Get complete information related to latest Brack Item Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Brack Item Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Brack Item Tenders.
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For procurement of turbo charger spares - flinger sleeve for tel 125929020595 - eic bsiii, back plate for tel 125929020595 - eic bsiii, shaft & wheel for tel 125929020595 - eic bsiii, central housing for tel 125929020595 - eic bsiii, minor repair kit for tel 125929020595 - eic bsiii, oil seal plate for holset 5358704 - eic bsiv, shaft & wheel for 127019020977 - ll bsiv, impeller/compressor wheel for tel 27019020977 - ll bsiv, bearing housing for tel 127019020977 - ll bsiv, minor repair kit for tel 127019020977 - ll bsiv, secondary kit for tel 53279706750 - ll bsiii, back plate for tel 53279706750 - ll bsiii, shaft & wheel for tel 53279706750 - ll bsiii, impeller/compressor wheel for tel 53279706750 - ll bsiii, bearing housing for tel 53279706750 - ll bsiii, minor repair kit for tel 53279706750 - ll bsiii, heat shield for holset 5352729/ 5358704 - ll bsiv, eic bsiv, thrust collar for holset 5352729 - ll bsiv, oil seal plate for holset 5352729 - ll bsiv, shaft & wheel for holset 5352729/ 5358704 - ll bsiv, eic bsiv, impeller for holset 5352729/ 5358704 - ll bsiv, eic bsiv, bearing housing for holset 5352729/ 5358704 - ll bsiv, eic bsiv, minor repair kit for holset 5352729/ 5358704 - ll bsiv, eic bsiv, heat shield for holset 4031528 - tt bsiii, thrust collar for holset 4031528 - tt bsiii, oil seal plate for holset 4031528 - tt bsiii, shaft & wheel for holset 4031528 - tt bsiii, impeller/compressor wheel for holset 4031528 - tt bsiii, bearing housing for holset 4031528 - tt bsiii, minor repair kit for holset 4031528 - tt bsiii
Tender For annual maintenance contract i.e. repair and maintenance of komatsu d475a dozer sl.no. 30204, 30533, 30534, 30541, payloader wa600 sl.no. 65135 wa800-3eo sl.no.70179 and wheel dozer wd600, sl no. 50453 and wa900 sl.no. 95183 for a period of 01 year.
Tender For supply of complete vehicle servicing washing and changing of engine oil air filter , carburetor service , replacement of noise bearings , replacement of brake shoe rear , seat cover , rear wheel dampers set , throttle cable , cobi brake cable , silencer packing , tappet setting , electric current coil , repair of noisy gearbox assembly
Tender For supply of complete vehicle servicing washing and changing of engine oil diesel filter oil filter air filter and fitting , wheel alignment balancing and tyre rotation , replace of clutch plate pressure plate with clutch bearing , engine tunning and tappit settings , greasing of vehicle with unsv bearings sets , repair of gear lever assembly by replacing rubber joints , repair replacement of rear brake cylinder assembly , rapair of noisy differetail box assembly , repair replace of shaft penion joint assembly with bearing set 02 nos , new fittings of unsv tarpoline defence , replacement of wipper motor assembly , replacement of unsv brake linear front and rear , welding work on tail board joints , repair replace of air pressure maintain valve , minor denting painting work right mudguard , replacement of rear brake light assembly right