Get complete information related to latest Cab Heater Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cab Heater Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cab Heater Tenders.
Tender For repair/ maintenance to central heating plants and replacement of ppr pipes, control valves, heater, topping up of glycol, hot water supply at 41 fad, 3 idsr, cmir, b mess and station klp building and repair maint of calorifier and boiler at 270 tc under
Tender For supply of hose for cabheater as per clw spec.no. clw/es/3/436 alt-a, clw drg.no.clw/es/ 3/sk1/0436 or latest with reference date as tender closing date. [ warranty period: 30 months after t he date of delivery ]
Tender For supply of hose for cabheater as per clw spec. no. clw/es/3/0436 alt-a or latest, clw drg. no.-clw/es/3/sk-1/0436. [ warranty period: 30 months aft er the date of delivery ]
Tender For supply of hose for cabheater as per clw spec. no. clw/es/3/0436 alt-a or latest, clw drg. no.-clw/e s/3/sk-1/0436/a or latest. [ warranty period: 30 months after the date of delivery ]
Tender For supply of hose for cabheater of 3-phase loco as per clw specification no. clw/es/3/4 36 alt- a or latest and clw drg. no. clw/es/3/sk1/0436 alt-nil or latest. note: this is shel f life item and should be procured with staggered delivery period. supplier to mention /print date of manufacturing on the item & item to be supplied within 60 days of manufa cture [ warranty period: 30 months after the date of delivery ]
Tender For supply of rotary switch for cabheater/cab fan as per clw spec.no.clw/es/3/0108 or latest and abb d ocument no.hbtb 58558 or 5022 or latest.clw/es/3/0108 or latest. [ warranty period: 30 months after the dat e of delivery ]
Tender For supply of 1.design manufacture supply and commissioning of calorifier 750 l and 50 kw , 2.on board spares of calorifier , 3.documentation , 4.services of engineers for calorifier , 5.operation and maintenance training for calorifier , 6.warranty extension , 7.extra man-days 1st yr from equip. delivery , 8.extra man-days 2nd yr from equip. delivery , 9.design manufacture supply and commissioning of calorifier 500 l and 35 kw , 10.on board spares of calorifier , 11.documentation , 12.services of engineers for calorifier , 13.operation and maintenance training for calorifier , 14.warranty extension , 15.extra man-days 1st yr from equip. delivery , 16.extra man-days 2nd yr from equip. delivery , 17.design manufacture supply and commissioning of calorifier 500 l and 35 kw , 18.on board spares of calorifier , 19.documentation , 20.services of engineers for calorifier , 21.operation and maintenance training for calorifier , 22.warranty extension , 23.extra man-days 1st yr from equip. delivery , 24.extra man-days 2nd yr from equip. delivery , 25.design manufacture supply and commissioning of calorifier 500 l and 35 kw , 26.on board spares of calorifier , 27.documentation , 28.services of engineers for calorifier , 29.operation and maintenance training for calorifier , 30.warranty extension , 31.extra man-days 1st yr from equip. delivery , 32.extra man-days 2nd yrfrom equip. delivery , 33.design manufacture supply and commissioning of calorifier 500 l and 35 kw , 34.on board spares of calorifier , 35.documentation , 36.services of engineers for calorifier , 37.operation and maintenance training for calorifier , 38.warranty extension , 39.extra man-days 1st yr from equip. delivery , 40.extra man-days 2nd yr from equip. delivery , 41.design manufacture supply and commissioning of calorifier 500 l and 35 kw , 42.on board spares of calorifier , 43.documentation , 44.services of engineers for calorifier , 45.operation and maintenance training for calorifier , 46.warranty extension , 47.extra man-days 1st yr from equip. delivery , 48.extra man-days 2nd yr from equip. delivery , 49.design manufacture supply and commissioning of calorifier 500 l and 35 kw , 50.on board spares of calorifier , 51.documentation , 52.services of engineers for calorifier , 53.operation and maintenance training for calorifier , 54.warranty extension , 55.extra man-days 1st yr from equip. delivery , 56.extra man-days 2ndyr from equip. delivery
Tender For supply of rotary switch for cabheater/cab fan as per clw spec.no.clw/es/3/0108 or latest. note: cl w approved sources shall only participate in the tender or supplier offers shall be considered with valid te nder specific authorisation certificate from clw source shall be submitted along with their offer. [ warran ty period: 30 months after the date of delivery ]
Tender For supply of cabheater/ventilation assembly as per clw specification no. clw/es/3/0109 alt.f or latest. [ warranty period: 30 months after the date of delivery ]