Tender For corrigendum : supply of procurement of high temperature low sag htls conductor : : -htls conductor as per technical specifications , supervision charges for stringing works related to htls conductor , suspension clamp suitable for suspension pilot insulator string for htls conductor of 765kv tl , dead end clamp suitable for tension insulator string for htls conductor of 765kv tl , repair sleeve for htls conductor of 765kv tl , mid span compression joint mscj for htls conductor of 765kv tl , spacer damper for twin htls conductor of 765kv tl , rigid spacer for twin htls conductor of 765kv tl , connector hexa acsr zebra to twin htls conductor
Tender For re-stringing of 3nos (acsr - moose) power conductor on the existing lines (for correction) in 220kv vtps-narasaraopet line from loc.no: 83-92 (3.070 ckm) - while 2nd circuit (i.e 220kv vtps-podili line) is under live condition
Tender For corrigendum : the work of shifting of line full deposite scheem at various place under edd-sadabad hathras. - safe carriage of following material from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, t&p, etc. which required for proper completion of work.(distance 00-50 kms.), 8.5/9 mtr. long pcc poles., 9/11 mtr. s.t. poles, acsr weasel conductor, earthing complete, shackle insulator, stay set complete, teoff channel, 33/11 kv pin insulator with pin, disc insulator with disc fitting, f bracket, 11 kv x-arm, 50/95/120 sqmm. ab cable, suspension clamp, dead end clamp, distribution box with clamp, pearcing connector, guarding angle with clamp, g.i wire 6/8/10 swg, neutral cum earth wire, cable jointing kit, 11 kv xlpe cable, 25 kva t/f, 63 kva t/f, 100 kva t/f, errection of following poles including cutting of kharanja/mettalic road/concrete portion while digging pit & complete h.t./l.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work., pcc poles 8.5/9 mtr., stp 9.0/11 mtr., errection and grouting of stays as per respo norms and as per direction of supervising engineer. grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost., fixing of earthing rod as per respo norms and as per direction of supervising engineer., safe installation of following new/repaired cousted t/f on newly constructed double pole in proper alignment direction & making all ht/lt connection., 25 kva t/f, 63 kva t/f, 100 kva t/f, laying, sagging and stringing and jumpering / binding etc. of new & old acsr weasal conductor / gi in 11 kv / lt lines as per respo manual and as per direction of supervising engineer., acsr weasal conductor, 50/95/120 sqmm. ab cable, xlpe cable, providing & fixing of following clamps, 11 kv x arms clamps for stp/pcc pole, nut,bolt & washer, 11 kv f clamp for stp/pcc pole, earthwire clamps, lt clamp with nut & bolt, cable jointing kit, cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer, guarding/reguarding of 11 kv line by laying, stringing, sagging and binding of 2 nos. parallel gi wire 6 swg after providing, fabrication and fixing of guarding angle and fabrication and fixing of x-guards (tillis) of gi wire at distance of 3 mtr., installation of extra t on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, t&p etc, required for proper completion of work. the "t" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material., dismentlling and removal of existing line from the various area, dismentlling of pole stp/pcc, back cartage, acsr weasel conductor scrap, iron scrap
Tender For corrigendum : work of erection, testing & commissioning of 66kv d/c panther tower link line from 66kv shetrunjidam s/s to 66kv kadamgiri s/s with s/c stringing of acsr panther conductor having approx. length of 17.00 rkm approved under r&m scheme (tal.palitana, dist.:bhavnagar).
Tender For corrigendum : work of erection of 66kv s/c line on d/c towers from prop. 220kv mandan (mota asarana) s/s to exi. 66kv mota khuntavada s/s with stringing of al-59 conductor (equivalent weight of acsr panther conductor) having approx. length of 10.10 rkm approved under kisan suryodaya yojana phase-ii.
Tender For check survey, design, fabrication, galvanisation and supply of tower material and it’s accessories, acsr “panther” conductor, opgw along with its hardware fittings, polymer insulators etc., transportation, insurance, handling of all the material, stubbing, tower erection, earthing, stringing & sagging of conductor and opgw, testing and commissioning of 132kv d/c transmission line on d/c towers by shifting of tower no. t-139 of 132kv d/c kangoo – bijni – larji – bajoura transmission line near rains nallah (hanogi) under es division, hpsebl, bilaspur on turn key basis against tender specification no. ssd-580/2025
Tender For earthwork excavation, stub setting, concreting, erection, stringing of panther conductor and opgw (4.805km) for erection of 110 kv dc line on dc tower by making lilo of the existing pudukkottai - eid parry- alangudy 110 kv feeder to the proposed vamban 110/22 kv ss with supply of all materials.
Tender For supply of 4500nos of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonary work 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure pole [excluding c
Tender For corrigendum : construction of pile type open raft type tower foundations and supply, erection of tower material and supply, laying and stringing of 0.4acsr conductor with hardware fittings at various locations of 220 kv dc alusteng-mirbazar transmission line
Tender For corrigendum : construction of 1 no. normal raft type tower foundation and supply, erection of tower material and supply, laying and stringing of 0.2acsr conductor with hardware fittings at igc lassipora of 132 kv d/c lassipora-shopian transmission line