Get complete information related to latest Architrave Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Architrave Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Architrave Tenders.
Tender For box culvert structural design over natural drain d d = excavation for foundation in earth, soils of all types, sand, gravel, soft murum , providing and laying in situ ready mix controlled grade of m 15 , providing and laying in situ ready mix controlled grade of m20 , providing and laying in situ ready mix m 30 , providing and laying in situ ready mix m 30 cement , providing and laying in situ ready mix m 30 controlled cement concrete , providing and laying in situ ready mix m 30 plain cement concrete , providing, cutting, bending, hooking, tying and laying in position tmt fe 500 , providing reinforced cement concrete crash barrier , providing and applying synthetic enamel paint to crash barrier , providing and laying of filter media with granular materials stone crushed aggregates , providing and laying weep holes of 100 mm dia , providing and laying in-situ m40 grade unreinforced plain cement , providing expansion joints with 25mm thick bituminous pad as per detailed drawings etc. complete. , providing and laying filter material underneath pitching in slopes as per drawings and technical specifications etc. complete. , providing and laying pitching on slopes laid over prepared filter media , plain cement concrete 1 is to 3 is to 6 nominal mix in grouting appron , providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40kilogrameach complete as per drawings , back filling behind abutment, wing wall and return wall
Tender For supply of material for constuction of cc road in uluru village taluru gp at siriguppa talaku package 01 - crushed stone course aggregate 53 tqzur01ur01, granite metal 40 mm tqzur01, granite metal 20 mm tqzur01, gravel 2.36 mm bar murrum tqzur01, vibratory roller 8 tonne tqzur01, water tanker tqzur01, form work at 1 percent tqzur01, portland cement tqzur01, coarse sand zone iii tqzur01, broken stone aggregate 40 mm size tqzur01, broken granite metal 20 mm tqzur01, broken granite metal 10 mm tqzur01, polythene sheet 125 mm micron tqzur01, bitumen primer at 200 ml per joint for 23 joints tqzur01, bituminous sealant 800 ml per joint 23 joints tqzur01, de-bonding strips 3.75 m length into 10 mm width into 5mm thick cut out of rubber filler board or similar material including 5 percent wastage tqzur01, plasticizer bar super plasticizer tqzur01, joint filler board 20mm thick as per is 1838 4 into 3.75 into 0.200 3 sqm tqzur01, concrete mixer 0.4 bar 0.28 cum capacity tqzur01, needle vibrator tqzur01, screed vibrator tqzur01, plate vibrator tqzur01, concrete jiont cutting machine for initial and final cuts tqzur01, water tanker 6 kl capacity tqzur01, air compressor 1 hour initial add 1 hour final tqzur01, name board tqzur01
Tender For supply of material for execution of civil work to grama panchayath koluru - display board / cib koluru gp, water tanker koluru gp, vibratory roller 8 tonne koluru gp, mr9502-water koluru gp, tractor - 40 hp koluru gp, krgpov-supply of crushed stone aggregate 53mm, krgpov-supply of granite metal 20 mm, krgpov-supply of granite metal 40 mm, krgpov-supply of gravel or murrum
Tender For corrigendum : supply of digital radiography system type c (qty:10) - digital radiography system 50kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the
Tender For corrigendum : supply of digital radiography system type b (qty:10) - digital radiography system 80kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the