Get complete information related to latest Bridge Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Bridge Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Bridge Work Tenders.
Tender For c/o bridgeworks on batera to kandal road km 0/00 to 10/405. ( sh :- c/o balance work of wing wall both side at 12.00 mtr span rcc slab culvert rd 2/450 .) under bridge 5054-04-101-01
Tender For c/o bridgeworks on batera to shatal road km 0/00 to 10/405. ( sh :- c/o balance work of wing wall both side of 10.00 mtr span rcc slab culvert rd 5/450 .) under bridge 5054-04-101-01
Tender For various s&t works in connection with various foot over bridgeworks & various enggworks over the tpj division and tower wagon siding work at tj junction
Tender For assessment of strength and structural adequacy of foundation, pier, abutment and substructure elements of (46 nos) bridges to cater the load of psc slabs in replacement of existing plate girder bridge as per rdso standard of 25t loading over the khurda road division.
Tender For construction of dapka to anhoni road, length 3.30 km. 1st call, pac rs. 359.07 lacs on road and bridgeworks sor 25.03.2022 (ammendment upto date), completion period 300 days i/c rainy season.
Tender For upgradation of pachmarh to rajendragiri road, length 2.50 km. 1st call, pac rs. 354.73 lacs on road and bridgeworks sor 25.03.2022 (ammendment upto date), completion period 300 days i/c rainy season.
Tender For construction of paliya pipariya to machherakala road. 1st call, pac rs. 308.56 lacs on road and bridgeworks sor 25.03.2022 (ammendment upto date), completion period 300 days i/c rainy season.
Tender For construction of chandon to karpa road. 1st call, pac rs. 365.20 lacs on road and bridgeworks sor 25.03.2022 (ammendment upto date), completion period 300 days i/c rainy season.
Tender For construction of sohagpur gundrai karanpur amadehi nakatua chargaon sangai road. 1st call, pac rs. 254.28 lacs on road bridgeworks sor 25.03.2022 (ammendment upto date), completion period 240 days i/c rainy season.