Get complete information related to latest Civilwork Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Civilwork Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Civilwork Tenders.
Tender For providing of custom bid for services - annual maintenance contract for two nos. avery makes road weigh bridges including unmanned system (smart tower) for both weigh bridges installed at permanent ash pond, dvc, btps
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; civil maintenance and repair works in plants and ash pond area htps; service provider
Tender For corrigendum : hiring of movable water fogging machine mounted on tractor truck or equivalent vehicle having throw of 20 to 25 m for dust supression at ash dyke phase- iii pond no 1and2 having total area of 20.715 hectare at atps mppgcl chachai
Tender For corrigendum : rtpp - stage-iv(1x600mw) - o&m - removal and disposal of ash ,silt, debris from stage iv boiler ,ash plant, ptp and dm plant, c w pump house areas and drains, leading drains to guard pond for the year 2026-27.
Tender For corrigendum : ktps-v vi stages- civil- environment- amc- environmental monitoring effluent water analysis for ash pond, plant effluent, ambient air quality monitoring as per naaqms (12 parameters), stack emissions monitoring (spm, so2, nox, co, co2, mercury) drinking water analysis for the year 2026-27
Tender For providing of custom bid for services - annual maintenance of two nos avery make road weigh bridges including unmanned system smart tower for both weigh bridges installed near ash pond at dvc ctps
Tender For corrigendum : construction of rcc road from the piyala gate to current concrete pavement adjacent to ash pond gate, extending to the concrete box culvert located near chp control room.job no. 947/dpps.
Tender For ktps-vii stage-civil-o and m-iii-ash pond-arranging water sprinkling with water tankers on top surface of northern ash pond i and ii to avoid fugitive emissions of ktps-vii stage for the fy 2026-27 and as and when required.