Web Analytics Made Easy - StatCounter

Co2 Flooding Machine Tenders

Get complete information related to latest Co2 Flooding Machine Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Co2 Flooding Machine Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Co2 Flooding Machine Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government / Public Sector

CTN :38191841 Due date: 26 Nov, 202426 Nov, 2024 29.10 Lacs
Tender For annual maintenance contract including supply of spares for fire fighting engines at wrpl chaksu - gst rate for item no. 3.0 to 10.0, amc ff engines- service items, amc (monthly maintenance charges): monthly maintenance charges for maintenance of fire fighting engines of greaves (model: tbd4i v 12 rc, 07 numbers) at iocl, chaksu pump station, deployment of required manpower, tools and tackles including personal protective equipment for the manpower deployed at site, testing equipment, all transportation,all labour etc., carrying out routine, preventive maintenance of equipment as per sound engineering, oem recommendations, operating and maintenance practices, and directions of eic. note: unit "mon" shall be treated as one month; monthly, quarterly, half yearly, yearly maintenance as per schedule of oem are to be carried under this item. (total 07 visits per month), minor breakdwon maintenance: attending minor breakdown in the engines on call basis. this item includes deployment of required manpower, tools and tackles including personal protective equipment for the manpower deployed at site, testing equipment, all transportation,all labour etc., to attend the breakdown problem within shortest duration. note: spares/ consummables etc if any will be provided by iocl; payment will be made on per engine per breakdown basis., repair & maintenance of radiator: dismantling, cleaning, inspection, repair & maintenance including arresting of coolant leakages, hydrotesting & reinstallation of radiators of fire fighting engines of greaves cotton make (model: tbd4i v 12 rc) including all tools & tackles, machining etc. complete in all respect as per direction of eic/site engineer.note: payment will be made on per radiator basis., calibration of fuel injectors of diesel engine of greaves cotton (model tbd4iv12) from authorized workshop inclusive of consumables, labour charges, transportation etc. as per direction of eic/site engineer., overhauling & calibration of fuel injection pump (fip) of diesel engine of greaves cotton (model tbd4iv12) from authorized workshop inclusive of consumables, labour charges, transportation etc. as per direction of eic/site engineer., major overhauling of diesel engine of greaves cotton (model tbd4iv12) including dismantling of engine parts like fuel injectors, cylinder heads, fuel injection pump, piston-cr assembly, liners, turbochargers, main bearings, lube oil pump, cooling water pump etc. cleaning & refitting/replacement of faulty engine parts as per direction of eic/site engineer. required spares shall be supplied by iocl.note: load trial of the engine to be carried out for 04 hours prior to handing over the engine, repairing & reconditioning of cylinder head of diesel engine of greaves cotton (model tbd4iv12) including replacement of faulty parts like valves, valve sheets, valve guides, springs etc. work includes labour charges, transportation etc. complete in all respect as per direction of eic/site engineer., gst rate for item no. 12.0 to 19.0, amc ff engines- composite items, supply & installation of spares for carrying out preventive/breakdown maintenance of diesel engine( make: greaves cotton, model: tbd4 v12) note-spares shall be genuine spares of oem and shall be procurement from m/s greaves cotton or its authorized dealer., cylinder head assly d4i (part no. 123501800036), turbo charger reparing kit (part no. 106907210008), seal dia 25 lngth 16.5, (part no. 104961500008), seal dia 17.5 lng 15.5, (part no. 104961500009), ring set piston d4i 132dia (part no. 123400191357), liner for d4iv12 (p/n: 123501320044), gst rate for item no. 21.0 to 27.0, amc ff engines- composite items, supply & installation of spares for carrying out preventive/breakdown maintenance of diesel engine( make: greaves cotton, model: tbd4 v12) note-spares shall be genuine spares of oem and shall be procurement from m/s greaves cotton or its authorized dealer., turbo charger assly j92 (part no. 1

CTN :38069650 Due date: 26 Nov, 202426 Nov, 2024 NA
Tender For repair and overhauling service - short refit of in asset com 0995 sdp sr o l 25 a; any other suitable brand; no; buyer premises, service provider premises-dock bed preparation including marking, block placement, rigging up of centrelines and preparation of wooden keel/shape blocks as per docking plan. (a) the firm is to provide manpower for rope handling for docking/ undocking of slave dock pontoon as per docking schedule. (b) normally, one docking is envisaged. secord docking is catered to address exigencies, if any arises or to cater for operational requirements (c) cost of additional docking/ undocking operations of the pontoon, emerging due to delay in refit attributable to the contractor, is to be borne by the contractor. (d) fire sentry with portable fire-fighting appliances as well as physical security of contractor items/ material during dry-docking/ refit period are to be catered by the contractor. item no 1 2.00 nos 1.0002 002 cleaning of underwater hull post docking, external hull surface of the pontoon to be cleaned by high pressure fresh water jet washing (3000 psi) immediately after docking. item no 2 1950.00 sq.m 1.0003 003 provision of scaffolding, positioning and staging for undertaking survey, renewal/ repairs, surface preparation and painting of sdp. nb: (a) the principles dimensions of the pontoon are as follows:- size of slave dock pontoon 86m(l) x 16m(b) x 2.8m(h) (b) scaffolding material will be provided by nd(v) item no 3 1500.00 cum 1.0004 004 (a) undertake visual survey of all structural members including complete external hull surface, weather deck, access ladders and all internal tanks, manhole covers and deck fittings. item no 4 15000.00 sq.m 1.0005 004 (b) usg survey is to be undertaken for the suspected areas as per recommendations of class society (to be paid on actual). item no 5 5000.00 sq.m 1.0006 004 (c) hull survey and action taken reports is to be approved by any one of the in approved classification society (abs/bv/dnv/irs/classnk/lr/rina). nb:- (a) surveys are to be undertaken through qualified inspection services provided firm, recognised by any one of the in approved classification society, as indicated above. (b) renewal of corroded/ damaged areas to be recommended through survey i.a.w class standards or no 01/15. ndt, post repairs, to be undertaken as per class society norms. (c) tanks repaired by build-up/renewals are to be air pressure tested. (d) usg gauge and all associated equipment for survey to be provided by firm. robotic survey methods may be used by the contractor to save labour and time. (e) all deck fittings to be surveyed, repaired and load tested where considered necessary as per class standards. (f) all manholes to be inspected and repaired to ensure water tightness item no 6 1.00 set 1.0007 005 metal built ups to be carried at indicated location i.a.w class standards or no 01/15 requirements. nb: (a) build up followed by fairing by grinding to be undertaken. (b) to be undertaken as per survey report (to be paid as per actual work done) i.a.w class standards or no 01/15. item no 7 100.00 sq.m 1.0008 006 scantlings/ hull structural renewal of corroded/ damaged areas as per survey. nb: (a) renewal to be undertaken as per class standards or no 01/15. (b) to be undertaken as per survey report (to be paid as per actual work done) (c) ndt/ dpt is to be undertaken for renewal areas. (d) material is to be catered by the vendor item no 8 10.00 tonnes 1.0009 007 air pressure testing (apt) to be undertaken for all tanks/ chambers as per class standards to prove wt integrity post repairs as indicated at note- 4(b) above (to be paid on actuals). nb: (a) all equipment/ set up (including temporary fixures and their removal after test) are required to be catered by contractor. (b) pressure test:- (i) a test pressure of 150 mm water gauge is to be applied and pressure source isolated. the pressure drop if any, should then be monitored. (ii) any drop in water gauge reading should not ex
 Loading, Please wait...

Connect us via What's Up