Tender For corrigendum : work of chute puncture and coal leakage attending work in various locations by patch work and repairing of transfer chutes/structure of various conveyor system in coalhandling plant, wtps
Tender For providing of custom bid for services - structural stability testing and ndt of coalhandling plants of nehariya ug and urdhan ocm, surface haulage and strata bunker of nehariya ug mine
Tender For tggenco ytps 5x800mw clearing of hopper jams of track hopper, wagon tippler, raw coal erh and stock yard erh, various erhs grid cleaning, chute jams of tp21, tp22, rtp3, rtp4, ch22, tp23, tp24, tp7, tp8 and belt jams pulley jams of their respective conveyors and fire quenching at stock yard 1,2,3 for smooth facilitation of coal feeding activity to unit bunkers and any other coal clearing works as instructed by engineerincharge for a period of 60 days from actual date of commencement during fy 2026 27 at coalhandling plant in yadadri thermal power station at veerlapalem v, dameracherla m, nalgonda d
Tender For tggenco ytps chp mmii complete mechanical maintenance of wagon tippler 3 and 4, sidearmchargers 3 and 4, apron feeders, dribble conveyors, track hopper 2,paddle feeders, stacker 2 and 3,reclaimer2,sump pumps, compressors and connected equipment of stage ii in coalhandling plant in priority path of stage ii ytps 5x800mw from 01 04 2026 or actual date of commencement to 61 days
Tender For complete mechanical maintenance in priority path of stage-ii coalhandling plant including periodical emergency breakdown maintenance in ytps
Tender For providing of handling ,transport and other mining services - percentage quote based - handling & transport service, crushing, loading and transportation of coal at ukni deep ocm of wani north area
Tender For various miscellaneous works pertaining to stage-i&ii/chp which includes quenching of fires, clearing of chute jams, cleaning of the stagnated wet coal and its coal boulders at wagon tipplers-1 to 4 on emergency basis and charges for movement of load wagons from railway siding to wagon tipplers-1 to 4 and formation of empty wagons and return to railway siding, pertaining to operation division/stage-i&ii /coalhandling plant /dr. nttps as and when required during the period from 01.04.2026 or from the date of commencement of work to 30.09.2026 or till exhaust of quantities.