Tender For supply of mobilization of necessary eqpt and manpower,topographical survey work of 50 acre,dpr preparation for storm water drain,site clearance for moving of eqpt and labour,hard copy of report duly vetted from the iit or nit
Tender For job no. 49.2026 site clearance by lifting and disposal of unserviceable building material and malba from 6 nos. parks in sector 14 pii, hisar.
Tender For selection of consultant for eia study and environmental clearance for proposed sanitary landfill site for municipal solid waste at suthani nagar nigam gorakhpur
Tender For 2.site clearance and disposal of legacy wastes (old municipal solid waste) from niramoy bypass road to the solid waste management plant under dubrajpur municipality, birbhum (phase-ii)
Tender For preparation and approval of mining plan obtaining environment clearance for sand/gravel mining 4 sites of gorisan khanmommamad npro_ld_ld2_st_12 ,13,14,15 and site 5. baliewal of ludhiana.
Tender For corrigendum : annual rate contract for procurement of 22 kw electric motor driven 250 scmh capacity hydraulic booster compressors for pune, nashik, sindhudurg, ramanagara, nanded and nizamabad gas of mngl. - supply, installation & commissioning, design, engineering, manufacturing, supply including packaging and forwarding, insurance, custom clearance, handling and unloading at port as well as mngl s site/store of skid mounted 22 kw electric motor driven 250 scmh hydraulic cng booster compressor package, freight, loading-unloading charges of hydraulic booster compressor & auxiliaries for any of the following locations:pune ga, nashik ga, sindhudurg ga, ramanagara ga, nanded ga, (buldhana-parbhani-nanded) & nizamabad ga (nizamabad-adilabad-nirmal-macherial-kumuram bheem asifabad-kamareddy districts), special tools & tackles., design, engineering, manufacturing, supply (including packaging and forwarding, insurance, custom clearance, handling and unloading at port as well as mngl s store/site) of 1.5 kw electric motor driven air compressors with dryer and receiver. (for locations mentioned in sr. no. 1.01), installation, commissioning & field performance test of compressor package at site., site activity, lump-sum annual repair & maintenance charges during warranty period of 1 (one) year inclusive of all consumable, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for second year i.e. after first year of warranty period, inclusive of all consumables, manpower, spares, lubricants but excluding electric power charges., lump-sum annual repair & maintenance charges for third year i.e. after first year of warranty period and second year amc, inclusive of all consumables, manpower, spares, lubricants but excluding electric power charges., lump-sum annual repair & maintenance charges for fourth year i.e. after first year of warranty period, second & third year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for fifth year i.e. after first year of warranty period, second, third & fourth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for sixth year i.e. after first year of warranty period, second, third, fourth & fifth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for seventh year i.e. after first year of warranty period, second, third, fourth, fifth & sixth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for eighth year i.e. after first year of warranty period, second, third, fourth, fifth, sixth & seventh year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for ninth year i.e. after first year of warranty period, second, third, fourth, fifth, sixth, seventh & eighth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges., lump-sum annual repair & maintenance charges for tenth year i.e. after first year of warranty period, second, third, fourth, fifth, sixth, seventh, eighth & ninth year amc inclusive of all consumables, manpower, spares, lubricants, but excluding electric power charges.