Tender For corrigendum : ktps-vii stage - civil - o and m-i - sd-ii - rectification of damaged guniting on track hopper surface of segment 2 in coal handling plant (chp) area of ktps-vii stage, paloncha, bhadradri kothagudem dist.
Tender For tggenco 5x800mw ytps tggenco ytps (5x800mw) engaging of 01 no. shovel 75 hp for clearing of grid jams at track hopper-2 for facilitating further unloading of coal rakes on round the clock basis for arranging uninterrupted coal feeding to the units of ytps for period of 3 months from 06.12.2025 or actual date of utilization.
Tender For providing of custom bid for services - 200138011 balance painting work of track hopper, stacker cum re-claimer and conveyor galleries & structures of chp of st-i (3x200mw) & st-ii (3x500 mw) at ntpc korba, on risk and cost of vendor m/s kinsfolk infrastructure de..
Tender For morvani depot:- manufacturing, supply and stacking of 50 mm size machine crushed track ballast at depot and loading the same into hopper. (1,96,268.00 cum).
Tender For annual maintenance service contract for weighing equipments at wagon tippler and track hopper of m/s avery india pvt ltd., make for the year 2026 in chp at ktps-v and vi stages
Tender For construction of pavement with paver units extending from the coal sampling room to the railway crossing, running parallel to the track hopper under dpps/dpl.job no. 957/dpps.
Tender For corrigendum : work contract for repair & fabrication of g.i. duct of air ventilation system of track hopper & erh area at chp, abvtps, cspgcl, janjgir-champa
Tender For at senchoa-depot supplying of 50mm size hard durable stone machine crushed track ballast as per rdso new specification with upto date correction slip from private quarry, stacking properly on level surface within the depot including loading into hopper/wagon/truck for the work- through sleeper renewal (tsr) at km 20/9-22/1 (1.2km) dn, 26/3-28/0 (1.7km) dn, 31/5-36/3 (4.8km) dn, 37/8-50/2 (12.4km), 50/9-55/3 (4.4km) dn, 55/4-56/7 (1.3km) dn, 56/7-59/8 (3.1km) dn, 62/6-66/6 (4km) dn, 78/4-83/1 (4.7km) dn, 6/9-93/1 (6.2km) dn, 94/5-100/3 (5.8km), 22/0-23/2 (1.2km) up, 28/1-28/9 (0.8km) up, 30/6-31/4 (0.8km) up (total=52.4km) with wider psc sleepers in ghy-cpk section and through sleeper renewal (tsr) at km 102/0-102/7 (0.7km) dn, 103/0-109/9 (6.9km) dn, 110/6-128/6 (18km) dn, 131/0-136/7 (5.7km), 140/6-145/2 (4.6km) dn, 147/1-152/5 (5.4km) dn, 154/2-159/8 (5.6km) dn, 62/6-66/6 (4km) dn, 161/6-165/3 (3.7km) dn, 167/0-170/0 (3km) dn, 171/0-173/6 (2.6km) dn, 184/6-185/8 (1.2km) dn, 137/4-138/7 (1.3km) up (total=58.7km) with wider psc sleepers in cpk-lmg section under the jurisdiction of sr.den/i/lmg.