Get complete information related to latest Batch Reactor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Batch Reactor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Batch Reactor Tenders.
Tender For camc of qty twenty four machineries and ndt equipments at component repair shop - upstroke hydraulic press with hyd tank and motor pt no indimech hydraulic press sl no 7193 , extruder with machine pt no indimech extruder sl no nayg crs ewm 01 , rubber mixing machine pt no indexpell rubber mixer sl no nayg crs rmm 02 , stand for test acceptance of air system unit pt no c 3757 ue 82 sl no 01 , stand for test gen purpose hydraulic rig pt no c 3390ue 82 sl no 02 , stand for test fuel rig pt no c 3869mue 82 sl no 03 , hydraulic callibration set pt no 63b 0001na sl no 512 , pneumatic calibration set pt no 63b 0001na sl no 513 , climatic chamber minus 40 degree to 20 degree pt no climatic chember minus 40 deg sl no nayg crs cc 03 , charging unit of fire extinguisher system pt no zssp sl no 1 , sonic bond master 1000 multimode with accessories pt no 9020342 reve sl no 1000c12465079107 , ultrasonic plant pt no uzu 2 kor u sl no 169 , ultrasonic filter cleaning rig pt no uc 500w sl no 10541 , magnetic particle flaw detector pt no ferro test gwh 15 sl no 1548752 , bond testing flaw detector pt no bond master 600 sl no 60002161046 , ultrasonic flaw detector pt no epoch 650 sl no 160164102 , eddy current flaw detector pt no nortech 600 sl no 60002161072 , ultrasonic thickness meter pt no 38 dl plus sl no 161265703 , high pressure compressor pt no revell tc3 1 by 2 mk 7 compressor sl no nayg crs hpc 04 , electronic weighing machine capacity 300 kgs pt no ds 415 sl no g415028098 , oven rane 0 degree celceius to minus 300 degree celceius pt no oven 330 deg sl no nayg crs oven 05 , tu hydraulic trolley tu0014 sl no 001 , installation set for checking and pressing hp vessels pt no upos 1 sl no 28 1018107 1 , halon gas filling system pt no jj 2023 point 02 sl no lf 57
Tender For construction of 1.80 mld capacity sequential batchreactor (sbr) type sewage treatment plant for zone-4 of arakalagudu town & providing 150 mm to 200 mm dia sewer main for attending missing links in zone-4 under providing ugd system to arakalagudu town (lumpsum tender)
Tender For custom bid for services - pdm1b24334 agency for hydro testing and ibr liaison during repair maintenance schedule testing of boilers hrsg ibr exchanger ibr vessels and other ibr equipment for power plant and other units of refinery during normal operation and shutdown-1) carbon steel piping for hydrocarbon services (with welding electrode e-6010 / e-7018) - units transportation of all piping items from owner's storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of sw valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch nb, specifications, codes etc. and as per the instructions of the engineer-in-charge to his entire satisfaction. the scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the engineer-in-charge., 2) provision of reinforcement pad (with welding electrode e-6010 / e-7018) transportation from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per the instructions of the engineer-in-charge to his entire satisfaction. the scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the engineer-in-charge. 3) extra for ibr grade carbon steel piping joints. for ibr piping jobs, the scope of contractor shall be liasoning with ibr authorities including approval of drawings / documents from ibr authorities and also getting the final approval of the job from ibr authorities including payment of any fee or charges to ibr authorities for this purpose (20% of joints). 4) alloy steel piping (astm a335 gr. p22) units- transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawings etc. (alloy steel joints shall be welded by doing root run using tig welding followed by filler passes by manual / semi-automatic arc welding. the job is to be pre-heated prior to welding and all joints to be stress relieved and fully radiographed, however, charges for st
Tender For corrigendum : short refit of in ship> - ins astradharini sr-25 - hull00001dockingdocking (mt-10140)(mt-10140)(a) the refitting authority is to take all actions to ensure that the docking is carried out in accordance with the latest issue of the docking plan for the planned version of the docking which is specific to the vessel (and not generic to a class of vessels) and for a particular docking procedure. the refitting authorities are to forward docking plan, along with the check off list promulgated vide nc/policy/h-134/refit dated 11 may 18, to ihq(n)/dna through command hqs for approval. the docking facility is to be prepared in accordance with the requirements of the docking plan and docking procedures. (b) a dock master is to be appointed by the refitting authority for each docking evolution and the same is to the intimated to commanding officer/ master of the vessel as per format of no str 01/11, preferably 72 hours in advance of the commencement of docking evolution. (c) refitting authority (dock master and planner) are to review the calculation submitted by the ship. the docking/ undocking conferences are to be organised by the refitting authority (dock master and refit planner) to review readiness for docking/ undocking operations, at least 24 hours prior docking/ undocking. further, in order to understand criticality of each operation, and demarcation of responsibilities of the stakeholders, the dock master is to conduct a centralised briefing for all the stakeholders 24 hours prior every docking/ undocking operation., 00002u/w hullexternal underwater area (mt-11023)(a) remove marine fouling from entire uw external hull area using wooden scrapper or hydro jetting with maximum pressure not exceeding 3000 psi., 00002u/w hullexternal underwater area (mt-11023)(b) scrape and clean under water and boot topping area (including wind and water areas) to remove all loose paint film, rust etc. paint scheme repair/ renewal is to be undertaken iaw ihq, mod policy letter nc/0528/llps dated 20 jul 11 and ncd 1491 issue 1 of may 11 and surface preparation to be undertaken iaw with no 53/16 (note :- wind and water areas to be considered up to 500mm above boot top.), 00002u/w hullexternal underwater area (mt-11023)(c) carry out survey of external uw hull structure in accordance with no 01/15 and ihq mod (n)/ dna letter nc/7631 dated 01 nov 22 as follows :-note:- 100% visual survey of complete underwater hull and boot top including wind and water areas i.e. area up to 500mm above boot top area., 00002u/w hullexternal underwater area (mt-11023)(d) excessive areas of breakdown of abrasive anticorrosive paints to be blasted and recoated with full paint scheme. paint scheme on full underwater hull and boot top including wind and water areas i.e. area up to 500mm above boot top area is to be restored. surface preparation to be undertaken iaw with no 53/16. paint scheme repair/ repairs is to be undertaken iaw ihq, mod (n) policy letter nc/0528/llps dated 20 jul 11 and ncd 1481 issue 3 of may 11., 00002u/w hullexternal underwater area (mt-11023)(e) application of one coat of a/f paint on under water hull and boot top area to be carried out post adequate surface preparation based on the findings of joint inspection with oem. paint touch up/ maintenance painting to be carried out iaw no 53/16/ policies/ ncd in vogue., 00002u/w hullexternal underwater area (mt-11023)(f) paint scheme of all technical windows above water line to be restored iaw no 53/16. test and trials of all renewed plates are to be carried out iaw para 42 and 43 of no 01/15., 00003u/w hull (as per no 53/16)preservation/ paintingcarry out assesment based painting of external underwater hull including boot top area wherever applicable (post joint uw inspection). carry out fresh water hosing down before starting of painting. the u/w hull painting includes painting of u/w fittings, gratings and other u/w appendages as well.note:(i) warranty of paint scheme should be confirmed from