Get complete information related to latest Batton Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Batton Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Batton Tenders.
Tender For corrigendum : tender for supply of procurement of spares for travelling tripper for fgd at ntpc kudgi -tripper wheel , ep011001ga01&02 , 600mm , drive axle , 3 , encore , tipper , 150tph , nde axle , 4 , encore , tripper , 150tph , rail cleaner , ep011001ga01&21 , encore , end stop buffer , ep011001ga01&26 , encore , belt tnsn arngmnt , 34 , encore
Tender For auction sale of others - lot no.1 u/s & scrap injection moulded silent block for center pivot arrgt. of bg coaches, ratio of(iron & rubber)-80:20,total qty of iron in mt-3.2 mt(3200 kgs),total qty of rubber in mt-0.8 mt(800 kgs),total qty-04 mt(4000 kgs),lot no.2 u/s & scrap silent block for anchor link of bg coaches,ratio of(iron & rubber)-80:20,total qty of iron in mt-2.4 mt(2400 kgs),total qty of rubber in mt-0.6 mt(600 kgs),total qty-03 mt(3000 kgs),lot no.3 u/s & scrap injection moulded silent block(type-b) for anchor link, ratio of(iron & rubber) - 80:20, total qty of iron in mt - 1.6 mt (1600 kgs) ,total qty of rubber in mt - 0.4 mt (400 kgs), total qty - 02 mt (2000 kgs), lot no.4 u/s & k-type high friction brake block, ratio of (iron & rubber) - 10:90, total qty of iron in mt - 0.3 mt (300 kgs) ,total qty of rubber in mt-2.7 mt (2700 kgs),total qty-03 mt (3000 kgs),lot no.5 u/s & scrap ball joint traction level, ratio of (iron & rubber)-60:40,total qty of iron in mt-1.8 mt (1800 kgs),total qty of rubber in mt-1.2 mt(1200 kgs),total qty-03 mt(3000 kgs),lot no.6 u/s & scrap flexible joint roll link for lhib flat bogie(silent block for anti roll bar link),ratio of(iron & rubber)-60:40,total qty of iron in mt-1.2 mt(1200 kgs),total qty of rubber in mt-0.8 mt(800 kgs),total qty-02 mt(2000 kgs),lot no.7 u/s & scrap traction centre elastic joint, ratio of(iron & rubber)-60:40,total qty of iron in mt-1.2 mt(1200 kgs),total qty of rubber in mt-0.8 mt(800 kgs),total qty-02 mt(2000 kgs),lot no.8 u/s & scrap lateral bump stop, ratio of(iron & rubber)-50:50,total qty of iron in mt-01 mt(1000 kgs),total qty of rubber in mt-01 mt(1000 kgs),total qty-02 mt(2000 kgs),lot no.9 u/s & scrap primary bump stop for flat ir bogie rcf drawing no.lw 01102 alt.d,ratio of(iron & rubber)-10:90,total qty of iron in mt-0.1 mt(100 kgs),total qty of rubber in mt-0.9 mt(900 kgs),total qty - 01 mt (1000 kgs), lot no.10 u/s & scrap rubber pad for longitudinal bump stop for lhb fiat ir bogie , ratio of (iron & rubber)-50:50, total qty of iron in mt-0.5 mt(500 kgs),total qty of rubber in mt-0.5 mt (500 kgs),total qty-01 mt (1000 kgs),lot no.11 u/s & scrap rubber pad for primary suspension for fiat ir bogie drawing no.1901097,ratio of (iron & rubber)-10:90,total qty of iron in mt-0.05 mt(50 kgs),total qty of rubber in mt-0.45 mt (450 kgs),total qty-0.5 mt(500 kgs),lot no.12 u/s & scrap brake pad for lh & rh for lhb coaches,ratio of(iron & rubber)-10:90,total qty of iron in mt-0.05 mt (50 kgs),total qty of rubber in mt-0.45 mt (450 kgs),total qty-0.5 mt(500 kgs),lot no.13 u/s & scrap shock absorber-600 kg, ratio of (iron & rubber)-60:40,total qty of iron in mt-0.3 mt (300 kgs),total qty of rubber in mt-0.2 mt (200 kgs),total qty-0.5 mt (500 kgs),lot no.14 u/s & scrap buffer pad,draft pad (rubber & iron), ratio of (iron & rubber)-20:80,total qty of iron in mt-0.1 mt (100 kgs) ,total qty of rubber in mt-0.4 mt (400 kgs),total qty-0.5 mt (500 kgs),lot no.15 u/s & scrap air spring, ratio of (iron & rubber)-10:90,total qty of iron in mt-0.1mt(100 kgs),total qty of rubber in mt-0.9 mt(900 kgs),total qty-01 mt(1000 kgs),lot no.16 u/s & scrap vestibule rubber,ratio of(iron & rubber)-10:90,total qty of iron in mt-0.2 mt(200 kgs),total qty of rubber in mt-1.8 mt(1800 kgs),total qty-02 mt(2000 kgs),lot no.17 u/s & scrap ladder, ratio of (iron & rubber)-80:20, total qty of iron in mt-0.8 mt(800 kgs) ,total qty of rubber in mt-0.2 mt(200 kgs),total qty-01 mt(1000 kgs),lot no.18 u/s & scrap grease seal, ratio of (iron & rubber)-80:20,total qty of iron in mt-0.8 mt(800 kgs),total qty of rubber in mt-0.2 mt(200 kgs),total qty-01 mt(1000 kgs),lot no.19 u/s & scrap hose connection for bmbc 15 mm bore, ratio of (iron & rubber)-10:90,total qty of iron in mt-0.2 mt(200 kgs),total qty of rubber in mt-1.8 mt(1800 kgs),tota
Tender For upgradation of rgm/machine siding at -anpr, sktn, krsl, obra, krlr, sgrl & cpu- (buffer stop, rail level platform-900sqm, water booth, deep tube well and 2 nos. lentoo shed and miscellaneous work.
Tender For upgradation of rgm/machine siding at mqx, wdm, dxn, rnq & slbn (buffer stop, rail level platform, water booth, deep tube well and leantoo shed) in sse/works/rnq section under aden/rnq.
Tender For maint of rota side wagon tippler e e -repl of main rails and raising of rails , tightening, repl. of all bolts, clits , repl,re fixing of bushes , repl of spur gear assembly , repl of rack pinion , oh of reduction gear box , replacement of sector gear , alignment, grouting of tippling base rollers , repl,repairing of hopper grill , alignment of tipplers , repl,repairing of outboard stool , dismantling,repl of top pivot housing , repl of wooden block , matching of teeth of sector gear , re-fixing lock lever , repl of top stop locking gears assly , side beam fixing of tippler , alignment of motors of wagon tippler , servicing of spray line valve size 4 inch , servicing of spray line valve size 3 inch , servicing of spray line valve size 2 inch , oh of overhead spray pumps , servicing of spray nozzles , lifting, proper fixing of vf tray , changing, fixing of side packing , to provide the patches , repl of plates of vf tray, chutes , removal of foreign , fillings oil in gear box , servocoating,tightening, repl of damaged bolts , greasing of all the nipple point , repl of break shoe liner , repl of main rail beam of wagon tippler , provision of backup in main rail beam , work on central platform , repairing of main rail beam , repairing of rollers of coal spill plates , fab, erection of back support of vf mouth chute , fab., installing of vf tray supports , repl of coal spill plate , repairing of pit platform of main rail beam , repl of damaged beam of vf , repairing of counter balance beam , repairing of mdu base structure , repairing of damaged split spur gear , fab., of mouth piece of vf , erection of new fabricated mouth piece of vf , oh of hoisting system , oh of hopper spray pump, line , provision of hopper liners, in coal hopper of vf , fab. erection of coal hopper partition stool , raising and re-fixing of mouth piece of coal liner chute of vf , repl of back,side plate of mouth piece , to attend the coal leakage from top mouth piece , re-fixing,repositioning of side and back supports , repairing,reposition of side guards of mouth piece , repl of buffer block and buffer pads of counter balance beam , repl of brake drum of thruster brake assly , repl of input,output,intermediate pinion of gear box , fab. and erection of counter balance beam , repairing of wagon tippler plate form by cutting and welding , removing the fallen loaded wagon in pit , inserting the side beam pins in bracket , dismantling,removing the broken shafts of wagon tippler , installation of drive and adjacent intermediate shaft , cutting, fabricated and installation of resting outer rail beam bottom plate