Get complete information related to latest Cooler Assembly Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cooler Assembly Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cooler Assembly Tenders.
Tender For tender for supply of pneumatic (air) starter , thermo element exhaust temp a bank after turbo , thermo element lo temp measuring , electrical heating element engine pre heating , 3p contactor 9a , 380v a/c 50hz , thermo transmitter exhaust b bank after turbo , pressure element cwp measuring , termo element cooling water temperature(323.805/001/004) , pressure meter 0-40 bar , pressure transducer , starting air , pinion and drive shaft , alternator pre-heating element , voltage control relay , thermo element exhaust temp b bank after turbo , pressure element lub oil pressure measuring , speed tachometer , f/i converter with level relay out put , pressure switch low pressure warning , buffer metalastik , pressure switch low lub oil pressure warning , pressure switch low start air press warning , pressure meter , alarm annunciator , tacho voltage detector u7 , pressure meter , pressure meter , engine control unit , cylinder head gasket (seal ring) , temperature meter , 2p aux relay 5a , 24vdc , 2p circuit breaker 10a , temperature meter , pressure switch , level switch lcwt warning , level switch cool water leak warning , termister control relay , temp switch high lub oil tem warning , temp switch engine pre heating on/off , temperature meter , temp switch hcwt shut down , temp switch hcwt warning , resister 3k3 1w (214-1210) , resister 120k 1w
Tender For corrigendum : supply, installation and commissioning of various equipments and consumable items for multi disciplinary research unit at government medical college and hospital dungarpur - dna / rna sequencer, single micropipette set with stand/pipets set manual single channel:0.1-0.3ul0.1-2.5ul0.5-10ul2-20ul5-50ul10-100ul20-200ul100-1000ul, multichannel pipette with suitable stand:- 0.5-10 ul- 10-100 ul- 30-300 ul, dry bath, deep freezer -20 degree celsius upright, refrigerated high speed centrifuge, refrigerated microfuge, double door refrigerator (2 - 8 degree centigrade), vortex mixture, microcentrifuge, fluorometric quantification system, magnetic separator, thermoblock (heating/cooling/mixing), refrigerator -80 degreecelsius , general laboratory incubator, electronic balance, ph meter, hot air oven, microwave oven, laboratory centrifuge, desktop pc (for data analysis and research work), desktop pc (for office use), printer (all in one, color printer), statistical software
Tender For nctps i operation ca dn cwph unit i overhauling of air release valves and their isolation valves in cwp discharge line of unit i removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tunnel works duri
Tender For supply of 1.5t 5 star split ac including green ac nominal marketing capacity as per bee sta r rating label (in ton): 1.5, technology of air conditioner :inverter ac variable speed, iseer (wh/wh) value s for compliance of green ac: not applicable for non green ac, rated voltage (in volts): 230 v, 1 phase, 50 hz, ac, unit mounting arrangement :indoor unit wall mount type, air conditioner compliance : ac, bee star rating of the product : 5, classification by function : cooling & heating (cooling and dehumidification during cooling mode), material of evaporator :copper, material of condenser :copper, ac machine warranty (in ye ars) :1, warranty on compressor (in years) :10 (for inverter ac)up to including 2 ton capacity, rated coolin g capacity (in watts) as peris:1391(part 2): 4750-5800, split air conditioner: conforming to is:1391 (part 2) latest, eco-friendly refrigerant: yes, refrigerant designation: r 32, refrigerant global warming potential (g wp): 675 (for r32), refrigerant ozone depletion potential is zero: yes, classification by function: cooling an d heating (cooling and dehumidification during cooling mode), heating capacity (in watts): 4750-5800, unit type: single split ( single indoor and single outdoor), compressor type: single split ( single indoor and sing le outdoor), compressor type: rotary type/dual or twin, material of evaporator: copper, material of conde nser: copper, material of air filter (on indoor unit): synthetic fibre, reusable air filter: yes, ac modes: turb o mode, auto clean mode, quiet mode, dry mode, eco saving, swing, timer, remote control features: time r ,fan speed control, on/off, additional features: sleep mode, auto off, auto restart, indoor temperature indicator, dust filter, auto air swing, virus deactivation technology,4 way auto air swing, nanotech coatin g on evaporator tubes, noise level: as per is:1391 (part 2) latest, environmental friendly paint: yes (paint does not contain heavy metals or their compounds include mercury(hg), lead (pb), cadmium (cd) and hexa valent chromium (cr), recycled plastic components: >80% by weight of total plastic components in produc t, marking on the split ac: as per cl.17.1.1 and as per cl.17.1.2 of is:1391 (part 2), mode of packing: packe d with recycled and biodegradable material, supply cord and the inter connecting cord between the indoor and outdoor unit: 1 m (pvc insulated sheathed cables as per is:694), accessories / installation kit with each split air conditioner: 3m cu connecting pipe (for wall mount type up to 2 ton),remote control, operating m anual, installation manual, no installation kit, warranty card- ac machine warranty (in years): 1, warranty on compressor(in years): 10 (for inverter ac) up to including 2 ton capacity, availability of type test report from govt. lab/nabl accredited lab /ilac accredited lab to prove conformity of the specification: yes. as pe r is:1391 (part 2) latest, test report number and date - must declare: nabl, agreed to furnish all the test re ports and certificates to buyer on demand: yes. refrigerant pipe of min 3 meters including min connecting cable of 3 mtrs, drain pipe and suitable ms stand (powder coated) along with nut and bolt for fixing outdoo r unit. [ warranty period: 12 months after the date of delivery ]
Tender For supply of lhs cooler cacw as per drawing no. 14023140154 rev. 00, var. 00 , rhs cooler cacw as per drawing no. 14023140155 rev. 00, var, 00 , cacw cooler (coolerassembly) as per drawing no. 24023140025 rev. 03, var. 00 , cacw cooler as per drawing no. 34023540128 rev. 01, var. 00
Tender For annual contract for housekeeping and equipments cleaning at pps iii bawana - contract for housekeeping & equipments cleaning at pps-iii bawana for three months, clng entire flr area gt#1&2, dusting wall door window gt#1&2, washing flr gts&around, gt accries coment floor & encloser 1&2, dusting clng structural member gt#1&2, clng ent flr ar gt#1&2 air inl fil house, clng entire flr area sos 1&2 ,jop 1&2, clng entire flr area gcs 1& 2, clng entir road ,drain around gcs 1&2, dusting clng structurl membr gcs 1&2, clng entire flr area of et,pt,gbdpu, dust clng wall door win around pt,gbdpu, generator & gcb flr of unit#1 &2, clng entire flr area of exciaon room1&2, dust clng wall door win of exci room 1&2, cln enti flr area of hydn room 1&2,stg 1, dust cln wall dr wn of hyd rm gt1&2,stg1, clng entire flr area of dmcw & phe room, dust cln wall ,dr wind of dmcw & phe rm, cln enti(gtgt1&2&stgt#1)sat1&2, lt tr ar, clng entire flr area of package ac room, clng entire ground area dsb, dusting wall door window dsb, clng entire ground flr area hrsg i&ii, clng drains & roads around hrsg i&i, washing roads around hrsg i&ii, cln enti flr from gf to 3rd flr bfp bldg, clng drain & road around bfp bldg, cln ent flr ar stg hall bldg, mot&gd flr, dusting clng structural member stg hall, clng entire flr area of control room, dust cln cab wall dr wind of conl room, clng entire flr area of battery room, clng enti flr ar of cable gallery room, clng entire flr area mcc room, dusting clng structural member mcc room, clng entire flr area of nn100 room, clng entire flr area chiller room, clng entire flr area of lp co2 tank, cln toilet near by gas turbine, clng entire flr area comp house, dust clng door window., clng entire flr area of fire pump house, dust clng door window., clng entire areas of cwpp house, clng entire flr area rwr pp house, clng entire flr area gcs, clng entire flr area cooling tower &stai, gf flr i/c staircase upto ff flr, dusting clngs door window ceiling gf, 1st flr flr i/c staircase upto 2nd flr, dusting clng door window ceiling 1st flr, parking place and internal road, clean toilet, clng entire flr area gf, dusting clngs door window ceiling gf, clean toilet, clng gas turbine compartment, clng vent fan & its motor gt#1&2, cln gt accs compartment equipments 1&2, clng eqipts &pipe in so s1&2 ,jop 1&2, cln eqts &pipe gcs1&2(near gas turbine), clean bus duct & its support of gt#1&2, clng generator & gcb of unit#1 &2, clean dg set & fuel tank, cln auxs( pump, motors, pip, v/v etc), cln steam tur1& its associated aux ., clng stg 1 generator, exci encl,bus d, cln stg stm,oil,wt, pips on stgfr,motfr, cln ecw,acw,sos,vacm pp,cep mots ,v/v, clean compressor , pipe, v/v,dryers,tank, clean fire pump, motor, pipe,v/v, clean cw& acw pump, motor, pipe,v/v, clean raw water pump, motor, pipe,v/v, clean gcs (near gail terminal) eqts,v/v, clng lci enclosure from outside, clng entire flr area gt#3&4, dusting wall door window gt#3&4, gt acces compar floor&enclos3&4, washing flr gts&around, dusting clng structural member gt#3&4, cln enti flr area gt#3&4air filter house, clng entire flr area sos 3&4 ,jop 3&4, clng entire flr area gcs 3&4, clng entir road ,drain around gcs 3&4, dusting clng structurl membr gcs 3&4, clng entire flr area of et,pt,gbdpu, dust clng wal dr windo aroud et,pt,gbdpu, generator & gcb flr of unit#3&4, cln entir flr area of exciation room3&4, dust cln wal dor windo of exciat rm 3&4, cln entr flr area of h2 rm 3&4,stg 2, dust cln wal dor of hyd rm gt 3&4,stg 2, cln entr flr area of dmcw & phe room#2, dust cln wall ,dor of dmcw & phe room#2, cln entr road(gtgt3&4, stgt lt trns area, clng entire ground flr area hrsg iii&iv, cln drains & roads around hrsg iii&iv, w
Tender For establishment of integrated analytical laboratory for demil plant - hot air oven, magnetic stirrer, heating cooling circulator, rotary evaporator with chiller and vacuum pump, ultrasonic cleaner, high speed orbital shaker, vacuum pump, peristaltic pump, benchtop ph meter with orp electrode & necessary buffers, electrode storage solution & electrode cleaning solution, dissolved oxygen meter, turbidity meter, bench top multi-parameter tester (conductivity, tds, salinity, ph), bod incubator, cod digestor system, vortex mixer, effluent sampling manifold (esm) with controlled cobustion chamber (ccc), analytical balance, laboratory balance, mini centrifuge machine, gyro shaker, melting point apparatus, electric bunsen burner, deep freezer, laboratory rrefrigerator, ultra-pure water purification system, muffle furnace, double distillation unit, probe sonicator, heating mantles, systematic design, partitions, equipment console with work and storage modules, chemical reagent console with work and storage modules, instrument console with work and storage modules, overhead storage console, extended office console, office console, file storage console, record management console, back positioning module, fire protection modules, fume closet, exhaust manifold, power reserve (40 kva), elemental (chnso)analyzer, inductively coupled plasma - mass spectrometer (icp-ms), microwave digestion system, amc cost for 1st year after expiry of warranty period, amc cost for 2nd year after expiry of warranty period, amc cost for 3rd year after expiry of warranty period