Web Analytics Made Easy - StatCounter

Chutes Tenders

Get complete information related to latest Chutes Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Chutes Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Chutes Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43289309 Due date: 12 Jan, 202612 Jan, 2026 68.55 Lacs
Tender For corrigendum : dismantling of old and damaged plates of chutes feeders at rls bocp fabrication erection of all iron and steel structures in chutes feeders at rls bocp replacement of damaged drums in c4 c5 c6 c7 conveyors replacement of bearings and sleeves of d

Central Government/Public Sector

CTN :43458887 Due date: 16 Jan, 202616 Jan, 2026 1.41 Lacs
Tender For replacement of mother plates and liner plates of unit no. 504-3 feeding chutes and its by-pass chutes of rom section at madhuban coal washery under block-ii area, bccl

State Government

CTN :42781343 Due date: 14 Jan, 202614 Jan, 2026 NA
Tender For corrigendum : supply installation commissioning and testing of 4 tph fully automatic rice mill colour sortex 5 chutes air compressor 22 kw - supply, installation, commissioning and testing of 4 tph fully automatic rice mill, colour sortex 5 chutes (3 tph), air compressor 22 kw

Central Government/Public Sector

CTN :43387823 Due date: 09 Jan, 202609 Jan, 2026 4.66 Lacs
Tender For upkeepment of 03 nos. belts and associated, chutes and feeders of loading section at madhuban nlw coal washery under block-ii area, bccl.

Central Government/Public Sector

CTN :43379989 Due date: 14 Jan, 202614 Jan, 2026 NA
Tender For custom bid for services - operational enabling activities in chp of cob#1-5 complex; 1) section operational activities in tippler for running shifts scope of job involves 1. wagons are to be placed in md1 (for tippler#1) and md2 (for tippler#2) t hrough a capstan winch (maximum 7 wagons) by means of hook fixing, deco upling, and winch operation, after placement of wagons by the traffic dep artment, for unloading in both tippler#1 and tippler#2. 2. after tippling, the empty wagons shall be shifted to a safe distance fro m tippler#1 and tippler#2 with the help of the empty side winch. 3. the first empty wagon on the empty side shall be decoupled and then co upled with the subsequent empty wagon pushed from both tippler#1 and ti ppler#2. the process of decoupling and coupling with the subsequent wag on shall continue until the completion of wagon unloading in both tipplers. 4. checking and cleaning of all underground equipments like (raf1 &raf2), belt conveyors, chutes and pitpumps at the beginning of each shift and per iodically to avoid any breakdowns. 5. periodical checking and cleaning of chutes during unloading from tippl er section to coal yard. 6. gate changing and diversion of belt routes as rquired for operation up to coal yard. 7. sample collection for labaratory purpose as per instruction of executi ng officer/chargeman. unit of measurement is "each". each is defined as the scope of job mentione d done in tippler section of old coal handling plant of coke ovens in a day, 2) scope of job involves 1. checking and cleaning of all belt conveyors, chutes, weigh feeders, and pit pumps of the blending section in both mt and expansion side shall be ca rried out at the beginning of each shift and periodically during the shift t o avoid chute jamming and ensure proper coal feeding to the service bunke 5 / 25 rs. 2. close monitoring of the discharge from weigh feeders shall be ensured as per the prescribed blend ratio, and air blasters shall be operated imme diately in case any weigh feeder is not discharging. 3. blending has to be stopped if any of the weigh feeders is not dischargin g even after operating air blasters and the same to be informed to concer ned shift incharge. 4. checking and cleaning of all belt conveyors, chutes and trolleys of all the service bunkers at the beginning of shift and periodically. 5. operation of trolleys of the service bunkers and communicate with elbd s after positioning of trolley for coal feeding. 6. gate changing and diversion of belt routes of service bunker s as rquir ed for operation. unit of measurement is "each". each is defined as the scope of job mentione d done in blending section in mt & expansides of old coal handling plant o f coke ovens in a day. the jobs are continuous in nature and shall be carried out round-thecloc k in three running shifts (a,b &c) the tenderer shall take up all works whi ch are specifically mentioned as per requirement in special terms and cond itions and also all facilitating activities which are necessary to maintain and ensure normal production..

State Government

CTN :43336702 Due date: 10 Jan, 202610 Jan, 2026 NA
Tender For work of replacement of flap gate of transfer chutes and replacement of wagon tippler grills in chp 3x660mw, ktps koradi

CTN :43194254 Due date: 10 Jan, 202610 Jan, 2026 NA
Tender For poking of ash silo unloading telescopic chutes for smooth unloading of ash under ahp-mm, bktps
 Loading, Please wait...

Connect us via What's Up