wire (6 swg) earth wire, lt distribution panel box for 25 kva dtr, half clamp (m.s. flat 50x6 mm), full clamp ( m.s flat 50x6 mm), nuts and bolts of various sizes (galvanised / coated), aluminium thimble, copper thimble, danger plate, barbed wire, lt cable 3.5 core 70 sq. mm, aluminium paint., red oxide, energy meter (3-ph, 4-wire) dlms compliant 50/5 a ct type for 25 kva dtr, lt switched capacitor 9 kvar for 25 kva dtr, erection part of 11 kv ht line, erection charges & transportation charges complete in all respect of 11 kv ht line, erection part of 25 kva dtr, erection charges & transportation charges complete in all respect of 11/0.4 kv, 25 kva dtr

State Government

CTN :45440261 Due date: 19 Jun, 202619 Jun, 2026 1.12 Crore
Tender For replacement of acsr conductor by 11 kv aaac al-59, 99 sqmm. covered conductor at forest area of nayagaon feeder under edsd, ganeshpur under edd, mohanpur.

State Government

CTN :45440263 Due date: 19 Jun, 202619 Jun, 2026 1.14 Crore
Tender For replacement of acsr conductor by 11 kv aaac al-59, 99 sqmm. covered conductor at forest area of devipur feeder under edsd, ganeshpur under edd, mohanpur.

State Government

CTN :45413511 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For tender for supply of equipment material design erection testing commissioning for sop to ms shyam indus pvt ltd co prittam singh at vill baghni by prov 1104kv 25kva sstn aw 3ph lt line in vill baghni in e section bhadwar under esd hpsebl nurpur. t - 25 kva trsanformer, prov. distribution transformer (ordinary), 11/0.4 kv, 25 kva ., prov. steel tubular poles (9 m, working load > 200 kgf/m ) ., prov. muffs with concerete filling, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for incomer line, prov. ms angle iron (50x50x6 mm), length: (2800 mm) x1 nos for las, prov. x-arm: [channel iron (75x40x6 mm), length : (2800 mm x 4 nos] for supporting do fuse unit & go switch, prov. transformer bed, belting & knee bracing, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for transformer bed, prov. x-arm [channel iron (100x50x6 mm), length : (460 mm) x 2 nos for supporting main channel of transformer], prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (35x35x5 mm), length : (460 ) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (950 mm) x 2 nos for bed knee bracing, prov. transformer lt distribution box and go switch fixing assembly, prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (450 mm) x 1 nos, prov. go switch handle supporting: [channel iron (75x40x6 mm), length : 460 mm, prov. go ab switch unit (11kv, 400a, 25 ka ) tripple pole o/d type, prov. d.o fuse unit, prov. lighting arrester, 9 kv station class (porcelain type), prov. discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), prov. stay set complete, prov. stay wire (7/3.15 mm) (6.0 kg per stay set), prov. pipe earthing set, prov. lt distribution panel box with mccb(160a, 10ka, 4p, 1no) & sfu(32a, 5no, rewirable), prov. half clamp (m.s. flat 50x6 mm), prov. full clamps (m.s. flat 50x6 mm), prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. aluminium thimble, prov. copper thimble 35 amp, prov. danger plate, prov. barbed wire, prov. lt cable (3.5 core) 50 mm , prov. energy meter 3- , 4 wire ct operated static tri-vector meter with box(ct-100a), prov. aluminum paint., prov. 6/1/3.35, 50mm ., prov. construction of foundation of transformer, erection of 25 kva s/stn. i.e. digging of pit for pole & earthing two no. poles & 3 nos. for earth drilling of holes in x-arms, preparation of plateform str. members c.i., a.l. i.e. x-arms & k.b. set, errection of d/p, concreating of rcc muff errection of plateform, errection of x-arms, d.o., l.a., mccb, switch lt box, energy meter, errection of transformer, earthing connection to g.o. switch, transformer l.a. etc., errection of stay set, jumper, pipe earthing 3 nos set, l.t. cable, barbed wire and painting complete in all respect., transportation charges @10490/-, prov. transportation charges & mannual carriage of 25 kva pole mounted distribution s/stn. (line length 0.500km), erection of 3- ph. lt line, prov. aaac (7/3.15 50mm ) { neutral conductor including 1% (sag, jumpering and wastage}, prov. steel tubular poles (8 m, working load > 200 kgf/m )., prov. muffs with concerete filling, prov. shackle insulator with d-iron, prov. lt stay set i/c egg insulator., prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. stay wire, prov. g.i wire no 8swg, erection of 8 mtr. st pole single structure i.e. digging of pit, fixing of insulator, x-arms, k.b. set, top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respect., sagging of conductor i.e. laying, stringing and sagging & binding with insulator (single wire per km)., sagging of g.i i.e. laying, stringing and sagging & binding with insulator (single wire per km)., erection of stay set lt i.e. d

corporations/Associations/Others

CTN :45263412 Due date: 20 Jun, 202620 Jun, 2026 NA
Tender For corrigendum : supply of 4500 sets of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonary work 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure p

corporations/Associations/Others

CTN :45424637 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For auction sale of pp rope scrap,steel wire rope scrap,reinforcement steel scrap,acsr moose conductor,aaac twin conductor
 Loading, Please wait...

Connect us via What's Up