Get complete information related to latest Cooling Pipe Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cooling Pipe Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cooling Pipe Tenders.
Tender For providing of repair and overhauling service - repairs and solvent cleaning onboard submarine batteries links coolingpipes- in ship; any other suitable brand; no; buyer premises
Tender For corrigendum : supply of set of spares for anestiwata compressor as detailed:1) oil seal to anestiwata part no: 91222000,qty/set: 10 nos,2) adopter to anestiwata part no: 91163590,qty/set: 05 nos,3) oil gauge packing to anestiwata part no: 91283000,qty/set: 05 nos,4) oil gauge set to anestiwata part no: slsp0034,qty/set:05 nos,5) oil gauge adapter to anestiwata part no: slsp0038,qty/set: 05 nos,6)stick oilgauge to anestiwata part no: slsp0041,qty/set: 05 nos,7) delivery pipe set (ac to final flange) to anestiwata part no: spcs0019,qty/set: 5 nos,8)intake filter set to anestiwata part no: slsp0035,qty/set: 5 nos,9)delivery flange assembly to anestiwata part no: spcs0026,qty/set: 05 nos,10) elbow,union to anestiwata part no: 96800282,qty/set: 05 nos,11) breather pipe to anestiwata part no: 91295000,qty/set: 05 nos,12)o-ring (delivery flange) to anestiwata part no: rr1000-35,qty/set: 05 nos,13)coolingpipe set to anestiwata part no: spcs0006,qty/set: 05 nos. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of set of flour silicon rubber 'o' rings as per els/aq sketch no. els/aq/wag-9/sk.no.0033/rev-02, suitable for transformer oil coolingpipes (metallic pipes) flange type-a,b,c,d,f,g,l, k & m as per abb id no: 3ehn.424150 & clw specn no. clw/es/3/0142 alt-f or latest for wag-9 loco [ warranty period: 30 months after the date of delivery ]
Tender For supply of a set of silicon rubber gasket "o" rings suitable for transformer oil coolingpipes (metalic pipes) flange type- a,b,c,d,f,g,k,l & m as per abb id no: 3ehn 424150 for wag-9 loco, as per sketch no: els/aq/wag-9/sk.no. 0033/rev-0.( this is shelf life items and should be procured with staggered delivery period. supplier to mention /print date of manufacturing on the item & item to be supplied within 90 days of manufacture date ) [ warranty period: 30 months after thedate of delivery ]
Tender For fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia coolingpipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur furnace , makin
Tender For supply of consumables for elemental analyser d d - combustion reduction tube quartz , copper 100 g , silver wool 50 g , tin boats thin 4 x 4 x 11 mm 1000 pc , cotton wool 50 g , copper oxide fine 250 g , o2 lance 140 mm