Get complete information related to latest Brass Pipe Sale Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Brass Pipe Sale Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Brass Pipe Sale Tenders.
Tender For supply of ce010530004: ms scaffolding for 2x210mw tower type boiler furnace, qty: 1 set. , ce010530005: cup lock scaffolding 2x210mw hot flue gas duct, qty: 1 set.
Tender For corrigendum : construction of one nos. 275 m tall twin flue rcc chimney complete in all respect (but excluding chimney raft and borosilicate supply and its installation) for 2x660 mw dvc raghunathpur sg island package
Tender For corrigendum : expression of interest for selection of technology partner qfgdm associate for upcoming wet limestone based flue gas desulphurisation system
Tender For corrigendum : supply and application of zinc rich paint for flue gas duct structure from air preheater out to chimney inlet in boiler unit no. 3 at sikka tps. - epoxy zinc rich anti-corrosion paint (90 percentage - 95 percentage zinc), zinc primer (epoxy base - 60 percentage zinc), thinner (g.p.) suitable for epoxy paint, charges for the application of zinc rich paint on flue gas duct structure from aph outlet to chimney of boiler unit no. 3 at sikka tps as per scope of works and instruction of eic
Tender For supply and application of epoxy painting work for all rusted guillotine gates frame of cold air, hot air & flue gas duct of unit#01 of abvtps, cspgcl, janjgir-champa.
Tender For overhauling of flue gas damper assembly of aph inlet/primary/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital overhauling of unit6 of 2x250mw - “overhauling of flue gas damper assembly of aph inlet/primary air/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, fabrication & erection of platform with supporting structures and replacement/repairing of drain/cbd/wall blowing pipe line including bends in boiler during the capital overhauling of unit#6 of 2x250 mw, ctps, ptpp, parichha.” (45 days) (activity no.: 2.1.04)