Get complete information related to latest Coating Materials Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Coating Materials Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Coating Materials Tenders.
Tender For corrigendum : emergent repairing work of mending potholes by pre-coatingmaterials for the jurisdiction of kalyani highway sub-division of nadia highway division no. ii, p.w(roads) dte during the year 2025-2026
Tender For supplying items for the new integrated high court complex at bandra government colony, cts no. 629/1234/a, bandra (east), mumbai. - all concrete should be admixed with integral hydrophilic crystalline admixture (16bars) reputed makes like bulwark. taskmek, grace or equivalent for reducin permeability by more than 85% when tested as per din 1048 part 5 (after applying cycles of hydrostatic pressure), for self-healing of cracks up to a width of 0.40 mm, for reduced sulphate attack and for high early strength of concrete etc. this should meet the requirements specified in the recommended dosage rate of 1% complete as per manufacturers specifications to the entire satisfaction of engineer-in-charge. hydrophilic crystalline admixture shall also have a corrosion inhibitant property and shall be compatible with any other water reducing concrete chemical admixtures added to concrete for workability purpose. crystalline formation shall be mix of cylindrical & circular in shape to have maximum filling of pores the admixture used shall have manufacturers test reports and approval mandatorily both from iits and irc (indian road congress). approved makes: pidilite/ technonicol/ myk/ mapei, providing & applying 2 components, solvent free, liquid applied elastomeric seamless hybrid polyurea polyurethane membrane, using high pressure plural component spray equipment, to form a minimum system thickness of 1.5 mm in two or more passes with a total consumption of 1.5-1.6 kg / m2. the membrane shall have 100% solids, voc free, tensile strength > 15 mpa as per astm d 412, elongation > 450% as per astm d 412, low temperature crack bridging ability of 3.2mm as per astm c 1305, shore a hardness > 85 astm d 2240, puncture resistance > 1000 n as per astm e 154, water head resistance > 7 bar as per astm d 5385.the coating should pass dynamic crack bridging as per en 1062-7, method b for 20,000 cycles at -20 degree temperature. the membrane shall exhibit 25 years of service life tested and complied in accordance with en 13251:2016 durability certification. apply primer coat of epoxy primer by roller/ airless spray guideline and coverage @ 5-6 m2/ltr depends on porosity of concrete. allow to cure for max 5-6 hours. broadcast anti slip grains of 200-300 micron (dried sand) on wet primer at coverage of 0.8-1 kg/m2 and allow to come to touch dry condition before application of membrane. approved makes: pidilite/ technonicol/ myk/ mapei, supplying and installing 1.5 mm composite thick fully bonded weldable hdpe membrane conforming to is 16471:2017 requirements of ug waterproofing structures, requirements to provide type a fully bonded protection of ug waterproofing structures. the membrane shall exhibit 25 years of service life tested and complied in accordance with en 13251:2016 durability certification. the membrane should be minimum 2.4 m wide comprising of an hdpe layer and a pressure sensitive adhesive layer which is covered by a weatherproof protective layer with lap joint strength at overlaps >15000 n/m astm d 6392:2012. the membrane shall have minimum of 100 mm side and end laps which shall be thermos fused with leister machines at all the joints for assuring watertightness and achieving monolithic membrane. end laps and side laps should be a minimum of 100 mm with double weld system, comprising of two parallel welds of 15 mm wide each with a 20 mm air channel gap in between the two weld lines. the size of the membrane should not be less than 2.4 mtr. x 20 mtr. to minimize the joints. this membrane shall be continued over the vertical surface but terminated minimum 100mm below the top edge of the raft slab/footings and fixed as per recommendation. the hdpe membrane should have the below mentioned technical properties- 1) lap joint(side and end lap) strength at overlaps 15000 n/m astm d 1876 2) resist hydrostatic pressure of 70 m head of water as per astm d5385 3) puncture resistance of 1000 n as per astm e1544) peel adhesion to concrete of 150
Tender For rrsmp/25-26 barsoi/05 - bangali tola to pmgsy road, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, ro
Tender For rrsmp/25-26 purnea/04 - bishu baba sthan(hanuman mandir ) to adiasi tola karwa rahika, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the requ
Tender For rrsmp/25-26 purnea/06 - puran shah to farkiya hat (harijan tola), clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and
Tender For rrsmp/25-26 purnea/05 - fasia chowk to barhari sima ( seikh tola), clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., excavation in soil using hydraulic excavator and tippers with disposal upto 1000 mexcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3, construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technic
Tender For rrsmp/25-26 purnea/01 - pakka road to adiwasi tola, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, ro
Tender For supply of 081141 uncemented total hip replacement prosthesis with dual mobility liner , 081146 uncemented femoral stem comma proximally porous coated comma tapered with compatible head , 081159 uncemented acetabular component with porous surface coating comma cluster hole or multihole options , 081186 fixed bearing unicondylar knee system , 081187 mobile bearing unicondylar knee system , 081192 posterior stabilized modular knee replacement prosthesis comma cemented medial pivot , 081194 posterior stabilized total knee prosthesis comma cemented hypoallergic coatingtibial base plate with different compatible sizes , 081195 high performance posterior stabilized total knee prosthesis , 081196 posterior stabilized cemented total knee replacement prosthesis with tibial stem extension , 081199 cruciate retaining total knee prosthesis comma medial pivot , 081200 cruciate retaining total knee prosthesis comma high flexion mobile bearing tibial base plate with different compatible sizes , niv6771 saw blade for stryker oscillating saw 1 point 27 mm x 19 point 5 mm x 86mm , niv6772 saw blade for stryker oscillating saw small , niv6773 saw blades for stryker oscillating saw 1 point 27mm x 24 point 5 mm x 86 mm with dual cut , niv6790 saw blade for conmed saw system broad conmed , 081347 oscillating saw blade , 080856 bone cement antibiotic loaded 40 gm , 081343 low viscosity bone cement with antibiotic 40 gm , 081148 cemented femoral stem highly polished ) /bid number : gem/2025/b/6361303 * /dated: 22-07-2025 & & / bid document 1 / 21
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-146; h119 01 in no butter fly valve deteriorated and continuous water leakage observed on port quarter deck same to be replaced renewed as per sample and system t..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-146; h120 water seepage observed in work station and ward room view frp coating of soft patch area on flag deck cracked existing frp coating to be removed surface..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-146; h121 01 in no rubber mat deterioted in ships galley to be renewed replaced as per sample rubber mat required to avoid direct connection of operator in case o..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-146; h122 kill card holders to be fabricated as per nbcd policy in vogue and bst observation mat wood transparent acrylic sheet qty 30 nos size 1x1 feet; service ..
Tender For supply of two component self priming surface epoxy primer gray shade as per attached technical specifications , two component high solids acrylic aliphatic polyurethane finish coating color shade as per is-5- eau-de-nil 216 as per attached technical specifications , two component high solids acrylic aliphatic polyurethane finish of color shade as per is-5-french blue shade 166 as per attached technical specifications , two component high solids acrylic aliphatic polyurethane finish of color shade as per is-5-a.c.grey shade 693 asper attached technical specifications , epoxy thinner compatible for surface tolerant epoxy primer coating , pu thinner compatible for acrylic aliphatic polyurethane finish coating , two component, high build, high solids heavy duty coal tar epoxy coating with good abrasion and corrosion resistance for internal lining of sea water pipes as per attached technical specifications , epoxy thinner compatible to heavy duty coal tar epoxy coating , water based rust converter of marine grade as per following technical specifications