Web Analytics Made Easy - StatCounter

Canal Door Tenders

Get complete information related to latest Canal Door Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Canal Door Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Canal Door Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

corporations/Associations/Others

CTN :44117558 Due date: 11 Mar, 202611 Mar, 2026 8.66 Lacs
Tender For supply of various spare parts of dewatering system, river sluice gate & penstock gate of garudeshwar weir of sardar sarovar project, ekta nagar.

corporations/Associations/Others

CTN :44058535 Due date: 25 Feb, 202625 Feb, 2026 NA
Tender For urgent restoration of 2 nos. non- functioning c.i penstock gate (size - 2744 mm x 1372 mm) by thorough repairing, servicing including replacement of defective spare parts at swf station of pdps under pbps(drg.)/s and d.

corporations/Associations/Others

CTN :44059933 Due date: 26 Feb, 202626 Feb, 2026 NA
Tender For urgent overhauling, repairing of defunct c.i penstock gate (size 2.3m x 1.69 m x 0.15 m) by replacing the spindle and other damaged spares at the inlet channel of pump unit no g with other allied works at dwf station of pbps(drg)/s and d.

corporations/Associations/Others

CTN :44078576 Due date: 25 Feb, 202625 Feb, 2026 9.80 Lacs
Tender For repairing of ci penstock gate at munshigunge road near gulabi tea and ms penstock gate at bidhan colony under br. ix.

State Government

CTN :43942354 Due date: 24 Feb, 202624 Feb, 2026 6.75 Lacs
Tender For brief scope of work covers, in sharavathy generating station (sgs) gallagher make integrated perimeter protection system (electric fence), with total perimeter length of 1.1km, is installed and in service in 3 phases as follows.1 phase from sgs security gate to penstock lift side all along the retaining wall and ody area near penstock right side.2 phase on existing retaining wall of penstock area (behind power house).3 phase adjacent to ody area, tail race up to security room at main gate of sgspreventive maintenance shall be provided once in two months (6 times in an year) during prime shift hours of coverage. ltd.,jogfalls. breakdown maintenance in extreme case, if the spares are not available immediately, repair shall be carried out within 2 weeks. this contract will be comprehensive in nature. replacement of detective parts.
 Loading, Please wait...

Connect us via What's Up