Web Analytics Made Easy - StatCounter

Conveyor Structure Spares Tenders

Get complete information related to latest Conveyor Structure Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Conveyor Structure Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Conveyor Structure Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43898937 Due date: 23 Feb, 202623 Feb, 2026 3.27 Lacs
Tender For corrigendum : supply of knife guard,spring tine,feeder angle,prong bush,blade sharp,rivet pin big and small,prong shaft,rasp bar lh and rh,reel tube holder,slip clutch set,counter sprocket 15 teeth 35mm bore,sprocket z 26teeth,sprocket z-22 35mm,sprocket z-10 30mm,sprocket z-9 35mm,supporting bracuel 35mm,feedes shaft 35mm,guide prum shaft,assembly shaft 30mm,drive shaft cam 30mm,chain feeder conveyor,elevator chain 38 pads,sprocket z-7 30 mm elevator chain set,guide drum sleeve,distributer,hydraulic pump make- mico or dowty,brake master cylinder,hydraulic pipe 21 inch,fuel pipe 24,clutch plate assembly with finger kit,stub axle,v belt pully 8 inch 30 mm bore,alluminium idle pully,o ring 5x132,o ring 3x75,sealing ring for air cleaner,ring,gun metal bush with pin,chain 48 link for straw walker,rubber bush big for feeder conveyor suppor,uc 207 bearing body 2 hole,uc 207 bearing body 4 hole,wooden block,hex head screw m 8x25 with nut,hex head screw m 8x40 with nut,hex head screw m 6x30 with nut,hex head screw m 10x30 with nut,hex head

Central Government/Public Sector

CTN :43861870 Due date: 20 Feb, 202620 Feb, 2026 11.36 Lacs
Tender For corrigendum : assistance required for dismantling of old drive heads of belt conveyor and fabrication, transportation and installation of new drive heads for five (05) nos. belt conveyor of kurja ug mine.

Central Government/Public Sector

CTN :43834876 Due date: 18 Feb, 202618 Feb, 2026 66.78 Lacs
Tender For supply of vishwa belt conveyor spares : : -1st stage pinion and gear in set with integral shaft 25 part no 11and 18c 150 12 , input shaft oil seal part no 09 55 08 , output shaft oil seal part no 35 55 08 , output shaft part no 38 55 08 , tandem drive driven drum part no 46 55 08 , 1st stage gear and pinion with integral shaft in set 25 part no 11 and 18 c 55 08 , hold back part no4 55 08 , input shaft bearing cover part no5 55 08 , input shaft bearing cap part no6 55 08 , 2nd stage gear and pinion with integral shaft in set part no 22 and 26 55 08 , 3rd stage gear and pinion in set part no 30 and 36 55 08 , 1st stage gear and pinion with integral shaft in set 25 part no 11 and 18 c 75 10 , equalizing gear in set of two nos part no 52 75 10 , complete tandem drive driven drum assly part no ca 46 75 10 , input shaft bearing cover part no 5 75 10 , hold back part no 4 90 10 , drive drum part no 46 37

State Government

CTN :43813431 Due date: 24 Feb, 202624 Feb, 2026 NA
Tender For supply of gear coupling, bush type flexible coupling and its accessories for conveyor belt drive system of coal handling plant of 500mw unit-6 at ukai tps. (chp maint. (mech.) et-6192)

Central Government/Public Sector

CTN :43777868 Due date: 19 Feb, 202619 Feb, 2026 1.44 Crore
Tender For supply of spares of btl make belt conveyor drive heads d d ? g? g - input shaft hold back cover, part no. 6255 , hold back end cap, part no. 6855 , input shaft bearing cap, part no. 2055 , input shaft oil seal, part no. 2255 , input shaft oil seal - hold back side, part no. 7155 , input shaft with integrated pinion and f, part no. 612655 , 2 nd stage pinion shaft and gear in set, part no. 353655 , second stage bearing cover, part no. 2755 , 3rd trage pinion and gear inset, part no. 464755 , 2nd stage intermediate shaft, part no. 4255 , 2nd intermediate shaft bearing cover, part no. 3855 , 3rd stage brg cover spacer ring, part no. 3755 , output shaft bearing cover, part no. 4955 , output shaft bearing cap, part no. 5155 , output shaft oil seal, part no. 5455 , output shaft, part no. 5555 , output shaft spacing washer, part no. 5755 , input shaft-hold back, part no. 6290 , hold back-end cap, part no. 6890 , input shaft bearing cap, part no. 2090 , input bearing cover spacing washer, part no. 2390 , input shaft oil seal coupling side, part no. 2290 , input shaft oil seal-hold back side, part no. 7190 , input shaft with intigrated pinion and gear, part no. 612690 , 1st stage intermediate shaft, part no. 3190 , 1st stage intermediate shaft bearing cov, part no. 2790 , i st stage intermidiate shaft bearing co, part no. 2990 , 2nd stage pinion shaft and gear, in set, part no. 353690 , 2nd intermediate shaft bearing cover, part no. 3890 , 2nd stage intermediate shaft, part no. 4290 , 3rd stage pinion and gear, in set, part no. 464790 , out put shaft bearing cover, part no. 4990 , out put shaft bearing cap, part no. 5190 , output shaft oil seal, part no. 5490 , out put shaft, part no. 5590 , geared coupling, mechanical coupling, part no. gc90 , equalizing gear in set, 2 nos. , part no. g067590 , complete tandem drive drum assy 650mm, part no. g0710dr , hold back 2x90 kw 1000mm belt conveyor -, part no. gb65 , fluid coupling, part no. g0390 , input shaft with integrated pinion and 1, part no. 6126110 , input shaft oil seal-hold back side, part no. 71110 , input shaft oil seal-coupling side, part no. 22110 , output shaft oil seal, part no. 54110 , equalizing gear set, part no. g06110
 Loading, Please wait...

Connect us via What's Up