Get complete information related to latest Brake Rigging Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Brake Rigging Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Brake Rigging Tenders.
Tender For conversion of brakerigging of wag-9h locomotive from tbu/pbu type brakerigging to conventional type brakerigging including modification to loco body as per rdso modification no. rdso/2009/el/ms/0381 rev'0' dated 07.09.2009 with latest amendments including supply of material, labour, tools, machineries, transportations etc
Tender For supply of aoh kit for brakerigging items of wag7 locos consisting of:- (1)flat split co tter to is:2638 (a)size- m5 x 12 x 65 mm - 6n0s. (2) split pin to is: 549 (a)size- m5 x 90 mm -3 no s. (b)size- m6 x 50 mm -1no. (3) flat washer to is:2016 (a)size- i/d-28 mm, o/d-45 mm, th-5 mm - 3 nos. (b)size- i/d-35 mm, o/d-55 mm,th-3 mm -3 nos. (c)size-i/d-60 mm, o/d-100 mm, th-5 mm -1 n o. (d)size- i/d-40 mm ,o/d-65 mm, th-3 mm -3 nos. [ warranty period: 30 months after the date of d elivery ]
Tender For supply of ball joint traction lever to fiat drg. no.c53.973. ref bred 8403, rev.02r1 (ff 1521728 mod 01), to bef read with t.s.17.53210000, t.s.17.617.100 02, mdts-148 rev.01 & mdts-122 rev.'03'.
Tender For supply of ball joint traction lever to fiat drg. no c53 973 ref bred 8403 rev.02 (ff1521728 mod 01), to be read with t.s. 17.532 100 00 , t.s. 17.617.100 02, mdts-148 rev.01 & mdts-122 rev. '03' . [ warranty period: 30 months after the date of delivery ]
Tender For supply of flexi coil bogie frame complete with brakerigging for wap-4 locomotives conforming to rds o's spec.no. mp.0.4900.04 rev. 01 of oct'2004 and drg. no. (i)03/1/12/38 alt. 3, (ii)03/1/12/39 alt. 1, (iii) 0 3/1/12/40,(iv)03/1/12/41, (v)03/1/19/36,alt.16, (vi) 03/1/19/37 alt. 5 & (vii) 03/1/19/38 alt. 6. note: brake ri gging component to be procured from clw approved sources only. [ warranty period: 30 months after th e date of delivery ]