Get complete information related to latest Composite Pipe Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Composite Pipe Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Composite Pipe Tenders.
Tender For corrigendum : supply of one set of compositepipes and fittings for spicac coaches. one set consists of: 1) compositepipe 2025 to is: 15450-2004 # 4.5 metres 2) male stud connector 2025 x 3/4 inches bspt to is:15450-2004 annexure-a - 3 nos [ warranty period: 30 months after the date of delivery ]
Tender For supply of new repairing item, sarvjanik handpump/nal/pipeline for year 2026-27 at the office of municipal council pipariya dist. - narmdapuram mp
Tender For corrigendum : supply of male thread connector size 32 x 40 mm for 1.5 inch suitable to fit pe-al-pe compositepipe is: 15450-2004) as per rcf drawing no. le63224 alt.-a. [ warranty period: 30 months after the date of delivery ]
Tender For providing of facility management services - lumpsum based - supply of pipeline leakage repairing material; bid for all items (single item can not be consider); consumables to be provided by service provider (inclusive in contract cost)
Tender For tender for item rate contract for a period of 1-year for laying of underground pe pipeline and aboveground gi / cu installation for cgd network of mngl for pune ga
Tender For set of pipeline holding clamp/clips(10mm, 20mm, 25.4mm) as per els/bza drawing no. b/trs/pn.eqpt/3/198, ref. nos. 04, 07 & 08 in table-a(quantity = each one number for reference items) or latest if any. note: one sample of each item should be got approved before effecting bulk supply. [ warranty period: 30 months after the date of delivery ]
Tender For tender for item rate contract for a period of 1-year for laying of underground pe pipeline and aboveground gi / cu installation for cgd network of mngl for sindhudurg ga
Tender For tender for item rate contract for a period of 1-year for laying of underground pe pipeline and aboveground gi / cu installation for cgd network of mngl for nanded-parbhani-buldhana