Web Analytics Made Easy - StatCounter

Anvil Scrap Tenders

Get complete information related to latest Anvil Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Anvil Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Anvil Scrap Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43719341 Due date: 27 Feb, 202627 Feb, 2026 NA
Tender For corrigendum : annual rate contract for procurement of 22 kw electric motor driven 250 scmh capacity hydraulic booster compressors for pune, nashik, sindhudurg, ramanagara, nanded and nizamabad gas of mngl. - supply, installation & commissioning, design, engineering, manufacturing, supply including packaging and forwarding, insurance, custom clearance, handling and unloading at port as well as mngl s site/store of skid mounted 22 kw electric motor driven 250 scmh hydraulic cng booster compressor package, freight, loading-unloading charges of hydraulic booster compressor & auxiliaries for any of the following locations:pune ga, nashik ga, sindhudurg ga, ramanagara ga, nanded ga, (buldhana-parbhani-nanded) & nizamabad ga (nizamabad-adilabad-nirmal-macherial-kumuram bheem asifabad-kamareddy districts), special tools & tackles., design, engineering, manufacturing, supply (including packaging and forwarding, insurance, custom clearance, handling and unloading at port as well as mngl s store/site) of 1.5 kw electric motor driven air compressors with dryer and receiver. (for locations mentioned in sr. no. 1.01), installation, commissioning & field performance test of compressor package at site., site activity, lump-sum annual repair & maintenance charges during warranty period of 1 (one) year inclusive of all consumable, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for second year i.e. after first year of warranty period, inclusive of all consumables, manpower, spares, lubricants but excluding electric power charges., lump-sum annual repair & maintenance charges for third year i.e. after first year of warranty period and second year amc, inclusive of all consumables, manpower, spares, lubricants but excluding electric power charges., lump-sum annual repair & maintenance charges for fourth year i.e. after first year of warranty period, second & third year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for fifth year i.e. after first year of warranty period, second, third & fourth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for sixth year i.e. after first year of warranty period, second, third, fourth & fifth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for seventh year i.e. after first year of warranty period, second, third, fourth, fifth & sixth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for eighth year i.e. after first year of warranty period, second, third, fourth, fifth, sixth & seventh year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for ninth year i.e. after first year of warranty period, second, third, fourth, fifth, sixth, seventh & eighth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for tenth year i.e. after first year of warranty period, second, third, fourth, fifth, sixth, seventh, eighth & ninth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges.

Central Government/Public Sector

CTN :43991402 Due date: 25 Feb, 202625 Feb, 2026 23.45 Lacs
Tender For routine upkeeping/ handling of store materials as per instruction of eic including tools and tackles (excluding sunday/ holidays) and some repair works at central store for 02 (two) years.

Central Government/Public Sector

CTN :43480690 Due date: 20 Feb, 202620 Feb, 2026 NA
Tender For corrigendum : package name: compressed air system as per technical specification no- pe-ts-510/ 527/ 528/ 529/ 530-555-a001 rev 0 - compressed air system as per technical specification no- pe-ts-510/ 527/ 528/ 529/ 530-555-a001 rev 0, total lump sum firm price inclusive of all prevailing taxes, duties and other levies for supply part, services part, mandatory spares, engineering charges and amc comprising of design (i.e. preparation and submission of drawing /documents including as built drawings and o&m manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendors & sub-vendor s works, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables, mandatory spares along with spares for erection (as required), start-up spares and commissioning spares (as required), operational spares (as specified), forwarding, proper packing, shipment and delivery at site, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, final painting at site, minor civil work, trial run at site, carrying out performance guarantee tests at site, training of bhel & customer o&m staff at project site and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per bhel nit & tender technical specification as specified for following projects, amendments & agreements till placement of order.1. 2x660 mw dvc raghunathpur (break-up as per annexure-i).2. 2x660 mw cpgcl korba west (break-up as per annexure-ii)3. 1x800 mw gsecl ukai (break-up as per annexure-iii)4. 2x660 mw mahagenco koradi (break-up as per annexure-iv), total lump sum firm price inclusive of all prevailing taxes, duties and other levies for supply part, services part, mandatory spares, engineering charges and amc comprising of design (i.e. preparation and submission of drawing /documents including as built drawings and o&m manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendors & sub-vendor s works, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables, mandatory spares along with spares for erection (as required), start-up spares and commissioning spares (as required), operational spares (as specified), forwarding, proper packing, shipment and delivery at site, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, final painting at site, minor civil work, trial run at site, carrying out performance guarantee tests at site, training of bhel & customer o&m staff at project site and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per bhel nit & tender technical specification for group ii project, amendments & agreements till placement of order. (break-up as per annexure v)
 Loading, Please wait...

Connect us via What's Up