Web Analytics Made Easy - StatCounter

Bridge Slab Tenders

Get complete information related to latest Bridge Slab Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Bridge Slab Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Bridge Slab Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44436678 Due date: 08 Apr, 202608 Apr, 2026 NA
Tender For electrical trd portion of work in connection with 1) rebuilding of 11 bridges (slab: 06, rcc pipe: 03, arch br: 02) and extension of 06 bridges (arches: 05, box: 01) in mohol-wadi section. 2) strengthening weak side slope by construction of toe wall murom filling, boulder pitching, preparing sub-bank dressing of bank by 2:1 slope for approaches of bridge no 552/1, 552/2, 557/3, 557/4 & 557/5 (total 1000*2=2000m) in kui-wd section. 3) provision of stabling and supporting work like portal, shotcreting, rock bolting etc. at critical locations inside tunnel no.2 in kwv-lur section in solapur division

CTN :44150058 Due date: 18 Mar, 202618 Mar, 2026 3.26 Crore
Tender For design and construction of 40 mtr span steel superstructure major pmt bridge over khet nallah at km 7.30 on tawaghat-sobla road on departmentally constructed substructure in, project hirak in uttarakhand state

Central Government/Public Sector

CTN :44204350 Due date: 20 Mar, 202620 Mar, 2026 NA
Tender For trd modification work in c/w strengthening of substructure and replacement of existing steel girders of 12.2m span of 06 nos. bridges in various sections of bikaner division by post tensioned psc slabs as per 25t loading standard in the jurisdiction of dy.ce/bridge line/jaipur.

Central Government/Public Sector

CTN :44124265 Due date: 16 Mar, 202616 Mar, 2026 NA
Tender For bridge strengthening and substructure works in connection with kanalus-porbandar section: replacement of existing steel girders by psc slabs for spans up to 12.20 m at bridge nos. 57, 86, 93, 96 and 119 (20 spans)
 Loading, Please wait...

Connect us via What's Up