Tender For corrigendum : supply, installation, testing, commissioning and proving out of cnc atl (axle turning lathe), as per specification no. blw/nws/2025/a2/schedule i (rev.0) on turnkey basis. (warranty period of the machine will be 24 months from the date of commissioning as per para 17.0 of the attached specification part-i) ]
Tender For supply, fitment and prove out of set of tool holder (left hand and right hand) with facing and turning cassettes for both rhs and lhs suitable for cnc surface wheel lathe widia vide part/drawing no. lhs: 60899658 and rhs: 60894196 with facing and turning cassettes 69 393 221 10 and 69 393 186 10 respectively, consisting of 05 sets and quantity 30 nos. and supply, fitment and prove out set of tool holder with cassette and sim for cnc axle turning lathe and vtl machines consisting of 03 items of widia code no. psbnl. 3232. p19, pdjnl 2525 mi5, mtjnl. 3232 p22, consisting of 10 sets and quantity 30 nos, make widia. [ warranty period: 30 months after the date of delivery ]
Tender For supply, installation, testing, commissioning and proving out of cnc atl (axle turning lathe), as per specification no. blw/nws/2025/a2/schedule i (rev.0) on turnkey basis. (warranty period of the machine will be 24 months from the date of commissioning as per para 17.0 of the attached specification part-i) ]
Tender For camc atl_asker_2081 - comprehensive annual maintenance contract of cnc axle turning lathe (atl), scr/lgd/m&p no. 2081 make m/s.askar microns / mysore, for a period of 03 years, at carriage workshop lallaguda, secunderabad
Tender For corrigendum : camc atl_asker_2081 - comprehensive annual maintenance contract of cnc axle turning lathe (atl), scr/lgd/m&p no. 2081 make m/s.askar microns / mysore, for a period of 03 years, at carriage workshop lallaguda, secunderabad
Tender For supply, installation, testing, commissioning and proving out of cnc atl (axle turning lathe), as per specification no. blw/nws/2025/a2/schedule i (rev.0) on turnkey basis. (warranty period of the machine will be 24 months from the date of commissioning as per para 17.0 of the attached specification part-i) ]