Tender For creation of pas and visitor room in director cabin and extension of partition of training hall at 3b wing administrative building juhudanda santacruz w mumbai
Tender For corrigendum : supply of storage rack for sheet metal (4 equal vertical partitions) depth - 1000 mm, length - 2500 mm, heigh , storage rack for steel rods and pipes (5 equal horizontal partitions & 1 equal vertical partition) , storage rack for forgings (4 equal horizontal partitions) depth - 1000 mm, length - 1000 mm, height , storage rack (piegeon box type) for finished parts (6 horizontal x 12 vertical boxes) depth - 300 mm , storage rack for finished parts. (4 equal horizontal partions) depth - 600 mm, length - 1000 mm, hei , steel cabinet for filing as per specification 4-layer (1320 h x 620 d x 470 w) in mm
Tender For supply of sample d d - instln of modular overhead partition and pvc laminate with 600 600 9 mm inclusive of complete fitting fixing and commissioning works , instln of acoustic soundproofing wall panels 12 mm inclusive of complete fitting fixing and commissioning works , instln of 300 1200 mm panel light fixtures inclusive of complete fitting fixing and commissioning works , instln of full span indoor carpeting inclusive of complete fitting fixing and commissioning works , instln of integrated glass door with ordnance crest embossed and inbuilt safety inclusive of complete fitting fixing and commissioning works , instln of integrated industrial evaporative duct air coolers with 30 to 40 l tank capacity inclusive of complete fitting fixing and commissioning works , instln of aoc historical information signage using backlit acrylic boards with led focus lighting inclusive of complete fitting fixing and commissioning works , instln of backer board made of durable and water resistant material inclusive of complete fitting fixing and commissioning works , solid wooden partition ) /bid number : gem/2026/b/7477729 * /dated: 01-05-2026 & & / bid document 1 / 13
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of