Tender For supply of bogiecentrepivotbottom to rdso [w] drg. no. wd-85079-s/2, alt. 29, item no. 1, conforming to rdso spec. no. wd-17-casnub-22hs-bogie-92 [rev. 4] of sept 2024. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8lacs ] ]
Tender For supply of "bogiecentrepivotbottom for casnub bogies to rdso drg. no.wd-85079-s-2, alt-29,item 1 & other technical requirements conforming to rdso specification no. wd-21-casnub-22nlb bogie-93, rev.2 of july 2002, read with all amendments, latest amendment no. 6 of july-2020." [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : s&t work i.c.w. provision of shunting neck on line no 4, both sides at chaukhandi(chh) station of lucknow division of northern railways.
Tender For signalling related work for provision of one additional goods line adjacent to existing up side goods shed line and both line connectivity to up ml at manikgarh end, short shunting neck at manikgarh end etc at ballarshah station of nagpur division
Tender For dbu-ohe modifications in connection with provision of emergency dispatch cross over at ynk end for providing universal r&d facility to all running lines and connectivity from tower car shed to existing shunting neck including extension of existing neck from 440 to 600m.
Tender For corrigendum : dbu-ohe modifications in connection with provision of emergency dispatch cross over at ynk end for providing universal r&d facility to all running lines and connectivity from tower car shed to existing shunting neck including extension of existing neck from 440 to 600m.
Tender For corrigendum : supply of bogiecentrepivotbottom for casnub 22 hs bogies to rdso drg. no. wd-97049-s/3, alt 12, item no. 1. other technical requirements conforming to rdso spec. no. wd-17-casnub-22hs-bogie-92 (rev. 04). [ warranty period: 72 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]