Tender For tender for supply of logbook - urea analysis register (lab) , wtp/sgp (lab) , raw material register (lab) , bag testing (lab) , neem oil analysis (lab) , natural gas analysis (lab) , log book (lab) , cooling water register (lab) , raw data register - neem urea analysis l , draft test report pad -urea (lab) , draft test report pad -water (lab) , attendance register (lab) , urea requisition slip pad (lab) , water requisition slip pad (lab) , map analysis register (lab) , methanol analysis register (lab) , plant oil analysis (lab) , logbook (lab) , waste water register (lab)
Tender For corrigendum : cleaning of drains and sweeping of roads, paths, cleaning of trash racks at cw pump house and coolingtowers, cleaning of stairs, railings etc. and work of 24x7 water supply in plant and non-plant buildings
Tender For corrigendum : supply, installation and testing (retrofit) of electric actuator with suitable new actuator of reputed make at main cooling water discharge side of main plant in hwp(m)
Tender For corrigendum : jp/b862-999-pb-t-8002/1011 - coolingtower package for pdh pp plant with ethane and propane handling facilities at dahej, gujarat
Tender For 8125/sar-t-08/2025-26 repair/ maint of summer cooling appliances, ac plant at annual rate contract and airwing area sarsawa under ge (af) sarsawa
Tender For repair maintenance of cooling summer appliances and internal wiring in domestic restricted area under dgqa units linac lpr ac plant 30m office building p800m nofra sqae a lpr cqa w sqae l sqae a cqa ofv of dgqa units and aqaw a under ge p no 1 jabalpur
Tender For carrying out the following miscellaneous maintenance jobs of amm-iii plant. i) modification of lube oil pipeline for facilitating additional continuous filtering of lube oil of pac ii) opening and box up of end covers of lube oil coolers of benfield solution pump and coolingtower pump t-1 drive turbine for cleaning of tubes iii) rectification of rack valve actuating mechanism of steam inlet pipeline to pac drive turbine iv) modification of prc condenser-c backwashing pipeline for replacement of defective valve with new one