Get complete information related to latest Aluminium Clamp Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Aluminium Clamp Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Aluminium Clamp Tenders.
Tender For corrigendum : empanelment of agencies for supply of laboratory instruments for various water testing laboratories under jal jeevan mission, assam - ion meter with electrode and accessories for fluoridemeter: ph/ise benchtop meter with electrode stable, universal power adapter, literature, pc cable, meter test certificate electrode: ionplus fluoride and nitrate combination ion selective electrode, 1m cable, waterproof bnc benchtop ion meter (ise) along with fluoride, nitrate #electrode range: -2.000 to 20.000 resolution 0.1, 0.01, 0.001 relative accuracy 0.002 calibration points up to 5 calibration editing yes #mv/ rmv orp range 2500.0 mv resolution 0.1 relative accuracy 0.2 mv or 0.05 % of reading whichever is greater eh orp mode yes ise range 0 to 19999 resolution up to 3 significant digits relative accuracy 0.2 mv or 0.05 % of reading whichever is greater units ppm, m, mg/l, %, ppb, none calibration points up to 5 calibration editing yes calibration features timed end point, linear point to point, non-linear selectable auto-blank, low concentration range stability #temperature range -5 to 105 c, 23 to 221 f resolution 0.1 relative accuracy 0.1 offset calibration 1-point datalogging memory 2000 with time and date stamp log function manual, ready (include auto-read ), timed log edit delete individual points, group of points or all inputs ph electrode bnc, reference pin atc probe 8-pin mini-din #output rs232, usb power ac adapter included universal, 100-240 vac battery power optional 4 aas battery life 800 hrs, fluoride electrode of ion metersame make that of the ion meter, manifold filtration assembly* wide range of pumps and filtration flasks * high quality components * easily exchangeable elements *maintenance-free * low noise * added filters for enhanced pump longevity * filtration base with silicon stopper, cap & aluminiumclamp connecting silicon tube technical specification for filtration flask set # high-pressure resistant tube # fiberglass filter membranes (47mm / 0.1 m) # ptfe disc filter #normal liquid filtration * specification for filtration glass set #suction bottle capacity(ml) 1000 ml # filter diameter(mm) 47/50 mm # * specification for filter flask * material: statinless steel 304, capacity: 300 ml (100 ml each) [ unit should consist of 3 flask so that 3 sample can be filtered simultanelously without any issue] # effective filtration area(cm2) = 9.6 cm2, outlet connector(mm) = 8 mm * specification for vaccum flask: #flow rate of the pump(l/min) = 17 l/minultimate vacuum(mbar) = 150 mbar # oil free, maintainance free, built in thermal protection to shut off when over heated., auto cut heater for distill water plant so that when water level decreases the heater is switch off automatically, voltage stabilizer capacity- 3 kva servo stabilizer 5 star rating, heating mantle (single station) should have digital energy regulator with multiple step power regulation automatic spill detection and saftey shutdown in built precision temperature control technial specification: flask capacity 250 ml, working temp range: ambiant + 5 to 420 degree celcius. accuracy: plus minus 1.0 degree celcius, power consumption : 150 w, heating mantle (combined unit) material of construction heating block: made with grade epoxy painted chemical resistant coating, aluminum block with 6 thermo wells for processing 6 different samples at a time. #racks: ss 316 # glassware: teflon coated # temperature range ambient + 10 deg c to 450 deg c # stability of temperature better than 0.5 deg c # controller consist of digital read out of temperature and time with 4 programmable ramps for each method. # number of programmable methods 20 numbers. # heating powers 1000w # heating position minimum 6 position # digestion time range -1 to 999 minutes # the system should have facility of acoustic signal at the end of completion of cycle to notify the operator. # the thermal digestion unit should have high thermal homogeneity # the setup should have small f
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu