Web Analytics Made Easy - StatCounter

Argon Welding Torch Tenders

Get complete information related to latest Argon Welding Torch Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Argon Welding Torch Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Argon Welding Torch Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

corporations/Associations/Others

CTN :36108280 Due date: 22 May, 202422 May, 2024 11.97 Lacs
Tender For corrigendum : providing of repair and overhauling service - as per scope of work; asper scope of work; no; buyer premises - 1) rmthblr5738 sealing pulverized fuel leaks in mill housing/mill door/intermediate part of mill (0 ml to below classifier level)- 1. identifying the leaks when the mill is in service. water washing the area after stoppage of the mill. moving the gas cutting set, welding machine, welding cables to the location. moving necessary wooden planks, scaffolding pipes etc to the location and providing necessary platform for carrying out the work. 2. assessing the extent of damage/thinning/erosion of the plates in the neighborhood. finding out the size of the patch plate required in the eroded area. the minimum size of the patch plate shall be 300 x 300 mm (depending upon the location of puncture). marking and cutting patch plate of required size from 16/20 mm plate at fabrication yard. making the edge preparation by cutting and grinding. providing necessary lifting hooks by welding. removing the already welded clit pieces if any in the leaking area. 3. transporting the pre fabricated plate to required location. lifting by using rope/chain pulleys/ pull lifts, setting and full welding to arrest any possible leakage of pulverized fuel. 4. providing necessary packing ropes in inspection doors, mill door joints and ld2 sleeve area and tightening the bolts. prepare the hard setting compound by mixing the hard-setting powder with sodium silicate solution and applying the same in the above mentioned areas and any other fuel puffing areas and giving necessary curing time. 5. clearing the scrap/debris after the work. removing the scaffoldings after trial run and completion of any pending defects and leakages found during trial run. 2) rmthblr5739 sealing pulverized fuel leaks in classifier (including by pass plates)/below 15 ml (above classifier level to 15 ml). 1. identifying the leaks when the mill is in service. water washing the area after stoppage of the mill. moving the gas cutting set, welding machine, welding cables to the location. moving necessary wooden planks, scaffolding pipes etc to the location and providing necessary platform for carrying out the work. 2. assessing the extent of damage/thinning/erosion of the plates in the neighborhood. finding out the size of the patch plate required in the eroded area. the minimum size of the patch plate shall be 300 x 300 mm (depending upon the location of puncture). marking and cutting patch plate of required size from 16/20 mm plate at fabrication yard. making the edge preparation by cutting and grinding. providing necessary lifting hooks by welding. removing the already welded clit pieces if any in the leaking area. 3. transporting the pre fabricated plate to required location. lifting by using rope/chain pulleys/ pull lifts, setting and full welding to arrest any possible leakage of pulverized fuel. 4. prepare the hard setting compound by mixing the hard-setting powder with sodium silicate solution and applying the same in the above mentioned areas and any other fuel puffing areas and giving necessary curing time. 5. clearing the scrap/debris after the work. removing the scaffoldings after trial run and completion of any pending defects and leakages found during trial run. 3) rmthblr5740 sealing pulverized fuel leaks in main p.f duct above 15 ml upto 27 ml including 1st,2nd,3rd & 4th limb of pf duct. 1. identifying the leaks when the mill is in service. water washing the pf duct area after stoppage of the mill. moving the gas cutting set, welding machine, welding cables to the location. moving necessary wooden planks, scaffolding pipes etc to the location and providing necessary platform for carrying out the work. 2. assessing the extent of damage/thinning/erosion of the plates in the neighborhood. finding out the size of the patch plate required in the eroded area. the minimum size of the patch plate shall be 300 x 300 mm (depending upon the location of punctur

corporations/Associations/Others

CTN :36092303 Due date: 14 May, 202414 May, 2024 NA
Tender For providing of custom bid for services - custom bid for services - short term contract for relocation of high pressure drain valves from 0 ml elevation to 6 ml elevation in tps ii expn- 1.0 cutting and removing valves from the drain header at 0ml elevation. 2.0 the balance cut portion in the drain line where the valve was cut and removed to be welded with appropriate spool piece by ibr welder. 3.0 the drain lines coming from different locations to be re-routed to a common location at 6ml to make a valve station. 4.0 all valves removed from 0ml to be welded at the valve station at 6ml. 5.0 the gland packing of valves if required should be replaced by the contractor, the required gland packing will be provided by nlcil. 6.0 the vendor shall quote rates for re-locating each size of valve individually. 7.0 to facilitate a valve station at 6m drain lines would require re-routing. for re-routing nlcil will provide the required tubes. the bends required for re-routing should be fabricated by the vendor. the vendor may take the tubes for bending to his own facility for bending after submitting indemnity bond for value equal to that of the material. 8.0 for re-routing amount will be paid for per joint welded and per bend fabricated and used, nothing extra shall be paid. 9.0 for estimation it may be assumed that each line would require 10 joints (for replacing valves and re-routing line) and 3 bends. however payment will be made for only the executed quantities. 10.0 the path of re-routing will be decided by nlcil. 11.0 after the work is competed hydro-test will be conducted at design pressure ( for sh 203 ksc and for rh 52 ksc) and if any defects observed in work should be corrected by the vendor free of cost. 12.0 100% radiographic testing (except socket weld joints) should be carried out on all ibr joints (including repair/re-welds), the rate for welding should be inclusive of radiographic testing and nothing extra will be paid for radiographic testing. 13.0 the results of the radiographic testing will be checked by nlcil engineers and if any defects are found the re-welding should be carried out at free of cost. 14.0 all material required for work will be handed over to the vendor at nlcil stores only, the transportation of these material from stores to the work site is in the contractors scope. 15.0 removal of all scrap formed as a result of the work. 16.0 scope of the contractor regarding materials. 16.1 the following are in the scope of the contractor regarding the materials required to carry out the work. 16.2 all the tools and tackles required, namely winches, welding machines, cutting set, hoses, welding accessories, air hoses, pipe cutting machines ,grinding machines, 16.3 mother oven, normal oven, flask, slings, chain & pulley blocks, d-shackles, wire ropes, temporary supports, wooden planks, temporary platform grills, scaffolding pipe, clamps, fasteners & materials, blow torch, edge preparation machine, exhaust fans (for evacuation of welding fumes) and any other items required for the work 16.4 consumables such as gas cylinders (pure argon(99.999%), acetylene, lpg ,oxygen etc,),tungsten electrodes ,purging paper and others consumables (cotton waste, emery sheets, paint markers, thermo chalk, buffing wheels, die penetrant kits, kerosene, grinding wheels, cutting wheels, hacksaw blades ,etc.) required for the works. 16.5 personal protection equipment (ppes) such as safety shoes, nose mask, helmet, hand gloves, goggles, safety belts, ladders, crawling boards, safety net, full body safety belt, and any other material required to ensure the safety. 16.6 arrangement of electrical supply distribution for their electrical utilities along with necessary electrical distribution panels, cables, protection, safety relays, earthing etc. 16.7 arrangement for lighting at the work spot along with lighting equipment such as power cable, transformers, hand lamps 24 volt of sufficient quantity. 16.8 the contractor should furnish proper
 Loading, Please wait...

Connect us via What's Up