Web Analytics Made Easy - StatCounter

Cement Concrete Bed Tenders

Get complete information related to latest Cement Concrete Bed Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cement Concrete Bed Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cement Concrete Bed Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :39230408 Due date: 21 Feb, 202521 Feb, 2025 47.20 Lacs
Tender For package-15 - earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level.depth upto 1.5 m, providing, laying, spreading and compacting of granular sub-base by providing close graded material (table 400-1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per mort&h specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.grading - iii material, providing and laying lean cement concrete 1:4:8 in sub- base over a prepared sub-grade with coarse and fine aggregate conforming to is: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 mpa at 7 days, mixed in concrete mixer, laid manualy, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of mort&h specification including all material, labour, machinery, lighting, guarding and maintenance of diversion., providing and laying un-reinforced, dowel jointed, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to is: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to linesand grades complete as per drawing and as per clause 602, 112 of mort&h specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.pcc m-20 -base of drain work, reinforcement for r.c.c. work at all levels including straightening, cutting, bending, placing in position and binding all complete.mild steel and medium tensile steel bars., centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :foundations, footings, bases of columns, etc. for mass concrete.
 Loading, Please wait...

Connect us via What's Up