Web Analytics Made Easy - StatCounter

Bagasse Baling Machine Tenders

Get complete information related to latest Bagasse Baling Machine Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Bagasse Baling Machine Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Bagasse Baling Machine Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :41917846 Due date: 10 Dec, 202510 Dec, 2025 NA
Tender For corrigendum : expression of interest (eoi) for selection of suitable business partner for machine shop including finishing shop

CTN :42620789 Due date: 04 Dec, 202504 Dec, 2025 NA
Tender For corrigendum : construction of equipment room at nrl rt - civil, structural & architectural, earth work in excavation (refer specification no. c-spc-103), earth work in excavation below ground level for all kinds of works in all types of soils except soft rock and hard rock as classified in specification for a depth upto 1.5m including removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, levelling, grading and ramming of bottoms, dewatering of accumulated water from any source and keeping the surface dry for subsequent works and disposal or stacking of excavated material within a lead of 100m, as directed including providing temporary supports to existing service lines like water pipes, sewage pipes, electric overhead and underground cables etc. all complete, but excluding shoring and strutting., for depth beyond 1.5m and upto & inclusive of 3.0m., earthwork in filling by excavating the earth from borrow areas arranged by contractor for all leads, transporting the earth from borrow area including cleaning & stripping the earth at borrow areas, breaking clods, loading, unloading and laying at all depths and heights in layers of thickness not exceeding 15 cms., watering, rolling and ramming by manual methods/mechanical compactors to achieve 90% of the maximum laboratory dry density, dressing, trimming, levelling the top surface etc. in foundations, plinths, trenches etc. all complete., backfilling after execution of the work to proper grade and level with selected materials from available excavated soil from spoil heaps, including re-excavating the deposited soil excavated earlier, breaking clods, laying at all depths and heights in layers of thickness not exceeding 15 cms. watering, rolling and ramming by manual methods/ mechanical compactors to achieve 90% laboratory maximum dry density, dressing, trimming etc. in foundations, plinths, trenches, pits etc. all complete., transporting and disposing the surplus earth and debris including shrubs and vegetations from construction area to areas anywhere outside the plant boundary including re-excavating the deposited soil excavated earlier, transportation, loading, unloading, laying at all depths and heights, stacking, levelling and dressing both the area (viz. from where the earth is transported and where it is deposited) to required levels and slopes complete with all lifts as directed. for carting on the basis of truck measurements (volume of truck reduced by 30% for voids) disposal area s outside plant boundary to be arranged by the contractor .royalty as applicable for disposal outside plant limits to be borne by the contractor., plain & reinforced cement concrete (refer specification no. c-spc-104), providing and laying plain cement concrete for all depths below and upto plinth level in foundations,drains, fillings, non-suspended floors, pavements & ramps or any other works etc. including shuttering, tamping, ramming, vibrating, curing etc. all as specified in any shape, position, thickness and finishing the top surface rough or smooth as specified and directed all complete for concrete of nominal mix 1:5:10 by mass (1 cement: 5 coarse sand: 10 crushed stone aggregates/gravels) with 40mm and down size graded crushed stone aggaregates/gravels.(all materials including cement supplied by contractor at their cost), providing and laying reinforced cement concrete of m-30 grade with 20mm and down size graded crushed stone aggregates/gravel in sub-structure of all types e.g. foundations, footings, raft, beams, slabs, pile caps, retaining walls, jambs, counterforts, buttresses, trenches, manholes,pipe encasement, catchpits, drains, rcc pits, equipment/machine foundations, pedestals, pipe sleepers, columns, plinth beams, suspended floors, beams, staircases, landings, steps, brackets etc. (including single pour concreting upto 250m3), including cost of admixtures if used,providing pockets, openings, recesses, chamfering etc., wherever req

corporations/Associations/Others

CTN :42485358 Due date: 03 Dec, 202503 Dec, 2025 55.80 Lacs
Tender For supply of digital radiography system type c (qty:10) - digital radiography system 50kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of center

corporations/Associations/Others

CTN :42485371 Due date: 03 Dec, 202503 Dec, 2025 75.33 Lacs
Tender For supply of digital radiography system type b (qty:10) - digital radiography system 80kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of center
 Loading, Please wait...

Connect us via What's Up