Get complete information related to latest Chappal Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Chappal Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Chappal Scrap Tenders.
Tender For supply of r1 spares of jcb boot air pre cleaner , water separator assy , exhaust pipe , fuel pump assy with fuel pump , mirror left side , mirror right side , bucket pin nut and bolt , front screen glass , fuel tank cap , transmission solenoid switch , wiper motor , cabin mirror , l type grease nipple , fuel filter primary , hyd filter , air cleaner filter inner , air cleaner filter outer , ignition switch , relay 12 volts , fuel pipe , fuze 12 volt , light bulb 12 volt , pre cleaner jar , bucket teeth nut bolt , bucket bush , radiator cap , grease nipple 50 pcs each pkt , wiper blade , head light , cabin light , fan switch , indicator light , thermostate valve , solenoid switch , oil seal kit , fuel element -
Tender For supply of - winner , runner up , golden boot , fair play team ,commentator hiring charges , uniform for all players , goalkeeper gloves , towel , track suit , whistle , stop watch ,unbranded football , net , score board , referee cardsyellow and red , refreshment for players , hiring charges of pa system , hiring charges for 120 chair per chair rs 10per day for 10 days , changing board , chuna , set of flags, pain spray , water bottler , medical kit , stationary ,pamphlets and hoarding , videography and live streamingof matches
Tender For corrigendum : fabrication and erection (major and general jobs) - replacement of worn out roof portion of final molasses storage tank no. 1 & 2 with m.s plate 4/5/6mm and supporting channel /angle., replacement of worn out m.s. vertical supporting channels & side plate of final molasses storage tank with m.s plate and channels., dismantling, fabrication and erection of top ms plate of pan with supporting ribs( as per existing design)., strengthening of pans shell with angle and channels in round shape with ms angle 75x75mm and dia 4.34 mtr. (3 rounds), strengthening of evaporator shell with angle and channels in round shape with ms angle 75x75mm and dia 2.80 mtr. (3 rounds), dismantling, fabrication, erection of top cone below save all of evaporators., dismantling, fabrication, erection of complete save all (existing design) of evaporators including top plate, inner and outer shell of pan., dismantling, fabrication, erection of worn out portion of pan shell with supports in all respect., dismantling, fabrication, erection of steam washing coil inside the pan(each), dismantling, fabrication, erection of umbrella of save all evaporator 3rd/ 4th body as per existing design including all supporting., dismantling, fabrication and erection of quad condensate tank/ syrup bottle including all connection. approx. size dia 509mm x length 1800mm, dismantling, fabrication and erection of priming tank for condensate water (both side blind) size dia 800mm x length 800mm, dismantling, fabrication, erection of stirrer(fan) of aeration tank at etp as per existing design including complete commissioning and trial, increase in size of existing hot water storage tank size length 4 x width 7 5 (side plate 6mm & bottom plate 8mm), dismantling, fabrication, erection of hot water weighing tank of water weighing scale. size dia 1.6 mtr x 1.5 height x cone 1 mtr length .the erection work for this job will also include all connections which are dismantled during dismantling., dismantling, fabrication, erection of mix juice weighing tank of juice weighing scale. size dia 2 mtr x 1.5 mtr height x cone 1 mtr length .the erection work for this job will also include all connections which are dismantled during dismantling., dismantling, fabrication & erection of juice feed boxes of juice heater double bead valve. the erection work for this job will also include all connections which are dismantled during dismantling., dismantling, fabrication & erection of absorption tower of juice sulphiter. the erection work for this job will also include all connections which are dismantled during dismantling, dismantling, fabrication & erection of worn out stainer of mix juice tank/ sulphited juice tank / syrup tank., dismantling, fabrication and erection of the sulphur furnace with existing design (by 20 mm ms plate) this work include dismantling and erection of all connections, man hole, flanges etc of sulphur furnace., dismantling, fabrication and erection of melter of sulphur furnace as per existing design. this work include dismantling and erection of all connections, man hole, flanges etc., dismantling, fabrication and erection of scrubber of sulphur furnace as per existing design. this work include dismantling and erection of all connections, man hole, flanges etc ., dismantling, fabrication & erection of dorr coils (nipple/flange/ reducer rates as per general fabrication, erection rates ), dismantling, fabrication & erection of dorr compartment shell with ms plate 8mm, channel & angles. the erection work for this job will also include all connections which are dismantled during dismantling., dismantling, fabrication & erection of dorr compartment /chamber roof with ms plate 8mm, channel with angles supports. the erection work for this job will also include all connections which are dismantled during dismantling., dismantling fabrication and erection of base plate of mud boot of dorr to make it leak proof., steam entry jacket
Tender For corrigendum : providing of custom bid for services - removal of sludge from pickling plant at sstp bhel trichy-pickling plant process sludge removal and disposal- 1. work permit shall be obtained from the concerned executive in-charge for carrying out the cleaning work before starting work. 2. phosphate bath will be handed over for cleaning after pumping solution to holding tank by cmp/sstp. as the sludge will tend to get dried and solidified, cleaning activities shall be commenced immediately after draining bath. 3. phosphate sludge present in the bath shall be thoroughly removed and collected in barrels / boxes without spillage on floor. contractor shall coordinate with maintenance dept. for fabricating boxes/barrels. 4. phosphate sludge filled barrels shall be moved to covered shed identified for storage with the help of vehicle and dumped on the floor. contractor shall bring vehicle for movement of barrels without spillage on floor. sludge removal/movement shall be completed on the same day itself as the chemical is to be stored in covered shed only. contractor has to ensure required manpower to complete the work as per schedule given by cmp/sstp. 5. contractor has to inform no. of barrels being moved to cmp/sstp for documentation purpose. 6. sedimentation pit will be handed over for cleaning after pumping water to recycling pit by cmp/sstp. as the sludge will tend to get dried and solidified, cleaning activities shall be commenced immediately after draining pit. 7. sedimentation sludge present in the pit shall be thoroughly removed and collected in tanks/boxes without spillage on floor. contractor shall coordinate with maintenance dept. for fabricating tanks/boxes. 8. sedimentation sludge filled tanks/boxes shall be moved to identified area/pits for storage with the help of vehicle and dumped into the pit. contractor shall bring vehicle for movement of tanks/boxes without spillage on floor. sludge removal/movement shall be completed on the same day itself as the chemical is to be stored in identified area only. contractor has to ensure required manpower to complete the work as per schedule given by cmp/sstp. 9. contractor has to inform no. of tanks/boxes being moved to cmp/sstp for documentation purpose. 10. the contractor shall provide all safety devices and personal protective equipment to their workmen at their own cost and shall ensure that their workmen wear such ppes (rubber gloves, leather gloves, respirator, apron & cum boot) while doing the work and there should not be any relaxation on this
Tender For procurement of various items for instrumentation works - procurement of various items for instrumentation works, multi core tube ss316l,tube 8mm od,wall thick 1mm, no of tubes 2 with colour code.outer sheath-pvc black colour&meindividual tube is pvc sheathed in a different color. outer sheath: oil & sea water resistant, weather proof, flame retardant, corrosion and acid resistant pvc, certification required: dnv gl, abs, lrs and bv etc, pressure rating: 180bar, marine approved, delivery period: 30 days, multi core tube, multi core tubess316l,tube 8mm od,wall thick 1mm, no oftubes 4, with colour code.outer sheath-pvcblack colourindividual tube is pvc sheathed in a different color. outer sheath: oil& sea water resistant,weather proof, flame retardant, corrosion and acid resistant pvc,certification required: dnvgl, abs, lrs and bv etc, pressure rating: 180bar, marine approved,delivery period: 30 days, multi core tube, multi core tubess316l,tube 8mm od,wall thick 1mm, no oftubes 6, with colour code.outer sheath-pvcblack colourindividual tube is pvc sheathed in a different color. outer sheath: oil& sea water resistant,weather proof, flame retardant, corrosion and acid resistant pvc,certification required: dnv gl, abs, lrs and bv etc, pressure rating: 180bar, marine approved,delivery period: 30 days, heat shrinkable boot for 8 od, 2 core multicore ss tube, heat shrinkable boot for 8 od, 4 core multicore ss tube, heat shrinkable boot for 8 od, 6 core multicore ss tube, ss male stud coupling assembly 1/4" bsp tosuit 8mm od pipe, pressure rating: 180bar, ss male stud coupling assembly 3/8" bsp tosuit 8mm od pipe, pressure rating: 180bar, straight union with nut and ferrule suitto 8mm od pipe, pressure rating: 180bar, ss hermetto equal tee to suit 8mm od sspipe, pressure rating 180 bar, straight bulkhead weld fittings, heavyduty, 8mm od tube, pressure rating: 250 bar