Get complete information related to latest Bolster Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Bolster Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Bolster Tenders.
Tender For supply of helical spring for modified bogie bolster outer as per icf drg no.emu/m/0-5 -050 item 1 alt k/2 for motor coaches. [ warranty period: 30 months after the date of delivery ]
Tender For supply of adjusting shim for body support for fiat bogie coaches as per drg. no. 1267474 ver. 0 1r [ warranty period: 30 months after the date of delivery ]
Tender For supply of hanger for bolster spring suspension to drg. no.-t-0-5-639, alt-g/11 and rdso str no.-c- k 105 (rev.-1) of july 2014. [ warranty period: 30 months after the date of delivery ]
Tender For supply of hanger for bogie bolster spring suspension to icf's drg.no. t-0-5-639 , alt.n o.-g/11 and rdso's str no. c-k 105 rev-1 of july'2014 with amendment slip. no 1 of december 2016 [ warranty period: 30 months after the date of delivery ]
Tender For supply of shim for elastic ring for 3 phase loco, size od- 158 mm, id: 92 mm, thickness- 2 mm, 06 nu mbers holes of dia. 14 mm with pcd- 130 mm and 60 degree angle center distance hole, material is: 2062, zinc plated, as per drawing no. b/trs/bogie/4/505. ]
Tender For supply of bogie bolster (coil spring) for lhb coaches as per rcf drg. no. 1267420 ver. 04r & mdt s 204001 rev 01 or latest. [ warranty period: 30 months after the date of delivery ]
Tender For supply of shim size 100x180 holes 13.5x2 pcd 150 thickness 1 mm for bobyn wagon, as per rdso dr g.no.:- wd-01065-s-02, alt 02, item no. 8, material specification as per drawing. [ warranty period: 30 m onths after the date of delivery ]
Tender For supply of shim size 150x100mm, holes dia-13.5x2 pcd 120 thickness 1 mm (is:2062 e250a, fe410 wit h cu) for blc wagon, as per drawing no. c-9405-s/16, alt. 07 item no.-10 [ warranty period: 30 months a fter the date of delivery ]